If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274263115002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.354911,"lon":-113.644204,"icon":""}]} |
| Location: 00/15-31-027-26W4/2 | |
| Location Alias: 00/15-31-27-26 W4M | |
| Location Alias 2: 00/15-31-027-26 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 31 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 15-31-27-26 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0311353 | |
| License Date: 2004-07-06 | |
| License Status: Issued | |
| Spud Date: 2005-01-14 | |
| Final Drill Date: 2005-01-15 | |
| Well Total Depth: 824.00 m | |
| Surface Hole Latitude: 51.354911 | |
| Surface Hole Longitude: -113.644204 |
| Date | Event |
|---|---|
| 2004-07-06 | Obtained License |
| 2005-01-14 | Surface Casing Operation Performed |
| 2005-01-15 | Finished Drilling |
| 2005-01-15 | Production Casing Operation Performed |
| 2005-01-15 | Rig Released |
| 2005-01-15 | Well Mode changed to Drilled and Cased |
| 2005-01-28 | Well Log Performed |
| 2005-02-16 | Perforation Treatment Performed - Jet Perforation |
| 2005-03-20 | Perforation Treatment Performed - Fractured |
| 2007-01-23 | Perforation Treatment Performed - Jet Perforation |
| 2007-02-21 | Well Began Production |
| 2007-02-21 | Well Fluid changed to Gas |
| 2007-02-21 | Well Mode changed to Flowing |
| 2008-01-09 | Perforation Treatment Performed - Jet Perforation |
| 2008-01-19 | Perforation Treatment Performed - Fractured |
| 2008-04-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2008-04-01 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2005-02-16 | Perforation | 602.00 | 606.00 | 13 |
| 2008-01-09 | Perforation | 649.10 | 650.10 | 13 |
| 2008-01-09 | Perforation | 626.40 | 626.90 | 13 |
| 2008-01-09 | Perforation | 616.60 | 619.60 | 13 |
| 2008-01-09 | Perforation | 589.70 | 590.70 | 13 |
| 2008-01-09 | Perforation | 585.30 | 585.80 | 13 |
| 2008-01-09 | Perforation | 566.20 | 566.70 | 13 |
| 2008-01-09 | Perforation | 561.20 | 561.70 | 13 |
| 2008-01-09 | Perforation | 553.50 | 554.00 | 13 |
| 2008-01-09 | Perforation | 531.50 | 532.00 | 13 |
| 2008-01-09 | Perforation | 525.90 | 526.90 | 13 |
| 2005-03-20 | Fracture | 602.00 | 606.00 | 0 |
| 2008-01-09 | Perforation | 405.10 | 405.60 | 13 |
| 2008-01-09 | Perforation | 393.60 | 394.60 | 13 |
| 2008-01-09 | Perforation | 371.30 | 371.80 | 13 |
| 2008-01-09 | Perforation | 353.90 | 354.40 | 13 |
| 2008-01-09 | Perforation | 324.80 | 325.30 | 13 |
| 2008-01-09 | Perforation | 280.50 | 281.50 | 13 |
| 2008-01-09 | Perforation | 276.70 | 277.70 | 13 |
| 2008-01-09 | Perforation | 275.10 | 275.60 | 13 |
| 2008-01-19 | Fracture | 275.10 | 700.70 | 0 |
| 2007-01-23 | Perforation | 767.00 | 769.00 | 13 |
| 2008-01-09 | Perforation | 700.20 | 700.70 | 13 |
| 2008-01-09 | Perforation | 684.40 | 684.90 | 13 |
| 2008-01-09 | Perforation | 672.30 | 673.30 | 13 |
| 2008-01-09 | Perforation | 665.20 | 665.70 | 13 |
| 2008-01-09 | Perforation | 660.20 | 661.20 | 13 |
| 2008-01-09 | Perforation | 656.10 | 657.10 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2007 | 7352 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8743 | 0.0 | 0.0 | 0.0 |
| 2011 | 8754 | 0.0 | 0.0 | 0.0 |
| 2012 | 8782 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8728 | 0.0 | 0.0 | 0.0 |
| 2015 | 8684 | 0.0 | 0.0 | 0.0 |
| 2016 | 8724 | 0.0 | 0.0 | 0.0 |
| 2017 | 8580 | 0.0 | 0.0 | 0.0 |
| 2018 | 8697 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]