X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156063309002

Well Details

Well ID: 1156063309002
Loading map...
Location: 00/09-33-115-06W6/2
Location Alias: 00/09-33-15-06 W6M
Location Alias 2: 00/09-33-115-06 W6/02
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 06
Section: 33
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 9-33-115-6
Operator Name: Paramount Resources Ltd.
License Number: 0032026
License Date: 1967-04-05
License Status: Suspension
Spud Date: 1967-04-07
Final Drill Date: 1967-05-16
Well Total Depth: 1653.80 m
Surface Hole Latitude: 59.030416
Surface Hole Longitude: -118.940642

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-04-05 Obtained License
1967-04-07 Direction Drilling Operation Performed - 98
1967-05-01 Drill Stem Test Performed
1967-05-04 Drill Stem Test Performed
1967-05-08 Production Casing Operation Performed
1967-05-08 Well Log Performed
1967-05-12 Drill Stem Test Performed
1967-05-13 Drill Stem Test Performed
1967-05-15 Drill Stem Test Performed
1967-05-16 Finished Drilling
1967-05-16 Well Mode changed to Drilled and Cased
1967-05-17 Well Log Performed
1967-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-06-13 Perforation Treatment Performed - Jet Perforation
1967-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-03-29 Perforation Treatment Performed - Jet Perforation
1978-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-12-01 Well Began Production
1978-12-01 Well Fluid changed to Gas
1978-12-01 Well Mode changed to Flowing
1990-09-06 Perforation Treatment Performed - Jet Perforation
1990-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-08-24 Well Log Performed
2000-08-25 Well Log Performed
2000-08-27 Well Log Performed
2000-11-23 Well Began Injection
2000-11-23 Well Fluid changed to Acid Gas
2000-11-23 Well Type changed to Disposal
2011-07-01 Well Fluid changed to Acid Gas
2011-07-01 Well Mode changed to Suspended
2011-07-01 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1967-04-07 865.30 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-06-13 Perforation 1414.30 1415.50 13
1967-06-13 Acid Treatment 1414.30 1415.50 0
1967-06-15 Acid Treatment 1414.30 1415.50 0
1978-03-29 Packing Device Capped w/Cement 1400.60 1408.20 0
1978-03-29 Perforation 1317.30 1324.70 3
1978-03-30 Acid Treatment 1317.30 1324.70 0
1990-09-06 Perforation 1317.30 1324.70 14
1990-09-14 Acid Treatment 1317.30 1324.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 640 0.0 0.0 0.0
1979 4171 0.0 0.0 0.0
1980 3425 0.0 0.0 0.0
1981 3721 0.0 0.0 0.0
1982 3635 0.0 0.0 0.0
1983 2311 0.0 0.0 0.0
1984 576 0.0 0.0 0.0
1985 3144 0.0 0.0 0.0
1986 4702 0.0 0.0 0.0
1987 7348 0.0 0.0 0.0
1988 5980 0.0 0.0 0.0
1989 3672 0.0 0.0 0.0
1990 6729 0.0 0.0 0.0
1991 7902 0.0 0.0 0.0
1992 8240 0.0 0.0 0.0
1993 5571 0.0 0.0 0.0
1994 8661 0.0 0.0 0.0
1995 5366 0.0 0.0 0.0
1996 6864 0.0 0.0 0.0
1997 7880 0.0 0.0 0.0
1998 7151 0.0 0.0 0.0
1999 157 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0

For data sources see[6]

References