If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616020306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.245978,"lon":-118.214673,"icon":""}]} |
Location: 00/06-03-061-02W6/0 | |
Location Alias: 00/06-03-61-02 W6M | |
Location Alias 2: 00/06-03-061-02 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 02 | |
Section: 03 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: STRATH RESTHA 6-3-61-2 | |
Operator Name: Strath Resources Ltd. | |
License Number: 0400243 | |
License Date: 2008-08-28 | |
License Status: Suspension | |
Spud Date: 2008-12-18 | |
Final Drill Date: 2009-01-19 | |
Well Total Depth: 3295.00 m | |
Surface Hole Latitude: 54.245978 | |
Surface Hole Longitude: -118.214673 |
Date | Event |
---|---|
2008-08-28 | Obtained License |
2008-12-21 | Surface Casing Operation Performed |
2009-01-04 | Well Log Performed |
2009-01-06 | Intermediate Casing Operation Performed |
2009-01-09 | Direction Drilling Operation Performed - Deviate |
2009-01-19 | Finished Drilling |
2009-01-19 | Well Mode changed to Drilled and Cased |
2009-01-20 | Well Log Performed |
2009-01-22 | Production Casing Operation Performed |
2009-01-23 | Well Log Performed |
2009-01-24 | Rig Released |
2009-02-04 | Well Log Performed |
2009-02-05 | Perforation Treatment Performed - Jet Perforation |
2009-02-06 | Perforation Treatment Performed - Fractured |
2009-02-07 | Perforation Treatment Performed - Jet Perforation |
2009-02-08 | Perforation Treatment Performed - Fractured |
2009-02-09 | Perforation Treatment Performed - Jet Perforation |
2009-02-10 | Perforation Treatment Performed - Fractured |
2009-02-10 | Well Log Performed |
2009-02-11 | Perforation Treatment Performed - Jet Perforation |
2009-02-11 | Well Log Performed |
2009-02-12 | Perforation Treatment Performed - Fractured |
2009-04-01 | Well Began Production |
2009-04-01 | Well Fluid changed to Gas |
2009-04-01 | Well Mode changed to Flowing |
2011-12-01 | Well Fluid changed to Gas |
2011-12-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-01-09 | 2022.70 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-05 | Perforation | 3165.00 | 3166.00 | 17 |
2009-02-08 | Fracture | 3057.00 | 3058.00 | 0 |
2009-02-08 | Fracture | 3033.50 | 3034.50 | 0 |
2009-02-08 | Fracture | 2966.00 | 2967.00 | 0 |
2009-02-09 | Perforation | 2881.50 | 2882.50 | 17 |
2009-02-10 | Fracture | 2881.50 | 2882.50 | 0 |
2009-02-11 | Perforation | 2690.50 | 2691.50 | 3 |
2009-02-11 | Perforation | 2674.00 | 2675.00 | 3 |
2009-02-11 | Perforation | 2666.00 | 2668.00 | 3 |
2009-02-11 | Perforation | 2649.00 | 2650.00 | 3 |
2009-02-11 | Perforation | 2623.00 | 2624.00 | 3 |
2009-02-06 | Fracture | 3165.00 | 3166.00 | 0 |
2009-02-12 | Fracture | 2690.50 | 2691.50 | 0 |
2009-02-12 | Fracture | 2674.00 | 2675.00 | 0 |
2009-02-12 | Fracture | 2666.00 | 2668.00 | 0 |
2009-02-12 | Fracture | 2649.00 | 2650.00 | 0 |
2009-02-12 | Fracture | 2623.00 | 2624.00 | 0 |
2009-02-07 | Perforation | 3094.00 | 3095.00 | 3 |
2009-02-07 | Perforation | 3078.50 | 3079.50 | 3 |
2009-02-07 | Perforation | 3057.00 | 3058.00 | 3 |
2009-02-07 | Perforation | 3033.50 | 3034.50 | 3 |
2009-02-07 | Perforation | 2966.00 | 2967.00 | 3 |
2009-02-08 | Fracture | 3094.00 | 3095.00 | 0 |
2009-02-08 | Fracture | 3078.50 | 3079.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 3762 | 0.0 | 0.0 | 0.0 |
2010 | 2385 | 0.0 | 0.0 | 0.0 |
2011 | 25 | 0.0 | 0.0 | 0.0 |
For data sources see[6]