If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0885121111002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.617065,"lon":-115.779774,"icon":""}]} |
| Location: 00/11-11-088-12W5/2 | |
| Location Alias: 00/11-11-88-12 W5M | |
| Location Alias 2: 00/11-11-088-12 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 088 | |
| Meridian: 5 | |
| Range: 12 | |
| Section: 11 | |
| County/Municipality: Northern Sunrise County | |
| Well Name: MBOG EVI 11-11-88-12 | |
| Operator Name: Surge Energy Inc. | |
| License Number: 0439497 | |
| License Date: 2011-11-23 | |
| License Status: Amended | |
| Spud Date: 2012-04-23 | |
| Final Drill Date: 2012-05-16 | |
| Well Total Depth: 2899.00 m | |
| Surface Hole Latitude: 56.617065 | |
| Surface Hole Longitude: -115.779774 |
| Date | Event |
|---|---|
| 2011-11-23 | Obtained License |
| 2012-04-26 | Surface Casing Operation Performed |
| 2012-04-30 | Direction Drilling Operation Performed - Deviate |
| 2012-05-01 | Direction Drilling Operation Performed - Horizontal |
| 2012-05-03 | Intermediate Casing Operation Performed |
| 2012-05-09 | Well Log Performed |
| 2012-05-12 | Direction Drilling Operation Performed - Horizontal |
| 2012-05-12 | Well Log Performed |
| 2012-05-16 | Finished Drilling |
| 2012-05-16 | Well Mode changed to Drilled and Cased |
| 2012-05-17 | Well Log Performed |
| 2012-05-18 | Liner Casing Operation Performed |
| 2012-05-19 | Rig Released |
| 2012-07-07 | Well Log Performed |
| 2012-07-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-07-28 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-07-28 | Well Began Production |
| 2012-07-28 | Well Fluid changed to Crude Oil |
| 2012-07-28 | Well Mode changed to Flowing |
| 2013-03-17 | Well Fluid changed to Crude Oil |
| 2013-03-17 | Well Mode changed to Pumping |
| 2020-01-01 | Well Fluid changed to Crude Oil |
| 2020-01-01 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-04-30 | 1232.00 | Deviate (5 - 79 degrees) |
| 2012-05-01 | 1666.00 | Horizontal |
| 2012-05-12 | 1717.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-07-28 | Open Hole/Barefoot Completion | 2890.00 | 2899.00 | 0 |
| 2012-07-28 | Multi-Stage Fracture | 2426.40 | 2426.50 | 0 |
| 2012-07-28 | Multi-Stage Fracture | 2367.40 | 2367.50 | 0 |
| 2012-07-28 | Multi-Stage Fracture | 2308.10 | 2308.20 | 0 |
| 2012-07-28 | Multi-Stage Fracture | 2248.90 | 2249.00 | 0 |
| 2012-07-28 | Multi-Stage Fracture | 2189.60 | 2189.70 | 0 |
| 2012-07-28 | Multi-Stage Fracture | 2143.80 | 2143.90 | 0 |
| 2012-07-28 | Multi-Stage Fracture | 2084.90 | 2085.00 | 0 |
| 2012-07-28 | Multi-Stage Fracture | 2866.00 | 2866.10 | 0 |
| 2012-07-28 | Multi-Stage Fracture | 2814.00 | 2814.10 | 0 |
| 2012-07-28 | Multi-Stage Fracture | 2754.70 | 2754.80 | 0 |
| 2012-07-28 | Multi-Stage Fracture | 2709.10 | 2709.20 | 0 |
| 2012-07-28 | Multi-Stage Fracture | 2649.80 | 2649.90 | 0 |
| 2012-07-28 | Multi-Stage Fracture | 2590.50 | 2590.60 | 0 |
| 2012-07-28 | Multi-Stage Fracture | 2531.30 | 2531.40 | 0 |
| 2012-07-28 | Multi-Stage Fracture | 2472.10 | 2472.20 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 228 | 0.0 | 0.0 | 0.0 |
| 2013 | 6574 | 0.0 | 0.0 | 0.0 |
| 2014 | 8319 | 0.0 | 0.0 | 0.0 |
| 2015 | 8385 | 0.0 | 0.0 | 0.0 |
| 2016 | 8747 | 0.0 | 0.0 | 0.0 |
| 2017 | 8659 | 0.0 | 0.0 | 0.0 |
| 2018 | 7881 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-05-19 | No Incident Encountered | 0.00 | 0.00 |
| 2012-08-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]