If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0875090711000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.53321,"lon":-115.455373,"icon":""}]} |
Location: 00/11-07-087-09W5/0 | |
Location Alias: 00/11-07-87-09 W5M | |
Location Alias 2: 00/11-07-087-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 087 | |
Meridian: 5 | |
Range: 09 | |
Section: 07 | |
County/Municipality: Northern Sunrise County | |
Well Name: HARVEST HZ LOON 11-7-87-9 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0438763 | |
License Date: 2011-11-14 | |
License Status: Amended | |
Spud Date: 2012-02-03 | |
Final Drill Date: 2012-02-16 | |
Well Total Depth: 2881.00 m | |
Surface Hole Latitude: 56.533210 | |
Surface Hole Longitude: -115.455373 |
Date | Event |
---|---|
2011-11-14 | Obtained License |
2012-02-04 | Surface Casing Operation Performed |
2012-02-04 | Well Log Performed |
2012-02-06 | Direction Drilling Operation Performed - Deviate |
2012-02-09 | Intermediate Casing Operation Performed |
2012-02-10 | Direction Drilling Operation Performed - Horizontal |
2012-02-16 | Finished Drilling |
2012-02-16 | Well Log Performed |
2012-02-16 | Well Mode changed to Drilled and Cased |
2012-02-17 | Liner Casing Operation Performed |
2012-02-18 | Rig Released |
2012-02-29 | Well Log Performed |
2012-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-11 | Well Began Production |
2012-05-11 | Well Fluid changed to Crude Oil |
2012-05-11 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-03 | Trinidad Drilling Ltd. | 91 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-06 | 1088.00 | Deviate (5 - 79 degrees) |
2012-02-10 | 1449.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-08 | Multi-Stage Fracture | 2800.00 | 2803.90 | 0 |
2012-03-08 | Multi-Stage Fracture | 2157.80 | 2161.70 | 0 |
2012-03-09 | Multi-Stage Fracture | 2086.40 | 2090.30 | 0 |
2012-03-09 | Multi-Stage Fracture | 2015.00 | 2019.00 | 0 |
2012-03-09 | Multi-Stage Fracture | 1943.70 | 1947.60 | 0 |
2012-03-09 | Multi-Stage Fracture | 1872.30 | 1876.30 | 0 |
2012-03-09 | Multi-Stage Fracture | 1801.00 | 1804.90 | 0 |
2012-03-09 | Multi-Stage Fracture | 1729.60 | 1733.50 | 0 |
2012-03-09 | Multi-Stage Fracture | 1658.20 | 1662.20 | 0 |
2012-03-09 | Multi-Stage Fracture | 1586.90 | 1590.80 | 0 |
2012-03-09 | Multi-Stage Fracture | 1515.50 | 1519.50 | 0 |
2012-03-08 | Multi-Stage Fracture | 2728.60 | 2732.60 | 0 |
2012-03-08 | Multi-Stage Fracture | 2657.30 | 2661.20 | 0 |
2012-03-08 | Multi-Stage Fracture | 2585.90 | 2589.90 | 0 |
2012-03-08 | Multi-Stage Fracture | 2514.60 | 2518.50 | 0 |
2012-03-08 | Multi-Stage Fracture | 2443.20 | 2447.10 | 0 |
2012-03-08 | Multi-Stage Fracture | 2371.80 | 2375.80 | 0 |
2012-03-08 | Multi-Stage Fracture | 2300.50 | 2304.40 | 0 |
2012-03-08 | Multi-Stage Fracture | 2229.10 | 2233.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4517 | 0.0 | 0.0 | 0.0 |
2013 | 7659 | 0.0 | 0.0 | 0.0 |
2014 | 8475 | 0.0 | 0.0 | 0.0 |
2015 | 7635 | 0.0 | 0.0 | 0.0 |
2016 | 8337 | 0.0 | 0.0 | 0.0 |
2017 | 8154 | 0.0 | 0.0 | 0.0 |
2018 | 8373 | 0.0 | 0.0 | 0.0 |
2019 | 8366 | 0.0 | 0.0 | 0.0 |
2020 | 1994 | 0.0 | 0.0 | 0.0 |
For data sources see[7]