X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444082503000

Well Details

Well ID: 0444082503000
Loading map...
Location: 00/03-25-044-08W4/0
Location Alias: 00/03-25-44-08 W4M
Location Alias 2: 00/03-25-044-08 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 08
Section: 25
County/Municipality: Municipal District of Wainwright No. 61
Well Name: CLEO ENERGY KILLAM 3-25-44-8
Operator Name: Cleo Energy Corp.
License Number: 0158120
License Date: 1993-05-06
License Status: Issued
Spud Date: 1993-05-13
Final Drill Date: 1993-05-14
Well Total Depth: 751.00 m
Surface Hole Latitude: 52.817788
Surface Hole Longitude: -111.037491

For data sources see[1][2]

Well History

Date Event
1993-05-06 Obtained License
1993-05-13 Surface Casing Operation Performed
1993-05-14 Finished Drilling
1993-05-14 Lost Circulation Occurred
1993-05-14 Well Mode changed to Drilled and Cased
1993-05-15 Well Log Performed
1993-05-16 Production Casing Operation Performed
1993-05-16 Rig Released
1993-05-16 Well Log Performed
1993-06-07 Well Log Performed
1993-06-16 Perforation Treatment Performed - Jet Perforation
1993-06-17 Perforation Treatment Performed - Cement Squeeze
1993-06-20 Perforation Treatment Performed - Jet Perforation
1993-06-20 Well Log Performed
1993-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-21 Perforation Treatment Performed - Jet Perforation
1993-06-21 Plug Back Performed
1993-11-18 Well Began Production
1993-11-18 Well Fluid changed to Gas
1993-11-18 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-06-16 Perforation 652.00 655.30 13
1993-06-17 Cement Squeeze 652.00 655.30 0
1993-06-20 Perforation 652.00 654.00 13
1993-06-21 Packing Device Capped w/Cement 639.00 647.00 0
1993-06-21 Perforation 607.00 608.50 13
1993-06-21 Perforation 609.70 612.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1052 0.0 0.0 0.0
1994 8715 0.0 0.0 0.0
1995 8728 0.0 0.0 0.0
1996 8728 0.0 0.0 0.0
1997 8712 0.0 0.0 0.0
1998 8506 0.0 0.0 0.0
1999 8714 0.0 0.0 0.0
2000 8776 0.0 0.0 0.0
2001 8758 0.0 0.0 0.0
2002 8699 0.0 0.0 0.0
2003 8109 0.0 0.0 0.0
2004 8776 0.0 0.0 0.0
2005 8748 0.0 0.0 0.0
2006 8728 0.0 0.0 0.0
2007 8702 0.0 0.0 0.0
2008 6587 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8741 0.0 0.0 0.0
2011 8616 0.0 0.0 0.0
2012 8778 0.0 0.0 0.0
2013 8686 0.0 0.0 0.0
2014 8443 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8639 0.0 0.0 0.0
2017 8644 0.0 0.0 0.0
2018 6478 0.0 0.0 0.0
2019 7689 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-05-14 Lost Circulation 751.00 751.00

For data sources see[6]

References