If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0574110703004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.907237,"lon":-111.630945,"icon":""}]} |
Location: 00/03-07-057-11W4/4 | |
Location Alias: 00/03-07-57-11 W4M | |
Location Alias 2: 00/03-07-057-11 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 4 | |
Range: 11 | |
Section: 07 | |
County/Municipality: Saddle Lake 125 | |
Well Name: CNRL ET AL CACHE 3-7-57-11 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0145763 | |
License Date: 1990-10-09 | |
License Status: Abandoned | |
Spud Date: 1990-10-10 | |
Final Drill Date: 1990-10-13 | |
Well Total Depth: 716.00 m | |
Surface Hole Latitude: 53.907237 | |
Surface Hole Longitude: -111.630945 |
Date | Event |
---|---|
1990-10-09 | Obtained License |
1990-10-11 | Surface Casing Operation Performed |
1990-10-13 | Finished Drilling |
1990-10-13 | Well Log Performed |
1990-10-13 | Well Mode changed to Drilled and Cased |
1990-10-14 | Production Casing Operation Performed |
1990-10-14 | Rig Released |
1990-10-15 | Well Log Performed |
1990-10-17 | Perforation Treatment Performed - Jet Perforation |
1990-12-04 | Well Log Performed |
1990-12-05 | Perforation Treatment Performed - Jet Perforation |
1994-10-17 | Perforation Treatment Performed - Jet Perforation |
1994-10-17 | Well Log Performed |
1994-10-18 | Perforation Treatment Performed - Jet Perforation |
1996-02-13 | Well Log Performed |
1996-02-14 | Perforation Treatment Performed - Jet Perforation |
1996-02-14 | Well Began Production |
1996-02-14 | Well Fluid changed to Gas |
1996-02-14 | Well Mode changed to Flowing |
1996-10-31 | Well Fluid changed to Gas |
1996-10-31 | Well Mode changed to Suspended |
2010-06-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-06-12 | Plug Back Performed |
2010-06-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-06-13 | Plug Back Performed |
2010-06-13 | Well Fluid changed to Gas |
2010-06-13 | Well Mode changed to Abandoned Zone |
2010-06-25 | Well Abandoned |
2010-06-25 | Well Fluid changed to Gas |
2010-06-25 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-10-17 | Perforation | 599.00 | 601.00 | 13 |
2010-06-13 | Packing Device Capped w/Cement | 452.00 | 460.00 | 0 |
1990-12-05 | Perforation | 508.30 | 510.00 | 13 |
1990-12-05 | Perforation | 513.00 | 516.00 | 13 |
1994-10-17 | Perforation | 605.00 | 606.00 | 13 |
1994-10-18 | Perforation | 467.50 | 470.00 | 13 |
1996-02-14 | Perforation | 545.50 | 547.50 | 13 |
2010-06-12 | Packing Device Capped w/Cement | 547.50 | 590.00 | 0 |
2010-06-13 | Packing Device Capped w/Cement | 527.60 | 535.60 | 0 |
2010-06-13 | Packing Device Capped w/Cement | 492.00 | 500.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 360 | 0.0 | 0.0 | 0.0 |
For data sources see[5]