If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244262510000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.077956,"lon":-113.499396,"icon":""}]} |
Location: 00/10-25-024-26W4/0 | |
Location Alias: 00/10-25-24-26 W4M | |
Location Alias 2: 00/10-25-024-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 26 | |
Section: 25 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 10-25-24-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0429788 | |
License Date: 2011-01-12 | |
License Status: Issued | |
Spud Date: 2011-03-08 | |
Final Drill Date: 2011-03-09 | |
Well Total Depth: 987.00 m | |
Surface Hole Latitude: 51.077956 | |
Surface Hole Longitude: -113.499396 |
Date | Event |
---|---|
2011-01-12 | Obtained License |
2011-03-08 | Direction Drilling Operation Performed - Deviate |
2011-03-08 | Surface Casing Operation Performed |
2011-03-09 | Finished Drilling |
2011-03-09 | Production Casing Operation Performed |
2011-03-09 | Well Mode changed to Drilled and Cased |
2011-03-10 | Rig Released |
2011-03-16 | Well Log Performed |
2011-11-05 | Perforation Treatment Performed - Jet Perforation |
2011-11-16 | Perforation Treatment Performed - Fractured |
2011-11-26 | Perforation Treatment Performed - Jet Perforation |
2011-12-02 | Perforation Treatment Performed - Fractured |
2011-12-10 | Well Began Production |
2011-12-10 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-12-10 | Well Mode changed to Flowing |
2016-06-15 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-03-08 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-05 | Perforation | 692.00 | 694.00 | 13 |
2011-11-26 | Perforation | 313.80 | 314.30 | 13 |
2011-11-26 | Perforation | 321.10 | 322.10 | 13 |
2011-11-26 | Perforation | 364.20 | 364.70 | 13 |
2011-11-26 | Perforation | 366.00 | 366.50 | 13 |
2011-11-26 | Perforation | 409.20 | 409.70 | 13 |
2011-11-26 | Perforation | 423.40 | 423.90 | 13 |
2011-11-26 | Perforation | 428.70 | 430.20 | 13 |
2011-11-26 | Perforation | 440.90 | 441.40 | 13 |
2011-11-26 | Perforation | 448.20 | 448.70 | 13 |
2011-11-26 | Perforation | 451.90 | 452.90 | 13 |
2011-11-05 | Perforation | 880.50 | 883.50 | 13 |
2011-11-26 | Perforation | 470.40 | 470.90 | 13 |
2011-11-26 | Perforation | 474.00 | 475.50 | 13 |
2011-11-26 | Perforation | 486.50 | 489.50 | 13 |
2011-11-26 | Perforation | 492.00 | 494.00 | 13 |
2011-11-26 | Perforation | 498.20 | 498.70 | 13 |
2011-11-26 | Perforation | 505.00 | 508.00 | 13 |
2011-11-26 | Perforation | 531.00 | 534.00 | 13 |
2011-11-26 | Perforation | 556.30 | 557.80 | 13 |
2011-11-26 | Perforation | 561.20 | 561.70 | 13 |
2011-11-26 | Perforation | 575.50 | 576.50 | 13 |
2011-11-05 | Perforation | 901.00 | 902.00 | 13 |
2011-11-26 | Perforation | 581.60 | 583.10 | 13 |
2011-11-26 | Perforation | 586.40 | 587.90 | 13 |
2011-11-26 | Perforation | 626.70 | 627.20 | 13 |
2011-11-26 | Perforation | 631.80 | 632.30 | 13 |
2011-11-26 | Perforation | 633.50 | 634.50 | 13 |
2011-11-26 | Perforation | 637.60 | 638.10 | 13 |
2011-11-26 | Perforation | 934.50 | 935.00 | 13 |
2011-12-02 | Fracture | 269.60 | 935.00 | 0 |
2011-11-05 | Perforation | 931.00 | 934.00 | 13 |
2011-11-16 | Fracture | 692.00 | 694.00 | 0 |
2011-11-16 | Fracture | 880.50 | 883.50 | 0 |
2011-11-16 | Fracture | 901.00 | 902.00 | 0 |
2011-11-26 | Perforation | 269.60 | 270.10 | 13 |
2011-11-26 | Perforation | 298.40 | 299.40 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 528 | 0.0 | 0.0 | 0.0 |
2012 | 8318 | 0.0 | 0.0 | 0.0 |
2013 | 8601 | 0.0 | 0.0 | 0.0 |
2014 | 8540 | 0.0 | 0.0 | 0.0 |
2015 | 8694 | 0.0 | 0.0 | 0.0 |
2016 | 8375 | 0.0 | 0.0 | 0.0 |
2017 | 8572 | 0.0 | 0.0 | 0.0 |
2018 | 8021 | 0.0 | 0.0 | 0.0 |
2019 | 8397 | 0.0 | 0.0 | 0.0 |
2020 | 2145 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-06-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]