If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786130807000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.733302,"lon":-119.931613,"icon":""}]} |
Location: 00/07-08-078-13W6/0 | |
Location Alias: 00/07-08-78-13 W6M | |
Location Alias 2: 00/07-08-078-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 13 | |
Section: 08 | |
County/Municipality: Saddle Hills County | |
Well Name: BIRCHCLIFF HZ PCOUPES 7-8-78-13 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0474824 | |
License Date: 2015-03-02 | |
License Status: Issued | |
Spud Date: 2015-03-19 | |
Final Drill Date: 2015-04-23 | |
Well Total Depth: 5088.00 m | |
Surface Hole Latitude: 55.733302 | |
Surface Hole Longitude: -119.931613 |
Date | Event |
---|---|
2015-03-02 | Obtained License |
2015-03-20 | Well Log Performed |
2015-03-21 | Surface Casing Operation Performed |
2015-04-09 | Direction Drilling Operation Performed - Deviate |
2015-04-16 | Direction Drilling Operation Performed - Horizontal |
2015-04-23 | Finished Drilling |
2015-04-23 | Well Log Performed |
2015-04-23 | Well Mode changed to Drilled and Cased |
2015-04-27 | Liner Casing Operation Performed |
2015-04-27 | Production Casing Operation Performed |
2015-04-27 | Rig Released |
2015-07-01 | Well Fluid changed to Gas |
2015-07-01 | Well Mode changed to Testing |
2015-07-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-07-09 | Perforation Treatment Performed - Open-Hole Completion |
2015-07-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-07-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-07-24 | Well Began Production |
2015-07-24 | Well Fluid changed to Gas |
2015-07-24 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-04-09 | Canelson Drilling Inc. | 39 | N/A | Resumption |
2015-03-19 | Canelson Drilling Inc. | 39 | N/A | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-04-09 | 949.20 | Deviate (5 - 79 degrees) |
2015-04-16 | 2647.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-07-09 | Open Hole/Barefoot Completion | 5028.00 | 5088.00 | 0 |
2015-07-17 | Multi-Stage Fracture | 4040.70 | 4041.50 | 0 |
2015-07-17 | Multi-Stage Fracture | 3909.50 | 3910.30 | 0 |
2015-07-17 | Multi-Stage Fracture | 3782.00 | 3782.80 | 0 |
2015-07-17 | Multi-Stage Fracture | 3651.60 | 3652.40 | 0 |
2015-07-17 | Multi-Stage Fracture | 3520.60 | 3521.40 | 0 |
2015-07-17 | Multi-Stage Fracture | 3389.70 | 3390.50 | 0 |
2015-07-17 | Multi-Stage Fracture | 3258.70 | 3259.50 | 0 |
2015-07-17 | Multi-Stage Fracture | 3128.30 | 3129.10 | 0 |
2015-07-17 | Multi-Stage Fracture | 2997.80 | 2998.60 | 0 |
2015-07-17 | Multi-Stage Fracture | 2867.00 | 2867.80 | 0 |
2015-07-09 | Multi-Stage Fracture | 5017.20 | 5018.00 | 0 |
2015-07-17 | Multi-Stage Fracture | 2736.00 | 2736.80 | 0 |
2015-07-18 | Multi-Stage Fracture | 2617.50 | 2618.30 | 0 |
2015-07-17 | Multi-Stage Fracture | 4955.20 | 4956.00 | 0 |
2015-07-17 | Multi-Stage Fracture | 4824.40 | 4825.20 | 0 |
2015-07-17 | Multi-Stage Fracture | 4694.00 | 4694.80 | 0 |
2015-07-17 | Multi-Stage Fracture | 4563.80 | 4564.60 | 0 |
2015-07-17 | Multi-Stage Fracture | 4432.80 | 4433.60 | 0 |
2015-07-17 | Multi-Stage Fracture | 4302.00 | 4302.80 | 0 |
2015-07-17 | Multi-Stage Fracture | 4171.60 | 4172.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-07-09 | 2015-07-18 | 2,417 | 7,440 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 82.6602 | N/A | |||
FRAC SAND. 30/50 WHITE | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 9.9964 | N/A | ||
FRAC SAND. 40/70 WHITE | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 4.443 | N/A | ||
Preferred Pearl RC. 30/50 | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 2.2238 | N/A | ||
Polyurethane Resin | Not Available | 100 | 2.2238 | N/A | ||||
2K7 Solution W-M | Baker Hughes | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0752 | N/A | |
Methanol | 67-56-1 | 100 | 0.0752 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0752 | N/A | ||||
Breaker N | Baker Hughes | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0022 | N/A | |
Nitrogen | Baker Hughes | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 0.4744 | N/A | |
MaxPerm-20A | Baker Hughes | Friction Reducer | Non-hazardous | 9014 | 100 | 0.1244 | N/A | |
Oxyalkylated alcohol | 9014 | 100 | 0.1244 | N/A | ||||
Petroleum distillates | 64742-47-8 | 100 | 0.1244 | N/A | ||||
Polyacrylate | 9014 | 100 | 0.1244 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-04-10 | 2015-06-06 | Recycled Fracturing Water (treated at well site) | 758 |
2015-07-02 | 2015-07-18 | Recycled Fracturing Water (treated at well site) | 1199 |
2015-07-14 | 2015-07-19 | Surface Water - Runoff | 4538 |
2015-07-03 | 2015-07-19 | Surface Water - Runoff | 835 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 3005 | 0.0 | 0.0 | 0.0 |
2016 | 8587 | 0.0 | 0.0 | 0.0 |
2017 | 8646 | 0.0 | 0.0 | 0.0 |
2018 | 8241 | 0.0 | 0.0 | 0.0 |
2019 | 8465 | 0.0 | 0.0 | 0.0 |
2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-04-27 | No Incident Encountered | 0.00 | 0.00 |
2015-07-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]