If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616052314004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.289814,"lon":-118.645879,"icon":""}]} |
Location: 00/14-23-061-05W6/4 | |
Location Alias: 00/14-23-61-05 W6M | |
Location Alias 2: 00/14-23-061-05 W6/04 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 05 | |
Section: 23 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ECA ECOG ET AL CHIME 14-23-61-5 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0379178 | |
License Date: 2007-07-11 | |
License Status: Amended | |
Spud Date: 2007-07-26 | |
Final Drill Date: 2007-08-23 | |
Well Total Depth: 3451.00 m | |
Surface Hole Latitude: 54.289814 | |
Surface Hole Longitude: -118.645879 |
Date | Event |
---|---|
2007-07-11 | Obtained License |
2007-07-26 | Lost Circulation Occurred |
2007-07-30 | Surface Casing Operation Performed |
2007-08-01 | Direction Drilling Operation Performed - Deviate |
2007-08-11 | Intermediate Casing Operation Performed |
2007-08-23 | Finished Drilling |
2007-08-23 | Well Mode changed to Drilled and Cased |
2007-08-24 | Well Log Performed |
2007-08-26 | Production Casing Operation Performed |
2007-08-26 | Rig Released |
2007-09-07 | Well Log Performed |
2007-09-08 | Perforation Treatment Performed - Jet Perforation |
2007-09-08 | Well Log Performed |
2007-09-10 | Perforation Treatment Performed - Jet Perforation |
2007-09-10 | Well Log Performed |
2007-09-11 | Perforation Treatment Performed - Fractured |
2007-09-12 | Well Log Performed |
2007-09-13 | Perforation Treatment Performed - Jet Perforation |
2007-09-13 | Well Log Performed |
2007-09-15 | Perforation Treatment Performed - Fractured |
2007-09-16 | Well Log Performed |
2007-09-17 | Perforation Treatment Performed - Jet Perforation |
2007-09-17 | Well Log Performed |
2007-09-18 | Perforation Treatment Performed - Fractured |
2007-09-18 | Perforation Treatment Performed - Jet Perforation |
2007-09-18 | Well Log Performed |
2007-09-19 | Perforation Treatment Performed - Fractured |
2007-09-19 | Well Fluid changed to Gas |
2007-09-19 | Well Mode changed to Testing |
2007-09-22 | Well Log Performed |
2007-10-01 | Well Structure changed to Commingled |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2007-08-01 | 641.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-09-08 | Perforation | 3224.00 | 3224.50 | 10 |
2007-09-13 | Perforation | 3120.20 | 3121.00 | 10 |
2007-09-15 | Fracture | 3120.20 | 3128.00 | 0 |
2007-09-17 | Perforation | 3068.50 | 3069.50 | 10 |
2007-09-17 | Perforation | 3056.00 | 3057.00 | 10 |
2007-09-17 | Perforation | 3026.50 | 3027.50 | 10 |
2007-09-18 | Fracture | 3056.00 | 3069.50 | 0 |
2007-09-18 | Fracture | 3026.50 | 3027.50 | 0 |
2007-09-18 | Perforation | 2774.00 | 2775.00 | 10 |
2007-09-18 | Perforation | 2758.50 | 2759.00 | 10 |
2007-09-18 | Perforation | 2753.20 | 2753.70 | 10 |
2007-09-08 | Perforation | 3220.50 | 3221.00 | 10 |
2007-09-18 | Perforation | 2737.20 | 2737.70 | 10 |
2007-09-19 | Fracture | 2737.20 | 2775.00 | 0 |
2007-09-08 | Perforation | 3215.50 | 3216.00 | 10 |
2007-09-08 | Perforation | 3209.70 | 3210.20 | 10 |
2007-09-10 | Perforation | 3232.00 | 3233.00 | 10 |
2007-09-11 | Fracture | 3232.00 | 3233.00 | 0 |
2007-09-11 | Fracture | 3209.70 | 3224.50 | 0 |
2007-09-13 | Perforation | 3127.50 | 3128.00 | 10 |
2007-09-13 | Perforation | 3124.50 | 3125.00 | 10 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2007-07-26 | Lost Circulation | 49.00 | 153.00 |
For data sources see[7]