If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465121106000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.929728,"lon":-115.638268,"icon":""}]} |
Location: 00/06-11-046-12W5/0 | |
Location Alias: 00/06-11-46-12 W5M | |
Location Alias 2: 00/06-11-046-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 12 | |
Section: 11 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 6-11-46-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0451174 | |
License Date: 2012-11-30 | |
License Status: Issued | |
Spud Date: 2013-03-09 | |
Final Drill Date: 2013-03-28 | |
Well Total Depth: 4505.00 m | |
Surface Hole Latitude: 52.929728 | |
Surface Hole Longitude: -115.638268 |
Date | Event |
---|---|
2012-11-30 | Obtained License |
2013-03-13 | Surface Casing Operation Performed |
2013-03-15 | Direction Drilling Operation Performed - Deviate |
2013-03-16 | Direction Drilling Operation Performed - Horizontal |
2013-03-17 | Well Log Performed |
2013-03-28 | Finished Drilling |
2013-03-28 | Well Log Performed |
2013-03-28 | Well Mode changed to Drilled and Cased |
2013-03-31 | Liner Casing Operation Performed |
2013-03-31 | Perforation Treatment Performed - Open-Hole Completion |
2013-03-31 | Production Casing Operation Performed |
2013-03-31 | Rig Released |
2013-10-12 | Well Log Performed |
2013-10-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-10-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-10-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-10-23 | Well Began Production |
2013-10-23 | Well Fluid changed to Crude Oil |
2013-10-23 | Well Mode changed to Flowing |
2013-10-30 | Well Log Performed |
2013-11-13 | Well Fluid changed to Crude Oil |
2013-11-13 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-03-09 | Precision Drilling Corporation | 309 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-03-15 | 1821.30 | Deviate (5 - 79 degrees) |
2013-03-16 | 2199.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-03-31 | Open Hole/Barefoot Completion | 4502.00 | 4505.00 | 0 |
2013-10-20 | Multi-Stage Fracture | 3916.80 | 3916.90 | 0 |
2013-10-20 | Multi-Stage Fracture | 3845.80 | 3845.90 | 0 |
2013-10-20 | Multi-Stage Fracture | 3775.20 | 3775.30 | 0 |
2013-10-20 | Multi-Stage Fracture | 3704.20 | 3704.30 | 0 |
2013-10-20 | Multi-Stage Fracture | 3633.80 | 3633.90 | 0 |
2013-10-20 | Multi-Stage Fracture | 3562.70 | 3562.80 | 0 |
2013-10-20 | Multi-Stage Fracture | 3491.70 | 3491.80 | 0 |
2013-10-20 | Multi-Stage Fracture | 3420.60 | 3420.70 | 0 |
2013-10-20 | Multi-Stage Fracture | 3363.00 | 3363.10 | 0 |
2013-10-21 | Multi-Stage Fracture | 3292.20 | 3292.30 | 0 |
2013-10-19 | Multi-Stage Fracture | 4477.50 | 4477.60 | 0 |
2013-10-21 | Multi-Stage Fracture | 3221.20 | 3221.30 | 0 |
2013-10-21 | Multi-Stage Fracture | 3152.60 | 3152.70 | 0 |
2013-10-21 | Multi-Stage Fracture | 3080.50 | 3080.60 | 0 |
2013-10-21 | Multi-Stage Fracture | 3010.10 | 3010.20 | 0 |
2013-10-21 | Multi-Stage Fracture | 2939.00 | 2939.10 | 0 |
2013-10-21 | Multi-Stage Fracture | 2867.90 | 2868.00 | 0 |
2013-10-21 | Multi-Stage Fracture | 2796.90 | 2797.00 | 0 |
2013-10-21 | Multi-Stage Fracture | 2725.80 | 2725.90 | 0 |
2013-10-21 | Multi-Stage Fracture | 2654.80 | 2654.90 | 0 |
2013-10-21 | Multi-Stage Fracture | 2583.80 | 2583.90 | 0 |
2013-10-19 | Multi-Stage Fracture | 4412.90 | 4413.00 | 0 |
2013-10-21 | Multi-Stage Fracture | 2512.80 | 2512.90 | 0 |
2013-10-21 | Multi-Stage Fracture | 2441.70 | 2441.80 | 0 |
2013-10-21 | Multi-Stage Fracture | 2370.80 | 2370.90 | 0 |
2013-10-21 | Multi-Stage Fracture | 2311.50 | 2311.60 | 0 |
2013-10-19 | Multi-Stage Fracture | 4341.90 | 4342.00 | 0 |
2013-10-19 | Multi-Stage Fracture | 4270.90 | 4271.00 | 0 |
2013-10-19 | Multi-Stage Fracture | 4200.00 | 4201.00 | 0 |
2013-10-19 | Multi-Stage Fracture | 4129.70 | 4129.80 | 0 |
2013-10-19 | Multi-Stage Fracture | 4058.60 | 4058.70 | 0 |
2013-10-20 | Multi-Stage Fracture | 3987.60 | 3987.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-10-19 | 2013-10-21 | 2,106 | 5,064 | N/A |
2 | 2013-10-20 | 2013-10-21 | 2,106 | 0 | N/A |
3 | 2013-10-19 | 2013-10-19 | 2,106 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 90.1259 | N/A | |||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.8468 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 3.5828 | N/A | ||
Tolcide PS75LT | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0205 | N/A | |
Water | 7732-18-5 | 100 | 0.0215 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.2388 | N/A | |
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.1131 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.1148 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.1134 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1298 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.1131 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.1145 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.1148 | N/A | ||||
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0818 | N/A | |
2 | 20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 2.8258 | N/A | |
3 | Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 7.9255 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-10-12 | 2013-10-21 | Surface Water - Runoff | 3490 |
2013-10-12 | 2013-10-21 | Recycled Fracturing Water (treated at well site) | 1282 |
2013-10-12 | 2013-10-21 | Recycled Fracturing Water (treated at well site) | 604 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 1259 | 0.0 | 0.0 | 0.0 |
2014 | 8506 | 0.0 | 0.0 | 0.0 |
2015 | 7634 | 0.0 | 0.0 | 0.0 |
2016 | 8598 | 0.0 | 0.0 | 0.0 |
2017 | 8489 | 0.0 | 0.0 | 0.0 |
2018 | 8696 | 0.0 | 0.0 | 0.0 |
2019 | 7744 | 0.0 | 0.0 | 0.0 |
2020 | 2125 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-03-31 | No Incident Encountered | 0.00 | 0.00 |
2013-10-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]