X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0345042811000

Well Details

Well ID: 0345042811000
Loading map...
Location: 00/11-28-034-04W5/0
Location Alias: 00/11-28-34-04 W5M
Location Alias 2: 00/11-28-034-04 W5/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 04
Section: 28
County/Municipality: Clearwater County
Well Name: PWEI UNIT #2 GARR 11-28-34-4
Operator Name: TAQA North Ltd.
License Number: 0016013
License Date: 1958-10-08
License Status: RecCertified
Spud Date: 1958-10-23
Final Drill Date: 1958-11-12
Well Total Depth: 2374.10 m
Surface Hole Latitude: 51.949757
Surface Hole Longitude: -114.512315

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-10-08 Obtained License
1958-11-12 Finished Drilling
1958-11-12 Well Mode changed to Drilled and Cased
1958-11-13 Well Log Performed
1958-11-16 Production Casing Operation Performed
1958-11-23 Well Log Performed
1958-12-01 Perforation Treatment Performed - Bullet Perforation
1958-12-01 Perforation Treatment Performed - Cement Squeeze
1958-12-01 Perforation Treatment Performed - Jet Perforation
1958-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-12-12 Perforation Treatment Performed - Fractured
1958-12-24 Well Began Production
1958-12-24 Well Fluid changed to Crude Oil
1958-12-24 Well Mode changed to Flowing
1960-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-31 Perforation Treatment Performed - Fractured
1960-10-31 Perforation Treatment Performed - Jet Perforation
1961-06-08 Well Fluid changed to Crude Oil
1961-06-08 Well Mode changed to Pumping
1964-12-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-12-23 Perforation Treatment Performed - Fractured
1964-12-23 Perforation Treatment Performed - Jet Perforation
1965-04-19 Well Began Injection
1965-04-19 Well Fluid changed to Water
1965-04-19 Well Type changed to Injection
1966-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-12-14 Perforation Treatment Performed - Condensate Squeeze
1996-03-20 Well Fluid changed to Water
1996-03-20 Well Mode changed to Closed
1996-03-20 Well Type changed to Injection
1996-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-07 Plug Back Performed
1996-08-07 Well Fluid changed to Water
1996-08-07 Well Mode changed to Abandoned Zone
1996-08-07 Well Type changed to Injection
2000-07-15 Lost Circulation Occurred
2000-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-15 Perforation Treatment Performed - Jet Perforation
2000-07-15 Perforation Treatment Performed - Remedial Casing
2000-07-15 Well Log Performed
2000-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-17 Perforation Treatment Performed - Jet Perforation
2000-07-17 Perforation Treatment Performed - Remedial Casing
2000-07-17 Well Log Performed
2000-11-04 Well Abandoned
2000-11-04 Well Fluid changed to Water
2000-11-04 Well Mode changed to Abandoned
2000-11-04 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-12-01 Perforation 2300.90 2301.80 13
1960-10-31 Acid Treatment 2023.90 2024.80 0
1960-10-31 Fracture 2023.90 2024.80 0
1964-12-23 Perforation 2024.80 2027.50 13
1964-12-23 Acid Treatment 2023.90 2027.50 0
1964-12-23 Fracture 2023.90 2027.50 0
1966-12-14 Acid Treatment 2023.90 2027.50 0
1966-12-14 Condensate Squeeze 2023.90 2060.10 0
1996-08-07 Packing Device Capped w/Cement 2008.20 2016.20 0
2000-07-15 Perforation 625.00 626.00 14
2000-07-15 Remedial Casing Cementing 625.00 626.00 0
1958-12-01 Perforation 2306.40 2308.30 13
2000-07-15 Packing Device Capped w/Cement 600.00 619.50 0
2000-07-17 Perforation 250.00 251.00 14
2000-07-17 Remedial Casing Cementing 250.00 251.00 0
2000-07-17 Packing Device Capped w/Cement 204.90 242.90 0
1958-12-01 Cement Squeeze 2300.90 2308.30 0
1958-12-01 Bullet Perforation 2091.20 2091.50 13
1958-12-01 Cement Squeeze 2091.20 2091.50 13
1958-12-01 Bullet Perforation 2058.60 2060.10 13
1958-12-12 Acid Treatment 2058.60 2060.10 0
1958-12-12 Fracture 2058.60 2060.10 13
1960-10-31 Perforation 2023.90 2024.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2000-07-15 Lost Circulation 250.00 626.00

For data sources see[6]

References