If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375061606030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.177402,"lon":-114.799839,"icon":""}]} |
Location: 03/06-16-037-06W5/0 | |
Location Alias: 03/06-16-37-06 W5M | |
Location Alias 2: 03/06-16-037-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 06 | |
Section: 16 | |
County/Municipality: Clearwater County | |
Well Name: CVE GARR 6-16-37-6 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0384190 | |
License Date: 2007-11-02 | |
License Status: Issued | |
Spud Date: 2007-12-12 | |
Final Drill Date: 2007-12-17 | |
Well Total Depth: 2243.00 m | |
Surface Hole Latitude: 52.177402 | |
Surface Hole Longitude: -114.799839 |
Date | Event |
---|---|
2007-11-02 | Obtained License |
2007-12-13 | Surface Casing Operation Performed |
2007-12-17 | Finished Drilling |
2007-12-17 | Well Log Performed |
2007-12-17 | Well Mode changed to Drilled and Cased |
2007-12-19 | Well Log Performed |
2007-12-20 | Production Casing Operation Performed |
2007-12-20 | Rig Released |
2007-12-20 | Well Log Performed |
2008-01-10 | Well Log Performed |
2008-01-13 | Perforation Treatment Performed - Jet Perforation |
2008-01-13 | Well Log Performed |
2008-01-14 | Perforation Treatment Performed - Fractured |
2008-01-18 | Perforation Treatment Performed - Jet Perforation |
2008-01-18 | Perforation Treatment Performed - Remedial Casing |
2008-03-05 | Well Began Production |
2008-03-05 | Well Fluid changed to Crude Oil |
2008-03-05 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-01-13 | Perforation | 2198.00 | 2199.50 | 17 |
2008-01-14 | Fracture | 2198.00 | 2199.50 | 0 |
2008-01-18 | Perforation | 451.00 | 452.00 | 13 |
2008-01-18 | Remedial Casing Cementing | 451.00 | 452.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 7033 | 0.0 | 0.0 | 0.0 |
2009 | 8754 | 0.0 | 0.0 | 0.0 |
2010 | 8463 | 0.0 | 0.0 | 0.0 |
2011 | 8417 | 0.0 | 0.0 | 0.0 |
2012 | 8514 | 0.0 | 0.0 | 0.0 |
2013 | 8543 | 0.0 | 0.0 | 0.0 |
2014 | 6815 | 0.0 | 0.0 | 0.0 |
2015 | 7462 | 0.0 | 0.0 | 0.0 |
2016 | 8531 | 0.0 | 0.0 | 0.0 |
2017 | 8461 | 0.0 | 0.0 | 0.0 |
2018 | 8747 | 0.0 | 0.0 | 0.0 |
2019 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[5]