X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0395032106000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0395032106000
 
| Well ID: 0395032106000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.368457, -114.376413 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.368457, -114.376413 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/06-21-039-03W5/0
 
| Location: 00/06-21-039-03W5/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/06-21-039-03 W5/00
 
| Location Alias 2: 00/06-21-039-03 W5/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 039
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 03
 +
|-
 +
| Section: 21
 
|-
 
|-
 
| County/Municipality: [[Lacombe County,_Alberta|Lacombe County]]
 
| County/Municipality: [[Lacombe County,_Alberta|Lacombe County]]
Line 17: Line 27:
 
| Well Name: CVE MEDRIV 6-21-39-3
 
| Well Name: CVE MEDRIV 6-21-39-3
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Cenovus Energy Inc.]]
 
|-
 
|-
 
| License Number: 0020528
 
| License Number: 0020528
Line 23: Line 33:
 
| License Date: 1961-03-07
 
| License Date: 1961-03-07
 
|-
 
|-
| License Status: Abandoned
+
| License Status: RecCertified
 
|-
 
|-
 
| Spud Date: 1961-03-27
 
| Spud Date: 1961-03-27
Line 29: Line 39:
 
| Final Drill Date: 1961-04-19
 
| Final Drill Date: 1961-04-19
 
|-
 
|-
| Well Total Depth: 2198.5 m
+
| Well Total Depth: 2198.50 m
 
|-
 
|-
 
| Surface Hole Latitude: 52.368457
 
| Surface Hole Latitude: 52.368457
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1961-03-07
 +
| Obtained License
 +
|-
 +
| 1961-04-14
 +
| Drill Stem Test Performed
 +
|-
 +
| 1961-04-19
 +
| Finished Drilling
 +
|-
 +
| 1961-04-19
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1961-04-21
 +
| Production Casing Operation Performed
 +
|-
 +
| 1961-04-24
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1961-04-24
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1961-05-01
 +
| Well Began Production
 +
|-
 +
| 1961-05-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1961-05-01
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1961-06-14
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1961-06-14
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1961-09-05
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1961-09-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1961-09-09
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1962-02-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1962-02-08
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1963-02-08
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1963-08-11
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1963-08-11
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1963-08-12
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1963-08-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1963-08-14
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1963-08-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1963-08-18
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1963-08-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1963-09-05
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1963-09-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1963-09-09
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1963-09-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1963-10-01
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1963-10-02
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1963-10-02
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1963-10-02
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1963-10-16
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1963-10-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1988-07-21
 +
| Well Log Performed
 +
|-
 +
| 1988-07-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1988-07-28
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1991-08-01
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1991-08-07
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1991-08-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-03-10
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1998-03-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-03-10
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1998-03-10
 +
| Plug Back Performed
 +
|-
 +
| 1998-03-10
 +
| Well Log Performed
 +
|-
 +
| 1998-05-12
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1998-05-20
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 246:
 
| 1961-04-24
 
| 1961-04-24
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2171.1
+
| style="text-align: right;" | 2171.10
| style="text-align: right;" | 2175.1
+
| style="text-align: right;" | 2175.10
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1961-04-24
 
| 1961-04-24
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2171.1
+
| style="text-align: right;" | 2171.10
| style="text-align: right;" | 2175.1
+
| style="text-align: right;" | 2175.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1961-09-05
 
| 1961-09-05
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2171.1
+
| style="text-align: right;" | 2171.10
| style="text-align: right;" | 2175.1
+
| style="text-align: right;" | 2175.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1961-09-08
 
| 1961-09-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2166.2
+
| style="text-align: right;" | 2166.20
| style="text-align: right;" | 2168.3
+
| style="text-align: right;" | 2168.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1961-09-09
 
| 1961-09-09
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2166.2
+
| style="text-align: right;" | 2166.20
| style="text-align: right;" | 2168.3
+
| style="text-align: right;" | 2168.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1962-02-07
 
| 1962-02-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2147
+
| style="text-align: right;" | 2147.00
| style="text-align: right;" | 2148.8
+
| style="text-align: right;" | 2148.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1962-02-08
 
| 1962-02-08
| Acid Wash
+
| Acid Wash
| style="text-align: right;" | 2147
+
| style="text-align: right;" | 2147.00
| style="text-align: right;" | 2148.8
+
| style="text-align: right;" | 2148.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1963-02-08
 
| 1963-02-08
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2147
+
| style="text-align: right;" | 2147.00
| style="text-align: right;" | 2148.8
+
| style="text-align: right;" | 2148.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1963-08-12
 
| 1963-08-12
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2136
+
| style="text-align: right;" | 2136.00
| style="text-align: right;" | 2139.1
+
| style="text-align: right;" | 2139.10
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1963-08-12
 
| 1963-08-12
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2136
+
| style="text-align: right;" | 2136.00
| style="text-align: right;" | 2139.1
+
| style="text-align: right;" | 2139.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1963-08-14
 
| 1963-08-14
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2136
+
| style="text-align: right;" | 2136.00
| style="text-align: right;" | 2139.1
+
| style="text-align: right;" | 2139.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1963-08-17
 
| 1963-08-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2136
+
| style="text-align: right;" | 2136.00
| style="text-align: right;" | 2139.1
+
| style="text-align: right;" | 2139.10
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1963-08-18
 
| 1963-08-18
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2136
+
| style="text-align: right;" | 2136.00
| style="text-align: right;" | 2139.1
+
| style="text-align: right;" | 2139.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1963-08-30
 
| 1963-08-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2145.8
+
| style="text-align: right;" | 2145.80
| style="text-align: right;" | 2149.4
+
| style="text-align: right;" | 2149.40
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1963-09-05
 
| 1963-09-05
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2136
+
| style="text-align: right;" | 2136.00
| style="text-align: right;" | 2139.1
+
| style="text-align: right;" | 2139.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1963-09-08
 
| 1963-09-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2136.6
+
| style="text-align: right;" | 2136.60
| style="text-align: right;" | 2138.5
+
| style="text-align: right;" | 2138.50
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1963-09-09
 
| 1963-09-09
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2136.6
+
| style="text-align: right;" | 2136.60
| style="text-align: right;" | 2138.5
+
| style="text-align: right;" | 2138.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1963-09-22
 
| 1963-09-22
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2146.7
+
| style="text-align: right;" | 2146.70
| style="text-align: right;" | 2149.4
+
| style="text-align: right;" | 2149.40
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1963-10-01
 
| 1963-10-01
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2146.7
+
| style="text-align: right;" | 2146.70
| style="text-align: right;" | 2149.4
+
| style="text-align: right;" | 2149.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1963-10-02
 
| 1963-10-02
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2146.7
+
| style="text-align: right;" | 2146.70
| style="text-align: right;" | 2149.4
+
| style="text-align: right;" | 2149.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1963-10-02
 
| 1963-10-02
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2136.6
+
| style="text-align: right;" | 2136.60
| style="text-align: right;" | 2138.5
+
| style="text-align: right;" | 2138.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1963-10-16
 
| 1963-10-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2137.3
+
| style="text-align: right;" | 2137.30
| style="text-align: right;" | 2139.1
+
| style="text-align: right;" | 2139.10
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1963-10-16
 
| 1963-10-16
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2137.3
+
| style="text-align: right;" | 2137.30
| style="text-align: right;" | 2139.1
+
| style="text-align: right;" | 2139.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1988-07-22
 
| 1988-07-22
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1916
+
| style="text-align: right;" | 1916.00
| style="text-align: right;" | 1917.8
+
| style="text-align: right;" | 1917.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1988-07-28
 
| 1988-07-28
| Fracture  
+
| Fracture
| style="text-align: right;" | 1916
+
| style="text-align: right;" | 1916.00
| style="text-align: right;" | 1917.8
+
| style="text-align: right;" | 1917.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1991-08-01
 
| 1991-08-01
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2137.3
+
| style="text-align: right;" | 2137.30
| style="text-align: right;" | 2139.1
+
| style="text-align: right;" | 2139.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1991-08-01
 
| 1991-08-01
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1916
+
| style="text-align: right;" | 1916.00
| style="text-align: right;" | 1917.8
+
| style="text-align: right;" | 1917.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1991-08-07
 
| 1991-08-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2124.5
+
| style="text-align: right;" | 2124.50
| style="text-align: right;" | 2129.9
+
| style="text-align: right;" | 2129.90
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 1991-08-07
 
| 1991-08-07
| Fracture  
+
| Fracture
| style="text-align: right;" | 2124.5
+
| style="text-align: right;" | 2124.50
| style="text-align: right;" | 2129.9
+
| style="text-align: right;" | 2129.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998-03-10
 
| 1998-03-10
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2107
+
| style="text-align: right;" | 2107.00
| style="text-align: right;" | 2115
+
| style="text-align: right;" | 2115.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998-03-10
 
| 1998-03-10
 
| Perforation
 
| Perforation
| style="text-align: right;" | 395.5
+
| style="text-align: right;" | 395.50
| style="text-align: right;" | 396.5
+
| style="text-align: right;" | 396.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1998-03-10
 
| 1998-03-10
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 395.5
+
| style="text-align: right;" | 395.50
| style="text-align: right;" | 396.5
+
| style="text-align: right;" | 396.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998-05-12
 
| 1998-05-12
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 337
+
| style="text-align: right;" | 337.00
| style="text-align: right;" | 396.5
+
| style="text-align: right;" | 396.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 274: Line 446:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 307: Line 493:
 
| 1961
 
| 1961
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 157.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 276.8
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1962
 
| 1962
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 333.3
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 307.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1963
 
| 1963
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 93.1
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 144.3
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 327: Line 513:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 09:37, 10 July 2020

Well Details

Well ID: 0395032106000
Loading map...
Location: 00/06-21-039-03W5/0
Location Alias: 00/06-21-39-03 W5M
Location Alias 2: 00/06-21-039-03 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 21
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 6-21-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0020528
License Date: 1961-03-07
License Status: RecCertified
Spud Date: 1961-03-27
Final Drill Date: 1961-04-19
Well Total Depth: 2198.50 m
Surface Hole Latitude: 52.368457
Surface Hole Longitude: -114.376413

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-03-07 Obtained License
1961-04-14 Drill Stem Test Performed
1961-04-19 Finished Drilling
1961-04-19 Well Mode changed to Drilled and Cased
1961-04-21 Production Casing Operation Performed
1961-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-04-24 Perforation Treatment Performed - Jet Perforation
1961-05-01 Well Began Production
1961-05-01 Well Fluid changed to Crude Oil
1961-05-01 Well Mode changed to Flowing
1961-06-14 Well Fluid changed to Crude Oil
1961-06-14 Well Mode changed to Pumping
1961-09-05 Perforation Treatment Performed - Cement Squeeze
1961-09-08 Perforation Treatment Performed - Jet Perforation
1961-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-02-07 Perforation Treatment Performed - Jet Perforation
1962-02-08 Perforation Treatment Performed - Acid Wash - No Pressure
1963-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-11 Well Fluid changed to Crude Oil
1963-08-11 Well Mode changed to Suspended
1963-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-12 Perforation Treatment Performed - Jet Perforation
1963-08-14 Perforation Treatment Performed - Cement Squeeze
1963-08-17 Perforation Treatment Performed - Jet Perforation
1963-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-30 Perforation Treatment Performed - Jet Perforation
1963-09-05 Perforation Treatment Performed - Cement Squeeze
1963-09-08 Perforation Treatment Performed - Jet Perforation
1963-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-09-22 Perforation Treatment Performed - Jet Perforation
1963-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-02 Perforation Treatment Performed - Cement Squeeze
1963-10-02 Well Fluid changed to Crude Oil
1963-10-02 Well Mode changed to Abandoned Zone
1963-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-16 Perforation Treatment Performed - Jet Perforation
1988-07-21 Well Log Performed
1988-07-22 Perforation Treatment Performed - Jet Perforation
1988-07-28 Perforation Treatment Performed - Fractured
1991-08-01 Perforation Treatment Performed - Cement Squeeze
1991-08-07 Perforation Treatment Performed - Fractured
1991-08-07 Perforation Treatment Performed - Jet Perforation
1998-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-03-10 Perforation Treatment Performed - Jet Perforation
1998-03-10 Perforation Treatment Performed - Remedial Casing
1998-03-10 Plug Back Performed
1998-03-10 Well Log Performed
1998-05-12 Perforation Treatment Performed - Cement Plug
1998-05-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-04-24 Perforation 2171.10 2175.10 13
1961-04-24 Acid Treatment 2171.10 2175.10 0
1961-09-05 Cement Squeeze 2171.10 2175.10 0
1961-09-08 Perforation 2166.20 2168.30 13
1961-09-09 Acid Treatment 2166.20 2168.30 0
1962-02-07 Perforation 2147.00 2148.80 13
1962-02-08 Acid Wash 2147.00 2148.80 0
1963-02-08 Acid Treatment 2147.00 2148.80 0
1963-08-12 Perforation 2136.00 2139.10 7
1963-08-12 Acid Treatment 2136.00 2139.10 0
1963-08-14 Cement Squeeze 2136.00 2139.10 0
1963-08-17 Perforation 2136.00 2139.10 7
1963-08-18 Acid Treatment 2136.00 2139.10 0
1963-08-30 Perforation 2145.80 2149.40 7
1963-09-05 Cement Squeeze 2136.00 2139.10 0
1963-09-08 Perforation 2136.60 2138.50 7
1963-09-09 Acid Treatment 2136.60 2138.50 0
1963-09-22 Perforation 2146.70 2149.40 7
1963-10-01 Acid Treatment 2146.70 2149.40 0
1963-10-02 Cement Squeeze 2146.70 2149.40 0
1963-10-02 Cement Squeeze 2136.60 2138.50 0
1963-10-16 Perforation 2137.30 2139.10 7
1963-10-16 Acid Treatment 2137.30 2139.10 0
1988-07-22 Perforation 1916.00 1917.80 13
1988-07-28 Fracture 1916.00 1917.80 0
1991-08-01 Cement Squeeze 2137.30 2139.10 0
1991-08-01 Cement Squeeze 1916.00 1917.80 0
1991-08-07 Perforation 2124.50 2129.90 17
1991-08-07 Fracture 2124.50 2129.90 0
1998-03-10 Packing Device Capped w/Cement 2107.00 2115.00 0
1998-03-10 Perforation 395.50 396.50 13
1998-03-10 Remedial Casing Cementing 395.50 396.50 0
1998-05-12 Cement Plug 337.00 396.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0

For data sources see[5]

References