X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474163007023

Well Details

Well ID: 0474163007023
Loading map...
Location: 02/07-30-047-16W4/3
Location Alias: 02/07-30-47-16 W4M
Location Alias 2: 02/07-30-047-16 W4/03
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 16
Section: 30
County/Municipality: Camrose County
Well Name: PINE CLIFF BRUCE 7-30-47-16
Operator Name: Pine Cliff Energy Ltd.
License Number: 0067159
License Date: 1977-11-30
License Status: Abandoned
Spud Date: 1977-12-06
Final Drill Date: 1977-12-12
Well Total Depth: 999.70 m
Surface Hole Latitude: 53.079831
Surface Hole Longitude: -112.325129

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-11-30 Obtained License
1977-12-11 Drill Stem Test Performed
1977-12-12 Finished Drilling
1977-12-12 Well Mode changed to Drilled and Cased
1977-12-13 Drill Stem Test Performed
1977-12-14 Drill Stem Test Performed
1977-12-15 Production Casing Operation Performed
1978-01-20 Perforation Treatment Performed - Jet Perforation
1978-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-02-14 Well Log Performed
2004-02-19 Perforation Treatment Performed - Jet Perforation
2004-02-19 Well Log Performed
2004-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-20 Perforation Treatment Performed - Jet Perforation
2004-02-20 Plug Back Performed
2004-02-20 Well Log Performed
2004-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-21 Plug Back Performed
2004-02-21 Well Mode changed to Abandoned Zone
2004-02-22 Perforation Treatment Performed - Jet Perforation
2004-02-22 Well Log Performed
2004-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-24 Plug Back Performed
2008-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-30 Plug Back Performed
2008-12-01 Well Log Performed
2014-07-16 Well Log Performed
2014-07-17 Perforation Treatment Performed - Jet Perforation
2014-07-17 Well Log Performed
2014-07-19 Perforation Treatment Performed - Remedial Casing
2014-07-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-07-20 Perforation Treatment Performed - Jet Perforation
2014-07-20 Well Log Performed
2014-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-07-22 Perforation Treatment Performed - Remedial Casing
2015-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-02-27 Perforation Treatment Performed - Jet Perforation
2015-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-03-04 Perforation Treatment Performed - Remedial Casing
2015-03-05 Perforation Treatment Performed - Jet Perforation
2015-03-05 Perforation Treatment Performed - Remedial Casing
2015-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-07-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-07-20 Well Log Performed
2015-07-21 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-01-20 Perforation 798.90 801.00 7
2008-11-30 Packing Device Capped w/Cement 772.00 780.00 0
2014-07-17 Perforation 562.00 564.00 18
2014-07-19 Remedial Casing Cementing 562.00 564.00 0
2014-07-20 Packing Device Capped w/Cement 447.00 455.00 0
2014-07-20 Perforation 429.00 431.00 18
2014-07-22 Remedial Casing Cementing 429.00 431.00 0
2014-07-22 Packing Device Capped w/Cement 416.00 424.00 0
2015-02-27 Perforation 360.00 362.00 18
2015-02-27 Acid Treatment 360.00 362.00 0
2015-03-04 Remedial Casing Cementing 360.00 362.00 0
1978-01-20 Perforation 787.00 789.40 7
2015-03-04 Packing Device Capped w/Cement 348.00 356.00 0
2015-03-05 Perforation 252.00 254.00 18
2015-03-05 Remedial Casing Cementing 252.00 254.00 0
2015-03-07 Packing Device Capped w/Cement 240.00 248.00 0
2015-07-20 Packing Device Capped w/Cement 77.00 85.00 0
1978-01-21 Acid Treatment 787.00 801.00 0
2004-02-19 Perforation 940.00 941.80 20
2004-02-20 Packing Device Capped w/Cement 927.00 935.00 0
2004-02-20 Perforation 877.80 880.90 20
2004-02-21 Packing Device Capped w/Cement 865.00 873.00 0
2004-02-22 Perforation 830.90 832.70 20
2004-02-24 Packing Device Capped w/Cement 820.00 828.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-07-23 No Incident Encountered 0.00 0.00
2015-03-10 No Incident Encountered 0.00 0.00
2015-07-21 No Incident Encountered 0.00 0.00

For data sources see[5]

References