X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0364230313003"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0364230313003
 
| Well ID: 0364230313003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.068888, -113.213192 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.068888, -113.213192 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/13-03-036-23W4/3
 
| Location: 00/13-03-036-23W4/3
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/13-03-036-23 W4/03
 
| Location Alias 2: 00/13-03-036-23 W4/03
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 036
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 23
 +
|-
 +
| Section: 03
 
|-
 
|-
 
| County/Municipality: [[Red Deer County,_Alberta|Red Deer County]]
 
| County/Municipality: [[Red Deer County,_Alberta|Red Deer County]]
Line 29: Line 39:
 
| Final Drill Date: 2010-01-09
 
| Final Drill Date: 2010-01-09
 
|-
 
|-
| Well Total Depth: 847 m
+
| Well Total Depth: 847.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 52.068888
 
| Surface Hole Latitude: 52.068888
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2009-07-30
 +
| Obtained License
 +
|-
 +
| 2009-12-31
 +
| Lost Circulation Occurred
 +
|-
 +
| 2009-12-31
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2010-01-09
 +
| Finished Drilling
 +
|-
 +
| 2010-01-09
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2010-01-10
 +
| Production Casing Operation Performed
 +
|-
 +
| 2010-01-10
 +
| Rig Released
 +
|-
 +
| 2010-01-19
 +
| Well Log Performed
 +
|-
 +
| 2010-02-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-06-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-08-03
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2011-08-10
 +
| Well Began Production
 +
|-
 +
| 2011-08-10
 +
| Well Fluid changed to Coalbed Methane-Coals and Other
 +
|-
 +
| 2011-08-10
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2016-11-12
 +
| Well Fluid changed to Coalbed Methane-Coals and Other
 +
|-
 +
| 2016-11-12
 +
| Well Log Performed
 +
|-
 +
| 2016-11-12
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2018-11-16
 +
| Perforation Treatment Performed - Casing Patch (Over Perfs)
 +
|-
 +
| 2018-11-16
 +
| Well Fluid changed to Coalbed Methane-Coals and Other
 +
|-
 +
| 2018-11-16
 +
| Well Log Performed
 +
|-
 +
| 2018-11-16
 +
| Well Mode changed to Flowing
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 159:
 
| 2010-02-01
 
| 2010-02-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 809.5
+
| style="text-align: right;" | 809.50
| style="text-align: right;" | 812
+
| style="text-align: right;" | 812.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2010-02-01
 
| 2010-02-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 720
+
| style="text-align: right;" | 720.00
| style="text-align: right;" | 722
+
| style="text-align: right;" | 722.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2010-02-01
 
| 2010-02-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 705
+
| style="text-align: right;" | 705.00
| style="text-align: right;" | 706
+
| style="text-align: right;" | 706.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2010-02-01
 
| 2010-02-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 578
+
| style="text-align: right;" | 578.00
| style="text-align: right;" | 579
+
| style="text-align: right;" | 579.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 421.9
+
| style="text-align: right;" | 421.90
| style="text-align: right;" | 422.4
+
| style="text-align: right;" | 422.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 433.7
+
| style="text-align: right;" | 433.70
| style="text-align: right;" | 434.7
+
| style="text-align: right;" | 434.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 443.7
+
| style="text-align: right;" | 443.70
| style="text-align: right;" | 444.7
+
| style="text-align: right;" | 444.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 418
+
| style="text-align: right;" | 418.00
| style="text-align: right;" | 419.5
+
| style="text-align: right;" | 419.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 397.2
+
| style="text-align: right;" | 397.20
| style="text-align: right;" | 398.2
+
| style="text-align: right;" | 398.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 404.5
+
| style="text-align: right;" | 404.50
| style="text-align: right;" | 405.5
+
| style="text-align: right;" | 405.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 412.1
+
| style="text-align: right;" | 412.10
| style="text-align: right;" | 413.1
+
| style="text-align: right;" | 413.10
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 448
+
| style="text-align: right;" | 448.00
| style="text-align: right;" | 450
+
| style="text-align: right;" | 450.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 503.9
+
| style="text-align: right;" | 503.90
| style="text-align: right;" | 506.4
+
| style="text-align: right;" | 506.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 515.1
+
| style="text-align: right;" | 515.10
| style="text-align: right;" | 516.6
+
| style="text-align: right;" | 516.60
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 280
+
| style="text-align: right;" | 280.00
| style="text-align: right;" | 282.5
+
| style="text-align: right;" | 282.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 496
+
| style="text-align: right;" | 496.00
| style="text-align: right;" | 497
+
| style="text-align: right;" | 497.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 456.5
+
| style="text-align: right;" | 456.50
| style="text-align: right;" | 458.5
+
| style="text-align: right;" | 458.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 458.5
+
| style="text-align: right;" | 458.50
| style="text-align: right;" | 460.5
+
| style="text-align: right;" | 460.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 481.5
+
| style="text-align: right;" | 481.50
| style="text-align: right;" | 482.5
+
| style="text-align: right;" | 482.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 530.2
+
| style="text-align: right;" | 530.20
| style="text-align: right;" | 530.7
+
| style="text-align: right;" | 530.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 534.5
+
| style="text-align: right;" | 534.50
| style="text-align: right;" | 535
+
| style="text-align: right;" | 535.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 537.5
+
| style="text-align: right;" | 537.50
| style="text-align: right;" | 538.5
+
| style="text-align: right;" | 538.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 797.9
+
| style="text-align: right;" | 797.90
| style="text-align: right;" | 798.4
+
| style="text-align: right;" | 798.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 800.3
+
| style="text-align: right;" | 800.30
| style="text-align: right;" | 800.8
+
| style="text-align: right;" | 800.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 805.4
+
| style="text-align: right;" | 805.40
| style="text-align: right;" | 806.4
+
| style="text-align: right;" | 806.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 259
+
| style="text-align: right;" | 259.00
| style="text-align: right;" | 259.5
+
| style="text-align: right;" | 259.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 331.8
+
| style="text-align: right;" | 331.80
| style="text-align: right;" | 333.3
+
| style="text-align: right;" | 333.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 342.6
+
| style="text-align: right;" | 342.60
| style="text-align: right;" | 343.6
+
| style="text-align: right;" | 343.60
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 301.8
+
| style="text-align: right;" | 301.80
| style="text-align: right;" | 302.3
+
| style="text-align: right;" | 302.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 299
+
| style="text-align: right;" | 299.00
| style="text-align: right;" | 300
+
| style="text-align: right;" | 300.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 268.9
+
| style="text-align: right;" | 268.90
| style="text-align: right;" | 269.4
+
| style="text-align: right;" | 269.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-06-30
 
| 2011-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 296.5
+
| style="text-align: right;" | 296.50
| style="text-align: right;" | 297
+
| style="text-align: right;" | 297.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-08-03
 
| 2011-08-03
| Fracture  
+
| Fracture
| style="text-align: right;" | 280
+
| style="text-align: right;" | 280.00
| style="text-align: right;" | 282.5
+
| style="text-align: right;" | 282.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-08-03
 
| 2011-08-03
| Fracture  
+
| Fracture
| style="text-align: right;" | 259
+
| style="text-align: right;" | 259.00
| style="text-align: right;" | 516.6
+
| style="text-align: right;" | 516.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-08-03
 
| 2011-08-03
| Fracture  
+
| Fracture
| style="text-align: right;" | 530.2
+
| style="text-align: right;" | 530.20
| style="text-align: right;" | 538.5
+
| style="text-align: right;" | 538.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-08-03
 
| 2011-08-03
| Fracture  
+
| Fracture
| style="text-align: right;" | 797.9
+
| style="text-align: right;" | 797.90
| style="text-align: right;" | 800.8
+
| style="text-align: right;" | 800.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018-11-16
 
| 2018-11-16
| Casing Patch  
+
| Casing Patch
| style="text-align: right;" | 578
+
| style="text-align: right;" | 578.00
| style="text-align: right;" | 579
+
| style="text-align: right;" | 579.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 298: Line 383:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 331: Line 430:
 
| 2011
 
| 2011
 
| style="text-align: right;" | 3421
 
| style="text-align: right;" | 3421
| style="text-align: right;" | 462.1
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 12.6
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2012
 
| 2012
 
| style="text-align: right;" | 8654
 
| style="text-align: right;" | 8654
| style="text-align: right;" | 1075.3
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 20.2
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2013
 
| 2013
 
| style="text-align: right;" | 8706
 
| style="text-align: right;" | 8706
| style="text-align: right;" | 962.1
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 15.8
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2014
 
| 2014
 
| style="text-align: right;" | 8508
 
| style="text-align: right;" | 8508
| style="text-align: right;" | 823.1
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 8.9
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2015
 
| 2015
 
| style="text-align: right;" | 8397
 
| style="text-align: right;" | 8397
| style="text-align: right;" | 825.7
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 17.3
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2016
 
| 2016
 
| style="text-align: right;" | 8341
 
| style="text-align: right;" | 8341
| style="text-align: right;" | 810.6
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 17.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2017
 
| 2017
 
| style="text-align: right;" | 8578
 
| style="text-align: right;" | 8578
| style="text-align: right;" | 866.9
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 14.8
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2018
 
| 2018
 
| style="text-align: right;" | 8188
 
| style="text-align: right;" | 8188
| style="text-align: right;" | 668.9
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 11.9
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2019
 
| 2019
| style="text-align: right;" | 2006
+
| style="text-align: right;" | 8294
| style="text-align: right;" | 103.2
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 1719
 +
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 387: Line 492:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Occurences ==
 
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 403: Line 508:
 
|-
 
|-
 
| 2016-11-12
 
| 2016-11-12
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 +
|-
 +
| 2018-11-16
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 
|-
 
|-
 
|}
 
|}
Line 411: Line 521:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Alberta]][[Category:Wells]]
 
[[Category:Alberta]][[Category:Wells]]

Revision as of 05:44, 8 July 2020

Well Details

Well ID: 0364230313003
Loading map...
Location: 00/13-03-036-23W4/3
Location Alias: 00/13-03-36-23 W4M
Location Alias 2: 00/13-03-036-23 W4/03
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 23
Section: 03
County/Municipality: Red Deer County
Well Name: EMBER MIKWAN 13-3-36-23
Operator Name: Ember Resources Inc.
License Number: 0411671
License Date: 2009-07-30
License Status: Issued
Spud Date: 2009-12-31
Final Drill Date: 2010-01-09
Well Total Depth: 847.00 m
Surface Hole Latitude: 52.068888
Surface Hole Longitude: -113.213192

For data sources see[1][2]

Well History

Date Event
2009-07-30 Obtained License
2009-12-31 Lost Circulation Occurred
2009-12-31 Surface Casing Operation Performed
2010-01-09 Finished Drilling
2010-01-09 Well Mode changed to Drilled and Cased
2010-01-10 Production Casing Operation Performed
2010-01-10 Rig Released
2010-01-19 Well Log Performed
2010-02-01 Perforation Treatment Performed - Jet Perforation
2011-06-30 Perforation Treatment Performed - Jet Perforation
2011-08-03 Perforation Treatment Performed - Fractured
2011-08-10 Well Began Production
2011-08-10 Well Fluid changed to Coalbed Methane-Coals and Other
2011-08-10 Well Mode changed to Flowing
2016-11-12 Well Fluid changed to Coalbed Methane-Coals and Other
2016-11-12 Well Log Performed
2016-11-12 Well Mode changed to Flowing
2018-11-16 Perforation Treatment Performed - Casing Patch (Over Perfs)
2018-11-16 Well Fluid changed to Coalbed Methane-Coals and Other
2018-11-16 Well Log Performed
2018-11-16 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-01 Perforation 809.50 812.00 13
2010-02-01 Perforation 720.00 722.00 13
2010-02-01 Perforation 705.00 706.00 13
2010-02-01 Perforation 578.00 579.00 13
2011-06-30 Perforation 421.90 422.40 13
2011-06-30 Perforation 433.70 434.70 13
2011-06-30 Perforation 443.70 444.70 13
2011-06-30 Perforation 418.00 419.50 13
2011-06-30 Perforation 397.20 398.20 13
2011-06-30 Perforation 404.50 405.50 13
2011-06-30 Perforation 412.10 413.10 13
2011-06-30 Perforation 448.00 450.00 13
2011-06-30 Perforation 503.90 506.40 13
2011-06-30 Perforation 515.10 516.60 13
2011-06-30 Perforation 280.00 282.50 13
2011-06-30 Perforation 496.00 497.00 13
2011-06-30 Perforation 456.50 458.50 13
2011-06-30 Perforation 458.50 460.50 13
2011-06-30 Perforation 481.50 482.50 13
2011-06-30 Perforation 530.20 530.70 13
2011-06-30 Perforation 534.50 535.00 13
2011-06-30 Perforation 537.50 538.50 13
2011-06-30 Perforation 797.90 798.40 13
2011-06-30 Perforation 800.30 800.80 13
2011-06-30 Perforation 805.40 806.40 13
2011-06-30 Perforation 259.00 259.50 13
2011-06-30 Perforation 331.80 333.30 13
2011-06-30 Perforation 342.60 343.60 13
2011-06-30 Perforation 301.80 302.30 13
2011-06-30 Perforation 299.00 300.00 13
2011-06-30 Perforation 268.90 269.40 13
2011-06-30 Perforation 296.50 297.00 13
2011-08-03 Fracture 280.00 282.50 0
2011-08-03 Fracture 259.00 516.60 0
2011-08-03 Fracture 530.20 538.50 0
2011-08-03 Fracture 797.90 800.80 0
2018-11-16 Casing Patch 578.00 579.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 3421 0.0 0.0 0.0
2012 8654 0.0 0.0 0.0
2013 8706 0.0 0.0 0.0
2014 8508 0.0 0.0 0.0
2015 8397 0.0 0.0 0.0
2016 8341 0.0 0.0 0.0
2017 8578 0.0 0.0 0.0
2018 8188 0.0 0.0 0.0
2019 8294 0.0 0.0 0.0
2020 1719 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-12-31 Lost Circulation 16.00 19.00
2016-11-12 No Incident Encountered 0.00 0.00
2018-11-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References