If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786081709000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.763179,"lon":-119.160449,"icon":""}]} |
Location: 00/09-17-078-08W6/0 | |
Location Alias: 00/09-17-78-08 W6M | |
Location Alias 2: 00/09-17-078-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 08 | |
Section: 17 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ PROGRESS 9-17-78-8 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0487762 | |
License Date: 2018-01-22 | |
License Status: Amended | |
Spud Date: 2018-02-05 | |
Final Drill Date: 2018-02-22 | |
Well Total Depth: 3369.00 m | |
Surface Hole Latitude: 55.763179 | |
Surface Hole Longitude: -119.160449 |
Date | Event |
---|---|
2018-01-22 | Obtained License |
2018-02-06 | Surface Casing Operation Performed |
2018-02-17 | Direction Drilling Operation Performed - Deviate |
2018-02-18 | Direction Drilling Operation Performed - Horizontal |
2018-02-19 | Intermediate Casing Operation Performed |
2018-02-22 | Finished Drilling |
2018-02-22 | Well Log Performed |
2018-02-22 | Well Mode changed to Drilled and Cased |
2018-02-23 | Liner Casing Operation Performed |
2018-02-23 | Rig Released |
2018-03-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-04-01 | Well Began Production |
2018-04-01 | Well Fluid changed to Crude Oil |
2018-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2018-02-17 | 883.60 | Deviate (5 - 79 degrees) |
2018-02-18 | 1769.80 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-03-26 | Multi-Stage Fracture | 3339.00 | 3339.10 | 0 |
2018-03-26 | Multi-Stage Fracture | 2818.20 | 2818.30 | 0 |
2018-03-26 | Multi-Stage Fracture | 2760.10 | 2760.20 | 0 |
2018-03-26 | Multi-Stage Fracture | 2701.90 | 2702.00 | 0 |
2018-03-26 | Multi-Stage Fracture | 2643.20 | 2643.30 | 0 |
2018-03-26 | Multi-Stage Fracture | 2584.60 | 2584.70 | 0 |
2018-03-26 | Multi-Stage Fracture | 2527.20 | 2527.30 | 0 |
2018-03-26 | Multi-Stage Fracture | 2469.30 | 2469.40 | 0 |
2018-03-26 | Multi-Stage Fracture | 2410.70 | 2410.80 | 0 |
2018-03-26 | Multi-Stage Fracture | 2352.30 | 2352.40 | 0 |
2018-03-26 | Multi-Stage Fracture | 2294.20 | 2294.30 | 0 |
2018-03-26 | Multi-Stage Fracture | 3281.40 | 3281.50 | 0 |
2018-03-26 | Multi-Stage Fracture | 2235.50 | 2235.60 | 0 |
2018-03-26 | Multi-Stage Fracture | 2177.20 | 2177.30 | 0 |
2018-03-26 | Multi-Stage Fracture | 2118.60 | 2118.70 | 0 |
2018-03-26 | Multi-Stage Fracture | 2060.10 | 2060.20 | 0 |
2018-03-26 | Multi-Stage Fracture | 2001.40 | 2001.50 | 0 |
2018-03-26 | Multi-Stage Fracture | 1944.70 | 1944.80 | 0 |
2018-03-26 | Multi-Stage Fracture | 1885.80 | 1885.90 | 0 |
2018-03-26 | Multi-Stage Fracture | 3223.90 | 3224.00 | 0 |
2018-03-26 | Multi-Stage Fracture | 3167.00 | 3167.10 | 0 |
2018-03-26 | Multi-Stage Fracture | 3108.60 | 3108.70 | 0 |
2018-03-26 | Multi-Stage Fracture | 3051.40 | 3051.50 | 0 |
2018-03-26 | Multi-Stage Fracture | 2992.90 | 2993.00 | 0 |
2018-03-26 | Multi-Stage Fracture | 2934.80 | 2934.90 | 0 |
2018-03-26 | Multi-Stage Fracture | 2876.20 | 2876.30 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-26 | 2018-03-26 | 1,594 | 4,186 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 90.9236 | N/A | |||
Sand - Tier 1 (40/70) | Trican Well Service | Aluminum Oxide | 1344-28-1 | 100 | 8.6946 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 8.6946 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 8.6946 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 8.6944 | N/A | ||||
AQUCAR DB20 Biocide | Trican Well Service | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0103 | N/A | |
2-mercaptoethanol | 60-24-2 | 100 | 0.0103 | N/A | ||||
dibromoacetonitrile | 3252-43-5 | 100 | 0.0103 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0103 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0103 | N/A | ||||
WBO-2 (Breaker Oxidizer) | Trican Well Service | Breaker | sodium persulfate | 7775-27-1 | 100 | 0.0217 | N/A | |
CC-8 Clay Stabilizer | Trican Well Service | Clay Control | choline chloride | 67-48-1 | 100 | 0.1111 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1111 | N/A | ||||
FR-23 Friction Reducer | Trican Well Service | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0805 | N/A | |
SI-18 (Scale Inhibitor) | Trican Well Service | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.047 | N/A | |
PFC-3 (Proppant Flowback Control) | Trican Well Service | Surfactant | aminofunctional polymer | Not Available | 100 | 0.0527 | N/A | |
glycol ether | Not Available | 100 | 0.0527 | N/A | ||||
petroleum distillate | Not Available | 100 | 0.0527 | N/A | ||||
Silicon compound 1 | Not Available | 100 | 0.0527 | N/A | ||||
S-17X (Surfactant) | Trican Well Service | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0582 | N/A | |
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0582 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0582 | N/A | ||||
methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0582 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0582 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 6091 | 0.0 | 0.0 | 0.0 |
2019 | 8533 | 0.0 | 0.0 | 0.0 |
2020 | 2145 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-22 | No Incident Encountered | 0.00 | 0.00 |
2018-03-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]