If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0464102813F13 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.002776,"lon":-111.405131,"icon":""}]} |
Location: F1/13-28-046-10W4/3 | |
Location Alias: F1/13-28-46-10 W4M | |
Location Alias 2: F1/13-28-046-10 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 4 | |
Range: 10 | |
Section: 28 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: PINE CLIFF VIK-KINS 13-28-46-10 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0398482 | |
License Date: 2008-07-14 | |
License Status: Amended | |
Spud Date: 2008-07-30 | |
Final Drill Date: 2008-08-02 | |
Well Total Depth: 870.00 m | |
Surface Hole Latitude: 53.002776 | |
Surface Hole Longitude: -111.405131 |
Date | Event |
---|---|
2008-07-14 | Obtained License |
2008-07-31 | Surface Casing Operation Performed |
2008-08-02 | Finished Drilling |
2008-08-02 | Well Mode changed to Drilled and Cased |
2008-08-03 | Production Casing Operation Performed |
2008-08-03 | Rig Released |
2008-08-13 | Well Log Performed |
2008-08-21 | Perforation Treatment Performed - Jet Perforation |
2008-08-21 | Well Log Performed |
2008-08-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2008-08-24 | Perforation Treatment Performed - Jet Perforation |
2008-08-24 | Well Log Performed |
2017-05-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-05-14 | Perforation Treatment Performed - Jet Perforation |
2017-05-14 | Plug Back Performed |
2017-06-01 | Well Began Production |
2017-06-01 | Well Fluid changed to Water |
2017-06-01 | Well Type changed to Source |
2019-02-20 | Perforation Treatment Performed - Jet Perforation |
2019-02-21 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-08-21 | Perforation | 824.00 | 828.00 | 17 |
2019-02-20 | Perforation | 777.00 | 780.00 | 17 |
2019-02-21 | Perforation | 701.00 | 704.00 | 17 |
2008-08-21 | Perforation | 829.50 | 833.50 | 17 |
2008-08-22 | Acid Treatment | 824.00 | 833.50 | 0 |
2008-08-24 | Perforation | 782.00 | 787.00 | 17 |
2008-08-24 | Perforation | 777.00 | 780.00 | 17 |
2017-05-14 | Packing Device Capped w/Cement | 806.00 | 814.00 | 0 |
2017-05-14 | Packing Device Capped w/Cement | 762.00 | 770.00 | 0 |
2017-05-14 | Perforation | 705.00 | 709.00 | 17 |
2019-02-20 | Perforation | 782.00 | 787.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 4967 | 0.0 | 0.0 | 0.0 |
2018 | 5094 | 0.0 | 0.0 | 0.0 |
2019 | 4506 | 0.0 | 0.0 | 0.0 |
2020 | 1399 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-05-31 | No Incident Encountered | 0.00 | 0.00 |
2019-02-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]