If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-37196 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.438077,"lon":-79.160591,"icon":""}]} |
Operator Name: KRIEBEL MINERALS INC | |
First Permit Date: 2011-09-09 | |
Last Permit Date: 2011-09-09 | |
Spud Date: 2012-02-13 | |
Unconventional: No | |
Horizontal: No | |
Violations: 1 | |
Latitude: 40.438077 | |
Longitude: -79.160591 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 6341.0 | 334.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 4881.0 | 273.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | DRILLING FLUID WASTE | 1600.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2012-0 | DRILLING FLUID WASTE | 210.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2012-0 | FRACING FLUID WASTE | 2220.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2012-0 | DRILLING FLUID WASTE | 1600.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2012-0 | DRILLING FLUID WASTE | 210.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2012-0 | FRACING FLUID WASTE | 2220.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2042700 | 2012-02-14 | No Violations Noted | Kriebel had contracted Falcon. E&S controls and well sign were present. No freeboard issues and no E&S issues were present at the time of inspection. Conductor pipe was installed to 42 feet (13 3/8¿) and sanded in. Water was encountered at 235¿, 825¿, and 1080¿. Falcon was drilling at current depth of 1,200 feet. The projected Surface/Water protection casing (7¿) was going to be set at 1,612 feet | |
2043989 | 2012-02-16 | No Violations Noted | Kriebel had contracted Falcon. E&S controls and well sign were present. No freeboard issues and no E&S issues were present at the time of inspection. The Surface/Water protection casing (7”) was set at 1,612 feet and was cemented with 285 sacks of Type I. No cement return was recorded on the 7” piping. According to Steve Pavlchick, Kriebel was going to cement the production string to surface. Plug was down on 00:00 hrs.’ on 2/14/12. Falcon was currently drilling at 2, 850 feet. | |
2045751 | 2012-02-24 | Violation(s) Noted | Site visit was due to spud notification.
Well was drilled and frac'ed. Kriebel rig was running tubing during inspection. Access road and pad was muddy but stable. Both pit liner and impoundment liner were held in place by either metal or wooden stakes through the liner. This construction method comprimises the integrity of the liner. Pit liner should be back filled and not staked. Sed fence was used as the BMP. It also had been comprimised. Pressure from fill against the fence caused fence to tear in numerous places. Also the sed-fence was not properly installed (not properly trenched) in some spots. No accelerated erosion was taking place. These are recurring issues with Kriebel well pads and have been noted in previous inspections. |
632802 |
2152230 | 2013-03-22 | Indiana | Burrell Twp | No Violations Noted |
2152683 | 2013-03-22 | Indiana | Burrell Twp | No Violations Noted |