If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786102606002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.784542,"lon":-119.440774,"icon":""}]} |
Location: 00/06-26-078-10W6/2 | |
Location Alias: 00/06-26-78-10 W6M | |
Location Alias 2: 00/06-26-078-10 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 10 | |
Section: 26 | |
County/Municipality: Saddle Hills County | |
Well Name: ANADARKO PROGRESS 3-26-78-10 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0170166 | |
License Date: 1994-09-06 | |
License Status: Suspension | |
Spud Date: 1994-09-14 | |
Final Drill Date: 1995-06-12 | |
Well Total Depth: 1647.50 m | |
Surface Hole Latitude: 55.784542 | |
Surface Hole Longitude: -119.440774 |
Date | Event |
---|---|
1994-09-06 | Obtained License |
1994-09-15 | Surface Casing Operation Performed |
1994-09-22 | Intermediate Casing Operation Performed |
1995-06-12 | Finished Drilling |
1995-06-12 | Well Mode changed to Drilled and Cased |
1995-06-13 | Liner Casing Operation Performed |
1995-06-13 | Perforation Treatment Performed - Open-Hole Completion |
1995-06-13 | Perforation Treatment Performed - Slotted Liner or Casing |
1995-06-13 | Rig Released |
1995-10-01 | Well Began Production |
1995-10-01 | Well Fluid changed to Gas |
1995-10-01 | Well Mode changed to Flowing |
1996-06-06 | Direction Drilling Operation Performed - Horizontal |
1996-06-12 | Well Log Performed |
2001-10-24 | Well Fluid changed to Gas |
2001-10-24 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-06-06 | 1376.30 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-06-13 | Slotted Liner | 1370.00 | 1493.80 | 0 |
1995-06-13 | Open Hole/Barefoot Completion | 1493.80 | 1647.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 2153 | 0.0 | 0.0 | 0.0 |
1996 | 8619 | 0.0 | 0.0 | 0.0 |
1997 | 8625 | 0.0 | 0.0 | 0.0 |
1998 | 8212 | 0.0 | 0.0 | 0.0 |
1999 | 8488 | 0.0 | 0.0 | 0.0 |
2000 | 5106 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]