X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124072011002

Well Details

Well ID: 0124072011002
Loading map...
Location: 00/11-20-012-07W4/2
Location Alias: 00/11-20-12-07 W4M
Location Alias 2: 00/11-20-012-07 W4/02
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 07
Section: 20
County/Municipality: Cypress County
Well Name: CITY OF MEDICINE HAT 11-20-12-7
Operator Name: City Of Medicine Hat
License Number: 0059562
License Date: 1976-08-05
License Status: Issued
Spud Date: 1976-08-25
Final Drill Date: 1976-08-27
Well Total Depth: 621.80 m
Surface Hole Latitude: 50.013205
Surface Hole Longitude: -110.926458

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-08-05 Obtained License
1976-08-27 Finished Drilling
1976-08-27 Production Casing Operation Performed
1976-08-27 Well Mode changed to Drilled and Cased
1976-09-06 Perforation Treatment Performed - Selective Bullet Perforations
1976-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-14 Perforation Treatment Performed - Fractured
1976-09-21 Perforation Treatment Performed - Bullet Perforation
1976-09-21 Perforation Treatment Performed - Selective Bullet Perforations
1976-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-28 Perforation Treatment Performed - Fractured
1977-01-04 Well Began Production
1977-01-04 Well Fluid changed to Gas
1977-01-04 Well Mode changed to Flowing
1991-10-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-09-06 Selective Bullet Perforations 583.40 584.00 0
1976-09-06 Selective Bullet Perforations 594.10 597.40 0
1976-09-06 Selective Bullet Perforations 598.00 602.90 0
1976-09-06 Selective Bullet Perforations 603.80 604.40 0
1976-09-13 Acid Treatment 583.40 604.40 0
1976-09-14 Fracture 583.40 604.40 0
1976-09-21 Selective Bullet Perforations 392.00 392.60 0
1976-09-21 Selective Bullet Perforations 393.20 393.80 0
1976-09-21 Selective Bullet Perforations 394.10 394.40 0
1976-09-21 Selective Bullet Perforations 395.00 395.30 0
1976-09-21 Selective Bullet Perforations 395.60 396.20 0
1976-09-06 Selective Bullet Perforations 586.10 586.70 0
1976-09-21 Selective Bullet Perforations 396.80 397.80 0
1976-09-21 Selective Bullet Perforations 398.70 405.40 0
1976-09-21 Bullet Perforation 405.70 407.80 3
1976-09-21 Selective Bullet Perforations 413.30 435.90 0
1976-09-21 Selective Bullet Perforations 436.50 437.10 0
1976-09-21 Selective Bullet Perforations 437.70 438.30 0
1976-09-21 Selective Bullet Perforations 438.90 439.50 0
1976-09-21 Selective Bullet Perforations 440.10 452.30 0
1976-09-21 Selective Bullet Perforations 459.00 487.40 0
1976-09-21 Selective Bullet Perforations 501.70 501.70 0
1976-09-06 Selective Bullet Perforations 587.30 587.70 0
1976-09-27 Acid Treatment 392.00 501.70 0
1976-09-28 Fracture 392.00 501.70 0
1976-09-06 Selective Bullet Perforations 588.00 588.60 0
1976-09-06 Selective Bullet Perforations 589.20 589.50 0
1976-09-06 Selective Bullet Perforations 589.80 590.40 0
1976-09-06 Selective Bullet Perforations 591.00 591.30 0
1976-09-06 Selective Bullet Perforations 591.60 592.20 0
1976-09-06 Selective Bullet Perforations 592.80 593.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 8591 0.0 0.0 0.0
1978 8759 0.0 0.0 0.0
1979 8711 0.0 0.0 0.0
1980 8591 0.0 0.0 0.0
1981 8759 0.0 0.0 0.0
1982 8735 0.0 0.0 0.0
1983 8711 0.0 0.0 0.0
1984 8735 0.0 0.0 0.0
1985 8496 0.0 0.0 0.0
1986 8207 0.0 0.0 0.0
1987 8759 0.0 0.0 0.0
1988 8742 0.0 0.0 0.0
1989 8759 0.0 0.0 0.0
1990 8738 0.0 0.0 0.0
1991 6551 0.0 0.0 0.0

For data sources see[5]

References