X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626083616002

Well Details

Well ID: 0626083616002
Loading map...
Location: 00/16-36-062-08W6/2
Location Alias: 00/16-36-62-08 W6M
Location Alias 2: 00/16-36-062-08 W6/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 08
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ ROUTE 4-32-62-7
Operator Name: Jupiter Resources Inc.
License Number: 0454907
License Date: 2013-02-12
License Status: Amended
Spud Date: 2013-03-10
Final Drill Date: 2013-05-05
Well Total Depth: 5680.00 m
Surface Hole Latitude: 54.402063
Surface Hole Longitude: -119.017980

For data sources see[1][2]

Well History

Date Event
2013-02-12 Obtained License
2013-03-18 Surface Casing Operation Performed
2013-03-25 Direction Drilling Operation Performed - Deviate
2013-04-01 Intermediate Casing Operation Performed
2013-04-18 Direction Drilling Operation Performed - Horizontal
2013-04-18 Well Log Performed
2013-05-05 Finished Drilling
2013-05-05 Well Log Performed
2013-05-05 Well Mode changed to Drilled and Cased
2013-05-07 Liner Casing Operation Performed
2013-05-07 Perforation Treatment Performed - Open-Hole Completion
2013-05-10 Rig Released
2013-09-01 Well Log Performed
2013-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2013-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2013-09-06 Perforation Treatment Performed - Multi-Stage Fracture
2013-09-07 Perforation Treatment Performed - Multi-Stage Fracture
2013-09-08 Perforation Treatment Performed - Multi-Stage Fracture
2013-09-09 Perforation Treatment Performed - Jet Perforation
2013-09-15 Well Fluid changed to Gas
2013-09-15 Well Mode changed to Testing
2013-11-04 Well Began Production
2013-11-04 Well Fluid changed to Gas
2013-11-04 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2013-03-25 2521.40 Deviate (5 - 79 degrees)
2013-04-18 3338.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-05-07 Open Hole/Barefoot Completion 5665.00 5680.00 0
2013-09-06 Multi-Stage Fracture 5051.30 5052.60 0
2013-09-06 Multi-Stage Fracture 4981.00 4982.30 0
2013-09-06 Multi-Stage Fracture 4898.30 4899.60 0
2013-09-06 Multi-Stage Fracture 4829.20 4830.40 0
2013-09-06 Multi-Stage Fracture 4759.80 4761.00 0
2013-09-06 Multi-Stage Fracture 4677.20 4678.50 0
2013-09-07 Multi-Stage Fracture 4607.80 4609.10 0
2013-09-07 Multi-Stage Fracture 4525.10 4526.40 0
2013-09-07 Multi-Stage Fracture 4455.70 4456.90 0
2013-09-07 Multi-Stage Fracture 4385.90 4387.10 0
2013-09-04 Multi-Stage Fracture 5636.00 5641.10 0
2013-09-07 Multi-Stage Fracture 4302.80 4304.00 0
2013-09-07 Multi-Stage Fracture 4206.70 4208.00 0
2013-09-07 Multi-Stage Fracture 4124.20 4125.40 0
2013-09-07 Multi-Stage Fracture 4054.50 4055.70 0
2013-09-07 Multi-Stage Fracture 3971.10 3972.30 0
2013-09-08 Multi-Stage Fracture 3898.90 3900.10 0
2013-09-08 Multi-Stage Fracture 3827.60 3828.80 0
2013-09-08 Multi-Stage Fracture 3755.00 3756.20 0
2013-09-08 Multi-Stage Fracture 3671.10 3672.40 0
2013-09-08 Multi-Stage Fracture 3601.90 3603.10 0
2013-09-05 Multi-Stage Fracture 5578.60 5579.80 0
2013-09-08 Multi-Stage Fracture 3529.70 3530.90 0
2013-09-08 Multi-Stage Fracture 3443.70 3444.90 0
2013-09-08 Multi-Stage Fracture 3373.60 3374.80 0
2013-09-09 Perforation 3175.00 3176.00 10
2013-09-09 Perforation 3025.00 3026.00 10
2013-09-05 Multi-Stage Fracture 5509.60 5510.90 0
2013-09-05 Multi-Stage Fracture 5425.00 5426.20 0
2013-09-05 Multi-Stage Fracture 5352.20 5353.40 0
2013-09-05 Multi-Stage Fracture 5279.30 5280.50 0
2013-09-06 Multi-Stage Fracture 5207.40 5208.70 0
2013-09-06 Multi-Stage Fracture 5136.20 5137.40 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-09-04 2013-09-08 3,239 11,269 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 87.1405 N/A
100 Mesh Preferred Sands Crystalline Silica 14808-60-7 100 2.4995 N/A
40/70 Southwest Sands Crystalline Silica 14808-60-7 100 10.273 N/A
ASPEN-FR-27 Aspen Polymers Friction Reducer Ethylene Glycol 107-21-1 100 0.0026 N/A
Non-Hazardous Not Available 100 0.0848 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-07-19 2013-07-19 Surface Water - Runoff 30
2013-07-19 2013-09-01 Municipal Water 179
2013-09-02 2013-09-08 Surface Water - River 13652

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 1188 0.0 0.0 0.0
2014 8334 0.0 0.0 0.0
2015 8431 0.0 0.0 0.0
2016 1639 0.0 0.0 0.0
2017 3706 0.0 0.0 0.0
2018 2686 0.0 0.0 0.0
2019 773 0.0 0.0 0.0
2020 1864 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-05-10 No Incident Encountered 0.00 0.00
2013-09-19 No Incident Encountered 0.00 0.00

For data sources see[9]

References