X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-21998"

m
m
Line 1: Line 1:
 
__TOC__
 
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-21998
 
| Well ID: 37-003-21998
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.62219, -79.802111 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.62219, -79.802111 | width=100% | height=100% }}  
 
|-
 
|-
 
| Operator Name: [[HUNTLEY & HUNTLEY INC]]
 
| Operator Name: [[HUNTLEY & HUNTLEY INC]]

Revision as of 15:34, 26 June 2014

Well Details

Well ID: 37-003-21998
Loading map...
Operator Name: HUNTLEY & HUNTLEY INC
First Permit Date: 2008-11-20
Last Permit Date: 2008-11-20
Spud Date: 2008-12-19
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.62219
Longitude: -79.802111

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 3023.94 365.0 0.0 0.0 0.0 0.0
2012-0 5313.0 366.0 0.0 0.0 0.0 0.0
2011-0 12259.0 365.0 0.0 0.0 0.0 0.0
2010-0 15444.0 365.0 0.0 0.0 0.0 0.0
2009-0 15223.0 333.0 0.0 0.0 0.0 0.0
2008-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2008-0 DRILLING 110.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2117458 2012-11-19 No Violations Noted John Ley WQS, SWRO was on site to conduct an inspection. At the time of the inspection, the well label was on site. The well was drilled and equipped for production. The associated well apparatus located onsite appeared to be in sound working condition. There were no erosion or sedimentation issues. The area around the pad meets the 70% uniform vegetative coverage.

References