X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-26973"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-26973
 
| Well ID: 37-005-26973
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.537182, -79.461609 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.537182, -79.461609 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 02/21/2003
+
| Spud Date: 2003-02-21
 
|-
 
|-
| Permit Date: 8/15/2002
+
| Permit Date: 2002-08-15
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
Line 74: Line 99:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
Line 83: Line 108:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 92: Line 117:
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 101: Line 126:
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 110: Line 135:
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 119: Line 144:
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 128: Line 153:
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 137: Line 162:
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 146: Line 171:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 155: Line 180:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 164: Line 189:
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 173: Line 198:
 
| style="text-align: right;" | 134
 
| style="text-align: right;" | 134
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 182: Line 207:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 196: Line 221:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 215: Line 241:
 
| 1484632
 
| 1484632
 
| Primary Facility
 
| Primary Facility
| 09/30/2005
+
| 2005-09-30
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 222: Line 248:
 
| 1920326
 
| 1920326
 
| Primary Facility
 
| Primary Facility
| 10/15/2010
+
| 2010-10-15
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 229: Line 255:
 
| 1929545
 
| 1929545
 
| Primary Facility
 
| Primary Facility
| 11/23/2010
+
| 2010-11-23
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 236: Line 262:
 
| 1943615
 
| 1943615
 
| Primary Facility
 
| Primary Facility
| 01/19/2011
+
| 2011-01-19
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 243: Line 269:
 
| 2251487
 
| 2251487
 
| Primary Facility
 
| Primary Facility
| 03/06/2014
+
| 2014-03-06
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 269: Line 295:
 
| 597396
 
| 597396
 
| 10/15/2010
 
| 10/15/2010
| 01/19/2011
+
| 2010-10-15
 
| 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation.
 
| 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation.
 
| Administrative
 
| Administrative
Line 291: Line 317:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 01/19/2011
+
| 2011-01-19
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 299: Line 325:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 04/13/2011
+
| 2011-04-13
| 04/13/2011
+
| 2011-04-13
 
| style="text-align: right;" | $2,925.00
 
| style="text-align: right;" | $2,925.00
 
| style="text-align: right;" | $2,925.00
 
| style="text-align: right;" | $2,925.00
Line 311: Line 337:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 23:37, 19 August 2019

Well Details

Well ID: 37-005-26973
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Kiskiminetas Township
Operator Name: US ENERGY EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: ANDREE 3
License Status: Active
Spud Date: 2003-02-21
Permit Date: 2002-08-15
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.537182
Longitude: -79.461609

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2003 US ENERGY EXPLORATION CORP 3,613.00 180 0.00 0 0.00 0
2004 US ENERGY EXPLORATION CORP 8,771.00 365 0.00 0 0.00 0
2005 US ENERGY EXPLORATION CORP 5,928.00 365 0.00 0 0.00 0
2008 US ENERGY EXPLORATION CORP 2,586.00 360 0.00 0 0.00 0
2009 US ENERGY EXPLORATION CORP 2,692.00 360 0.00 0 0.00 0
2010 US ENERGY EXPLORATION CORP 2,509.00 330 0.00 0 0.00 0
2011 US ENERGY EXPLORATION CORP 1,742.00 360 0.00 0 0.00 0
2012 US ENERGY EXPLORATION CORP 1,878.00 360 0.00 0 0.00 0
2013 US ENERGY EXPLORATION CORP 1,407.00 360 0.00 0 0.00 0
2014 US ENERGY EXPLORATION CORP 1,978.00 365 0.00 0 0.00 0
2015 US ENERGY EXPLORATION CORP 1,716.00 365 0.00 0 0.00 0
2016 US ENERGY EXPLORATION CORP 1,330.00 330 0.00 0 0.00 0
2017 US ENERGY EXPLORATION CORP 473.00 134 0.00 0 0.00 0
2018 US ENERGY EXPLORATION CORP 1,146.00 365 0.00 0 0.00 0

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1484632 Primary Facility 2005-09-30 Routine/Complete Inspection No Violations Noted equipped/E&S ok/tank&tag ok
1920326 Primary Facility 2010-10-15 Routine/Complete Inspection Violation(s) Noted Drilling was completed on 02/28/03. Well appeared to be equipped for & in production at the time of the inspection. Brine tank located onsite and appeared to be in sound condition. No accelerated erosion & sedimentation was observed in relation to the well-site. The vegetative cover met the 70% uniform coverage criteria. Noted accelerated erosion & sedimentation with respect to the access road. Specifically sediment was being carried off the access road and deposited onto State Route 156.
1929545 Primary Facility 2010-11-23 Compliance Evaluation Outstanding Violations - No Viols Req'd Received requested follow-up documentation from the operator on 11/18/10. Noted that the operator had re-established the water bars to convey runoff to the roadside ditch. The Department recommends that the operator additionally implement clean durable rock at the base of the access road to minimize the amount of sediment that can be generated and transported via runoff to Route 156 and the roadside ditch.
1943615 Primary Facility 2011-01-19 Compliance Evaluation No Violations Noted Noted that the operator had re-established the water bars to convey runoff to the roadside ditch. The operator had additionally added clean durable rock to the access road intersection with Route 156. The operator should continue to monitor the access road erosion controls to insure their continued functionality.
2251487 Primary Facility 2014-03-06 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production at the time of the inspection. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road.
2766017 Primary Facility 2018-08-22 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is shut. The well head casing, piping, equipment and 50 bbl fluid collection tank look ok.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1920326 597396 10/15/2010 2010-10-15 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
597396 263285 NOV - Notice of Violation Comply/Closed 2011-01-19
597396 269599 CACP - Consent Assessment of Civil Penalty Comply/Closed 2011-04-13 2011-04-13 $2,925.00 $2,925.00

For data sources see[5]

References