If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0734261609003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.325131,"lon":-113.93513,"icon":""}]} |
Location: 00/09-16-073-26W4/3 | |
Location Alias: 00/09-16-73-26 W4M | |
Location Alias 2: 00/09-16-073-26 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 073 | |
Meridian: 4 | |
Range: 26 | |
Section: 16 | |
County/Municipality: Municipal District of Lesser Slave River No. 124 | |
Well Name: HARVEST MARTENH 9-16-73-26 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0136667 | |
License Date: 1988-09-27 | |
License Status: Abandoned | |
Spud Date: 1988-10-14 | |
Final Drill Date: 1988-10-18 | |
Well Total Depth: 619.00 m | |
Surface Hole Latitude: 55.325131 | |
Surface Hole Longitude: -113.935130 |
Date | Event |
---|---|
1988-09-27 | Obtained License |
1988-10-15 | Surface Casing Operation Performed |
1988-10-18 | Finished Drilling |
1988-10-18 | Well Mode changed to Drilled and Cased |
1988-10-20 | Well Log Performed |
1988-10-21 | Production Casing Operation Performed |
1988-10-22 | Rig Released |
1988-11-01 | Well Log Performed |
1988-11-02 | Perforation Treatment Performed - Jet Perforation |
1988-11-02 | Well Log Performed |
1988-11-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-11-04 | Well Log Performed |
1988-11-05 | Perforation Treatment Performed - Jet Perforation |
1988-11-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-11-08 | Perforation Treatment Performed - Jet Perforation |
1988-11-08 | Well Log Performed |
1988-11-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-11-24 | Perforation Treatment Performed - Jet Perforation |
1989-02-16 | Well Began Production |
1989-02-16 | Well Fluid changed to Gas |
1989-02-16 | Well Mode changed to Flowing |
1990-07-12 | Perforation Treatment Performed - Jet Perforation |
1990-07-12 | Well Fluid changed to Gas |
1990-07-12 | Well Log Performed |
1990-07-12 | Well Mode changed to Flowing |
1995-09-01 | Well Fluid changed to Gas |
1995-09-01 | Well Mode changed to Suspended |
1997-01-10 | Well Fluid changed to Gas |
1997-01-10 | Well Mode changed to Flowing |
1999-05-10 | Well Fluid changed to Gas |
1999-05-10 | Well Mode changed to Suspended |
1999-06-15 | Perforation Treatment Performed - Cement Squeeze |
1999-06-15 | Plug Back Performed |
1999-06-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-06-17 | Perforation Treatment Performed - Jet Perforation |
1999-06-17 | Plug Back Performed |
1999-06-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-06-18 | Perforation Treatment Performed - Jet Perforation |
1999-06-18 | Plug Back Performed |
2000-11-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-11-14 | Perforation Treatment Performed - Jet Perforation |
2000-11-14 | Plug Back Performed |
2000-11-14 | Well Fluid changed to Gas |
2000-11-14 | Well Log Performed |
2000-11-14 | Well Mode changed to Abandoned Zone |
2000-11-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-11-15 | Perforation Treatment Performed - Remedial Casing |
2000-11-15 | Plug Back Performed |
2000-11-15 | Well Log Performed |
2001-01-12 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-11-02 | Perforation | 595.50 | 597.50 | 13 |
1999-06-17 | Packing Device Capped w/Cement | 559.00 | 567.00 | 0 |
1999-06-17 | Perforation | 491.00 | 493.00 | 13 |
1999-06-17 | Perforation | 481.50 | 482.50 | 13 |
1999-06-17 | Perforation | 476.00 | 479.00 | 13 |
1999-06-18 | Packing Device Capped w/Cement | 480.00 | 488.00 | 0 |
1999-06-18 | Perforation | 470.00 | 473.00 | 13 |
1999-06-18 | Perforation | 429.00 | 431.00 | 13 |
1999-06-18 | Packing Device Capped w/Cement | 458.00 | 466.00 | 0 |
2000-11-14 | Packing Device Capped w/Cement | 450.00 | 458.00 | 0 |
2000-11-14 | Packing Device Capped w/Cement | 400.00 | 423.00 | 0 |
1988-11-03 | Acid Treatment | 595.50 | 597.50 | 0 |
2000-11-14 | Perforation | 371.00 | 372.00 | 13 |
2000-11-15 | Packing Device Capped w/Cement | 375.00 | 400.00 | 0 |
2000-11-15 | Remedial Casing Cementing | 371.00 | 372.00 | 0 |
1988-11-05 | Perforation | 579.50 | 581.50 | 13 |
1988-11-06 | Acid Treatment | 579.50 | 581.50 | 0 |
1988-11-08 | Perforation | 574.00 | 575.00 | 14 |
1988-11-10 | Acid Treatment | 574.00 | 575.00 | 0 |
1988-11-24 | Perforation | 569.50 | 571.50 | 13 |
1990-07-12 | Perforation | 402.50 | 404.00 | 13 |
1999-06-15 | Cement Squeeze | 402.50 | 404.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 4263 | 0.0 | 0.0 | 0.0 |
1990 | 5205 | 0.0 | 0.0 | 0.0 |
1991 | 7221 | 0.0 | 0.0 | 0.0 |
1992 | 8346 | 0.0 | 0.0 | 0.0 |
1993 | 8627 | 0.0 | 0.0 | 0.0 |
1994 | 8287 | 0.0 | 0.0 | 0.0 |
1995 | 1898 | 0.0 | 0.0 | 0.0 |
1997 | 8591 | 0.0 | 0.0 | 0.0 |
1998 | 6309 | 0.0 | 0.0 | 0.0 |
For data sources see[5]