If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 86: | Line 86: | ||
|- | |- | ||
| 2009 | | 2009 | ||
− | | | + | | [[XTO ENERGY INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 167: | Line 167: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 172: | Line 173: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
+ | | [[XTO ENERGY INC]] | ||
| Drilling Fluid Waste (in Barrels) | | Drilling Fluid Waste (in Barrels) | ||
| style="text-align: right;" | 131.00 Bbl | | style="text-align: right;" | 131.00 Bbl | ||
Line 178: | Line 180: | ||
| PA0095273 | | PA0095273 | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
− | | | + | | [[XTO ENERGY INC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
| Fracing Fluid Waste (in Barrels) | | Fracing Fluid Waste (in Barrels) | ||
| style="text-align: right;" | 5,586.00 Bbl | | style="text-align: right;" | 5,586.00 Bbl | ||
Line 190: | Line 187: | ||
| PA0095273 | | PA0095273 | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
+ | | [[XTO ENERGY INC]] | ||
| Fracing Fluid Waste (in Barrels) | | Fracing Fluid Waste (in Barrels) | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 4,963.00 Bbl |
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR119 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Drilling Fluid Waste (in Barrels) | ||
+ | | style="text-align: right;" | 131.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | WMGR119 |
|- | |- | ||
− | | 2010 | + | | 2010 |
+ | | [[XTO ENERGY INC]] | ||
| Fracing Fluid Waste (in Barrels) | | Fracing Fluid Waste (in Barrels) | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2,593.00 Bbl |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0101508 |
|- | |- | ||
− | | 2011 | + | | 2011 |
+ | | [[XTO ENERGY INC]] | ||
| Fracing Fluid Waste (in Barrels) | | Fracing Fluid Waste (in Barrels) | ||
| style="text-align: right;" | 972.00 Bbl | | style="text-align: right;" | 972.00 Bbl | ||
Line 208: | Line 215: | ||
| PA0101508 | | PA0101508 | ||
|- | |- | ||
− | | 2014 | + | | 2014 |
+ | | [[XTO ENERGY INC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 15.00 Bbl | | style="text-align: right;" | 15.00 Bbl | ||
Line 214: | Line 222: | ||
| WMGR123 | | WMGR123 | ||
|- | |- | ||
− | | 2014 | + | | 2014 |
− | | | + | | [[XTO ENERGY INC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
| Servicing Fluid (in Barrels) | | Servicing Fluid (in Barrels) | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,341.03 Bbl |
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
| WMGR123 | | WMGR123 |
Well ID: 37-081-20224 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.316328,"lon":-76.696581,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Shrewsbury Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 146118 | |
Farm/Lease Name: BOOTH 8500H | |
License Status: Plugged OG Well | |
Spud Date: 2010-04-29 | |
Permit Date: 2009-12-18 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.316328 | |
Longitude: -76.696581 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | XTO ENERGY INC | Drilling Fluid Waste (in Barrels) | 131.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XTO ENERGY INC | Fracing Fluid Waste (in Barrels) | 5,586.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XTO ENERGY INC | Fracing Fluid Waste (in Barrels) | 4,963.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | XTO ENERGY INC | Drilling Fluid Waste (in Barrels) | 131.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | XTO ENERGY INC | Fracing Fluid Waste (in Barrels) | 2,593.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | XTO ENERGY INC | Fracing Fluid Waste (in Barrels) | 972.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2014 | XTO ENERGY INC | Produced Fluid (in Barrels) | 15.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | XTO ENERGY INC | Servicing Fluid (in Barrels) | 1,341.03 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1880801 | Primary Facility | 2010-04-27 | Routine/Complete Inspection | No Violations Noted | |
1888713 | Primary Facility | 2010-06-02 | Routine/Complete Inspection | No Violations Noted | |
1889444 | Primary Facility | 2010-05-27 | Routine/Complete Inspection | Violation(s) Noted | JC-081-20224 insp, drilling mud released to ground, potential for pollution to Pa waters, SWMA 6018-301 & CSL 691.402(a) viols. |
1902273 | Primary Facility | 2010-05-06 | Drilling/Alteration | No Violations Noted | |
1902275 | Primary Facility | 2010-08-02 | Routine/Complete Inspection | No Violations Noted | |
1902290 | Primary Facility | 2010-05-20 | Drilling/Alteration | No Violations Noted | |
1939568 | Primary Facility | 2010-12-29 | Routine/Complete Inspection | Violation(s) Noted | |
1943542 | Primary Facility | 2011-01-12 | Follow-up Inspection | No Violations Noted | |
1943543 | Primary Facility | 2011-01-12 | Follow-up Inspection | No Violations Noted | |
1964220 | Primary Facility | 2011-04-06 | Routine/Partial Inspection | Violation(s) Noted | |
1974208 | Primary Facility | 2011-05-17 | Follow-up Inspection | No Violations Noted | |
2064431 | Primary Facility | 2012-05-01 | Drilling/Alteration | No Violations Noted | |
2074997 | Primary Facility | 2012-06-11 | Routine/Complete Inspection | No Violations Noted | |
2133587 | Primary Facility | 2013-01-09 | Routine/Complete Inspection | No Violations Noted | |
2201622 | Primary Facility | 2013-09-04 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2265163 | Primary Facility | 2014-04-08 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2271988 | Primary Facility | 2014-05-14 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2286945 | Primary Facility | 2014-07-11 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2304988 | Primary Facility | 2014-09-19 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2394761 | Primary Facility | 2015-07-28 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | At the time of inspection sunny sky, ~ 75° F. |
2407774 | Primary Facility | 2015-09-16 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Arrived at 09:30, weather was sunny and warm. Met Company man Mike Hahn and inspected well and site. There was one well spudded on this location. The well was previously -plugged. I checked the vent stack port and casing at ground level with an Altair 5 Gas Meter calibrated on 9/11/15. Ground level reading was 0% methane. Vent reading was 62% methane. Discussed this with Mike Hahn. Left location @ 10:00. |
2411478 | Primary Facility | 2015-09-28 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Arrived at 14:10 , weather was cloudy and damp. There was one well spudded on this location. The well was previously plugged. I checked the vent stack port with an Altair 5 Gas Meter calibrated on 9/27/15. The vent reading was variable from 10 -20% LEL (0.5 to 1.0% methane). For the access road, it is worth noting that there were erosion gullies on the left-hand side of the road on the two hills traversed by the road (traveling to the pad). Left @ 14:45 |
2422942 | Primary Facility | 2015-11-05 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Arrived at 14:20. Temperatures in the 70’s, a beautiful day. There was one well spudded on this location. The well was previously plugged. I checked the vent stack port with an Altair 5X Gas Meter calibrated on 10/29/15. The vent reading was variable from 5% to 11% methane. Access road has been graded. Left @ 14:40 |
2428055 | Primary Facility | 2015-11-24 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Arrived at 13:50. Weather cloudy and cold. There was one well spudded on this location. The well was previously plugged. I checked the vent stack port with an Altair 5X Gas Meter calibrated on 11/24/15. The meter did not detect methane gas. Left @ 14:05 |
2428712 | Primary Facility | 2015-11-30 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Arrived at 15:00. Weather cold with a mix of sun and clouds. There was one well spudded on this location. The well was previously plugged. I checked the vent stack port with an Altair 5X Gas Meter calibrated on 11/24/15. The meter detected 2.0% methane. Left @ 15:15 |
2444460 | Primary Facility | 2016-01-28 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Arrived at 14:10. Weather: cloudy and cool. There was one well spudded on this location. The well was previously plugged. I checked the vent stack port with an Altair 5X Gas Meter calibrated on 01/28/2016. The meter did not detect methane. Left location @ 14:20. |
2475880 | Primary Facility | 2016-04-18 | Routine/Complete Inspection | No Violations Noted | At the time of the inspection, the well (081-20224) was plugged and cut off below plow depth. The site was being reclaimed and returned to approximate original contours. The two basins within the pad area remain installed as E&S controls while earthmoving is being completed. The pre-existing portion of the access road has been narrowed and stabilized along its entire length. Some erosion control blanketing remains installed from the original construction and has not photo-degraded as designed. I recommend removing the erosion control blanketing where it is loose and not fastened to the ground. No Violations Noted. |
2537494 | Primary Facility | 2016-11-14 | Routine/Complete Inspection | No Violations Noted | Well Site Restoration Inspection; 11/14/2016.
At the time of the inspection, the well (081-20224) was plugged and cut off below plow depth. The site was being reclaimed and returned to approximate original contours. I recommend the Well Site Restoration Report and Notice of Termination for this site is approved. No Violations Noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1889444 | 588776 | 05/27/2010 | 2010-05-27 | 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt | Environmental Health & Safety | SWMA 6018.301 drilling mud residual waste discharge to ground. |
1889444 | 588777 | 05/27/2010 | 2010-05-27 | 402POTNLPOLL - There is a potential for polluting substance(s) reaching Waters of the Commonwealth and may require a permit. | Environmental Health & Safety | CSL 691.402(a) drilling mud residual waste discharge to ground created potential to pollution to Pa waters. |
1939568 | 602136 | 12/29/2010 | 2010-12-29 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | Environmental Health & Safety | Oil soaked absorbent on pad |
1964220 | 608348 | 04/06/2011 | 2011-04-06 | CSL401CAUSPL - Polluting substance(s) allowed to discharge into Waters of the Commonwealth | Environmental Health & Safety | Sediment run off from access road into ditch along Highland Lake Road |
1964220 | 611459 | 04/06/2011 | 2011-04-06 | 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt | Environmental Health & Safety | SWMA 6018.301 drilling mud residual waste discharge to ground. |
1964220 | 611460 | 04/06/2011 | 2011-04-06 | 402POTNLPOLL - There is a potential for polluting substance(s) reaching Waters of the Commonwealth and may require a permit. | Environmental Health & Safety | CSL 691.402(a) drilling mud residual waste discharge to ground created potential to pollution to Pa waters. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
588776 | 258780 | NOV - Notice of Violation | Comply/Closed | 2011-05-17 | $0.00 | $0.00 | |
588777 | 258780 | NOV - Notice of Violation | Comply/Closed | 2011-05-17 | $0.00 | $0.00 |
For data sources see[6]