If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0104183311004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.867656,"lon":-112.389559,"icon":""}]} |
Location: 00/11-33-010-18W4/4 | |
Location Alias: 00/11-33-10-18 W4M | |
Location Alias 2: 00/11-33-010-18 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 010 | |
Meridian: 4 | |
Range: 18 | |
Section: 33 | |
County/Municipality: Municipal District of Taber | |
Well Name: CNRL TURIN 11-33-10-18 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0021259 | |
License Date: 1961-08-28 | |
License Status: RecCertified | |
Spud Date: 1961-08-28 | |
Final Drill Date: 1961-09-12 | |
Well Total Depth: 1164.90 m | |
Surface Hole Latitude: 49.867656 | |
Surface Hole Longitude: -112.389559 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1961-08-28 | Obtained License |
1961-09-04 | Drill Stem Test Performed |
1961-09-05 | Drill Stem Test Performed |
1961-09-06 | Drill Stem Test Performed |
1961-09-09 | Drill Stem Test Performed |
1961-09-12 | Finished Drilling |
1961-09-12 | Well Mode changed to Drilled and Cased |
1961-09-13 | Drill Stem Test Performed |
1961-09-14 | Drill Stem Test Performed |
1961-09-15 | Production Casing Operation Performed |
1961-09-20 | Perforation Treatment Performed - Jet Perforation |
1962-03-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1962-03-04 | Perforation Treatment Performed - Jet Perforation |
1962-03-04 | Perforation Treatment Performed - Selective Jet Perforations |
1979-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-09-15 | Perforation Treatment Performed - Jet Perforation |
1998-06-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-06-10 | Perforation Treatment Performed - Jet Perforation |
1998-06-10 | Plug Back Performed |
1998-06-14 | Well Began Production |
1998-06-14 | Well Fluid changed to Gas |
1998-06-14 | Well Mode changed to Flowing |
1998-08-01 | Well Fluid changed to Gas |
1998-08-01 | Well Mode changed to Suspended |
2004-01-22 | Well Fluid changed to Gas |
2004-01-22 | Well Mode changed to Abandoned Zone |
2004-06-22 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2004-06-22 | Well Log Performed |
2004-06-29 | Perforation Treatment Performed - Jet Perforation |
2004-06-30 | Perforation Treatment Performed - Remedial Casing |
2004-09-29 | Well Abandoned |
2004-09-29 | Well Fluid changed to Gas |
2004-09-29 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1961-09-20 | Perforation | 1069.20 | 1070.50 | 13 |
2004-06-29 | Perforation | 375.00 | 376.00 | 20 |
2004-06-30 | Remedial Casing Cementing | 375.00 | 376.00 | 0 |
1962-03-04 | Packing Device Capped w/Cement | 1066.80 | 1066.80 | 0 |
1962-03-04 | Perforation | 1060.70 | 1063.80 | 13 |
1962-03-04 | Selective Jet Perforations | 1063.80 | 1063.80 | 0 |
1979-09-14 | Packing Device Capped w/Cement | 1045.90 | 1055.00 | 0 |
1979-09-15 | Perforation | 1035.10 | 1037.20 | 13 |
1998-06-10 | Packing Device Capped w/Cement | 1027.50 | 1034.50 | 0 |
1998-06-10 | Perforation | 769.30 | 771.20 | 13 |
2004-06-22 | Bridge Plug, No Cement | 767.00 | 767.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 748 | 0.0 | 0.0 | 0.0 |
For data sources see[5]