X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0494100804000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0494100804000
 
| Well ID: 0494100804000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.20784200000002784, -111.43762399999997115 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.207842, -111.437624 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/04-08-049-10W4/0
 
| Location: 00/04-08-049-10W4/0
 
|-
 
|-
| Well Name: SPUR VIK-KINS 4-8-49-10
+
| Location Alias: 00/04-08-49-10 W4M
 +
|-
 +
| Location Alias 2: 00/04-08-049-10 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 049
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 10
 +
|-
 +
| Section: 08
 +
|-
 +
| County/Municipality: [[County of Minburn No. 27,_Alberta|County of Minburn No. 27]]
 +
|-
 +
| Well Name: SPL VIK-KINS 4-8-49-10
 +
|-
 +
| Operator Name: [[Spur Petroleum Ltd.]]
 +
|-
 +
| License Number: 0243977
 
|-
 
|-
 
| License Date: 2000-11-03
 
| License Date: 2000-11-03
 
|-
 
|-
| Final Drilling Date: 2000-11-15
+
| License Status: Issued
 
|-
 
|-
| Total Depth: 765.0m
+
| Spud Date: 2000-11-14
 
|-
 
|-
| Fluid Type: Gas
+
| Final Drill Date: 2000-11-15
 
|-
 
|-
| Status: Abandoned Zone
+
| Well Total Depth: 765.00 m
 
|-
 
|-
| Well Type: Not Applicable
+
| Surface Hole Latitude: 53.207842
 
|-
 
|-
| Configuration: Horizontal
+
| Surface Hole Longitude: -111.437624
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 
|-
 
|-
| Latitude: 53.20784200000002784
+
| 2000-11-03
 +
| Obtained License
 
|-
 
|-
| Longitude: -111.43762399999997115
+
| 2000-11-14
 +
| Surface Casing Operation Performed
 
|-
 
|-
 +
| 2000-11-15
 +
| Finished Drilling
 +
|-
 +
| 2000-11-16
 +
| Production Casing Operation Performed
 +
|-
 +
| 2000-11-16
 +
| Well Log Performed
 +
|-
 +
| 2000-11-17
 +
| Rig Released
 +
|-
 +
| 2000-11-17
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2000-11-24
 +
| Well Log Performed
 +
|-
 +
| 2000-11-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-11-29
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2000-11-29
 +
| Well Log Performed
 +
|-
 +
| 2000-12-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-12-01
 +
| Well Log Performed
 +
|-
 +
| 2000-12-03
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2000-12-04
 +
| Well Log Performed
 +
|-
 +
| 2000-12-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-12-05
 +
| Well Log Performed
 +
|-
 +
| 2001-01-24
 +
| Well Began Production
 +
|-
 +
| 2001-01-24
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2001-01-24
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2004-03-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2004-03-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2006-07-25
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2006-07-25
 +
| Plug Back Performed
 +
|-
 +
| 2006-07-25
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2006-07-25
 +
| Well Log Performed
 +
|-
 +
| 2006-07-25
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2006-07-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-07-26
 +
| Well Log Performed
 +
|-
 +
| 2006-07-27
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2000-11-29
 +
| Perforation
 +
| style="text-align: right;" | 220.00
 +
| style="text-align: right;" | 221.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2000-11-29
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 220.00
 +
| style="text-align: right;" | 221.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-12-01
 +
| Perforation
 +
| style="text-align: right;" | 696.60
 +
| style="text-align: right;" | 698.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2000-12-03
 +
| Cement Squeeze
 +
| style="text-align: right;" | 696.60
 +
| style="text-align: right;" | 698.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-12-05
 +
| Perforation
 +
| style="text-align: right;" | 694.00
 +
| style="text-align: right;" | 695.50
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2000-12-05
 +
| Perforation
 +
| style="text-align: right;" | 718.00
 +
| style="text-align: right;" | 719.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2000-12-05
 +
| Perforation
 +
| style="text-align: right;" | 713.50
 +
| style="text-align: right;" | 715.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2000-12-05
 +
| Perforation
 +
| style="text-align: right;" | 716.00
 +
| style="text-align: right;" | 717.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2006-07-25
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 682.00
 +
| style="text-align: right;" | 690.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-07-25
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 692.00
 +
| style="text-align: right;" | 700.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-07-26
 +
| Perforation
 +
| style="text-align: right;" | 467.00
 +
| style="text-align: right;" | 471.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-07-27
 +
| Fracture
 +
| style="text-align: right;" | 467.00
 +
| style="text-align: right;" | 471.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2001
 +
| style="text-align: right;" | 8202
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2002
 +
| style="text-align: right;" | 7283
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2003
 +
| style="text-align: right;" | 2548
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2004
 +
| style="text-align: right;" | 594
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 09:51, 11 July 2020

Well Details

Well ID: 0494100804000
Loading map...
Location: 00/04-08-049-10W4/0
Location Alias: 00/04-08-49-10 W4M
Location Alias 2: 00/04-08-049-10 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 10
Section: 08
County/Municipality: County of Minburn No. 27
Well Name: SPL VIK-KINS 4-8-49-10
Operator Name: Spur Petroleum Ltd.
License Number: 0243977
License Date: 2000-11-03
License Status: Issued
Spud Date: 2000-11-14
Final Drill Date: 2000-11-15
Well Total Depth: 765.00 m
Surface Hole Latitude: 53.207842
Surface Hole Longitude: -111.437624

For data sources see[1][2]

Well History

Date Event
2000-11-03 Obtained License
2000-11-14 Surface Casing Operation Performed
2000-11-15 Finished Drilling
2000-11-16 Production Casing Operation Performed
2000-11-16 Well Log Performed
2000-11-17 Rig Released
2000-11-17 Well Mode changed to Drilled and Cased
2000-11-24 Well Log Performed
2000-11-29 Perforation Treatment Performed - Jet Perforation
2000-11-29 Perforation Treatment Performed - Remedial Casing
2000-11-29 Well Log Performed
2000-12-01 Perforation Treatment Performed - Jet Perforation
2000-12-01 Well Log Performed
2000-12-03 Perforation Treatment Performed - Cement Squeeze
2000-12-04 Well Log Performed
2000-12-05 Perforation Treatment Performed - Jet Perforation
2000-12-05 Well Log Performed
2001-01-24 Well Began Production
2001-01-24 Well Fluid changed to Gas
2001-01-24 Well Mode changed to Flowing
2004-03-01 Well Fluid changed to Gas
2004-03-01 Well Mode changed to Suspended
2006-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-25 Plug Back Performed
2006-07-25 Well Fluid changed to Gas
2006-07-25 Well Log Performed
2006-07-25 Well Mode changed to Abandoned Zone
2006-07-26 Perforation Treatment Performed - Jet Perforation
2006-07-26 Well Log Performed
2006-07-27 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-11-29 Perforation 220.00 221.00 14
2000-11-29 Remedial Casing Cementing 220.00 221.00 0
2000-12-01 Perforation 696.60 698.00 20
2000-12-03 Cement Squeeze 696.60 698.00 0
2000-12-05 Perforation 694.00 695.50 20
2000-12-05 Perforation 718.00 719.00 20
2000-12-05 Perforation 713.50 715.00 20
2000-12-05 Perforation 716.00 717.00 20
2006-07-25 Packing Device Capped w/Cement 682.00 690.00 0
2006-07-25 Packing Device Capped w/Cement 692.00 700.00 0
2006-07-26 Perforation 467.00 471.00 17
2006-07-27 Fracture 467.00 471.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 8202 0.0 0.0 0.0
2002 7283 0.0 0.0 0.0
2003 2548 0.0 0.0 0.0
2004 594 0.0 0.0 0.0

For data sources see[5]

References