If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0664213113002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.759527,"lon":-113.176527,"icon":""}]} |
Location: 00/13-31-066-21W4/2 | |
Location Alias: 00/13-31-66-21 W4M | |
Location Alias 2: 00/13-31-066-21 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 066 | |
Meridian: 4 | |
Range: 21 | |
Section: 31 | |
County/Municipality: Athabasca County | |
Well Name: CNRL ATHAE 13-31-66-21 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0106466 | |
License Date: 1984-03-09 | |
License Status: RecCertified | |
Spud Date: 1984-03-21 | |
Final Drill Date: 1984-03-23 | |
Well Total Depth: 624.00 m | |
Surface Hole Latitude: 54.759527 | |
Surface Hole Longitude: -113.176527 |
Date | Event |
---|---|
1984-03-09 | Obtained License |
1984-03-23 | Finished Drilling |
1984-03-23 | Lost Circulation Occurred |
1984-03-23 | Well Mode changed to Drilled and Cased |
1984-03-24 | Well Log Performed |
1984-03-26 | Production Casing Operation Performed |
1984-06-24 | Perforation Treatment Performed - Jet Perforation |
1984-06-24 | Well Log Performed |
1986-06-10 | Perforation Treatment Performed - Cement Squeeze |
1986-06-10 | Plug Back Performed |
1986-06-12 | Perforation Treatment Performed - Jet Perforation |
1986-09-10 | Well Began Production |
1986-09-10 | Well Fluid changed to Gas |
1986-09-10 | Well Mode changed to Flowing |
1992-11-21 | Well Log Performed |
1992-11-25 | Perforation Treatment Performed - Cement Squeeze |
1992-11-25 | Plug Back Performed |
1992-11-28 | Perforation Treatment Performed - Jet Perforation |
1992-11-28 | Well Fluid changed to Gas |
1992-11-28 | Well Log Performed |
1992-11-28 | Well Mode changed to Flowing |
1994-07-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-07-24 | Well Fluid changed to Gas |
1994-07-24 | Well Log Performed |
1994-07-24 | Well Mode changed to Flowing |
1994-07-25 | Perforation Treatment Performed - Jet Perforation |
1999-06-30 | Well Fluid changed to Gas |
1999-06-30 | Well Mode changed to Suspended |
2003-08-26 | Perforation Treatment Performed - Jet Perforation |
2003-08-26 | Well Log Performed |
2003-08-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-08-27 | Perforation Treatment Performed - Jet Perforation |
2003-08-27 | Plug Back Performed |
2003-08-27 | Well Fluid changed to Gas |
2003-08-27 | Well Mode changed to Abandoned Zone |
2003-08-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-08-28 | Plug Back Performed |
2003-09-24 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-06-24 | Perforation | 619.00 | 621.00 | 0 |
1994-07-25 | Perforation | 458.50 | 460.00 | 13 |
2003-08-26 | Perforation | 524.50 | 526.00 | 17 |
2003-08-27 | Packing Device Capped w/Cement | 508.00 | 516.00 | 0 |
2003-08-27 | Perforation | 458.50 | 460.00 | 17 |
2003-08-27 | Perforation | 453.20 | 454.50 | 17 |
2003-08-28 | Packing Device Capped w/Cement | 436.00 | 444.00 | 0 |
1986-06-10 | Cement Squeeze | 619.00 | 621.00 | 0 |
1986-06-12 | Perforation | 524.50 | 526.00 | 13 |
1986-06-12 | Perforation | 435.50 | 436.50 | 13 |
1986-06-12 | Perforation | 440.00 | 442.50 | 13 |
1992-11-25 | Cement Squeeze | 435.50 | 442.50 | 0 |
1992-11-28 | Perforation | 601.00 | 602.50 | 13 |
1994-07-24 | Packing Device Capped w/Cement | 590.00 | 598.00 | 0 |
1994-07-25 | Perforation | 453.20 | 454.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 834 | 0.0 | 0.0 | 0.0 |
1987 | 4369 | 0.0 | 0.0 | 0.0 |
1988 | 2304 | 0.0 | 0.0 | 0.0 |
1989 | 161 | 0.0 | 0.0 | 0.0 |
1990 | 1302 | 0.0 | 0.0 | 0.0 |
1991 | 78 | 0.0 | 0.0 | 0.0 |
1992 | 3147 | 0.0 | 0.0 | 0.0 |
1993 | 1049 | 0.0 | 0.0 | 0.0 |
1994 | 7525 | 0.0 | 0.0 | 0.0 |
1995 | 7263 | 0.0 | 0.0 | 0.0 |
1996 | 2327 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1984-03-23 | Lost Circulation | 623.00 | 623.00 |
For data sources see[6]