| Well ID: 37-003-22169
 
| Well ID: 37-003-22169
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.535905, -80.115725 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.535906, -80.115725 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Allegheny County, Pennsylvania|Allegheny]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Ohio Township, Allegheny County, Pennsylvania|Ohio Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Allegheny_County,_Pennsylvania|Allegheny]]
 +
|-
 +
| Municipality: [[Ohio Township,_Allegheny_County,_Pennsylvania|Ohio Township]]
 
|-
 
|-
 
| Operator Name: [[AMER NATURAL RESOURCES LLC]]
 
| Operator Name: [[AMER NATURAL RESOURCES LLC]]
Line 15: Line 19:
 
| Farm/Lease Name: CHARLES LENZNER UNIT 3
 
| Farm/Lease Name: CHARLES LENZNER UNIT 3
 
|-
 
|-
| First Permit Date: 2011-03-14
+
| License Status: Plugged OG Well
 
|-
 
|-
| Last Permit Date: 2011-03-14
+
| Spud Date: 04/22/2011
 
|-
 
|-
| Spud Date: 2011-04-22
+
| Permit Date: 3/14/2011
 
|-
 
|-
| Unconventional: No
+
| Unconventional Well: N
 
|-
 
|-
| Configuration: Vertical
+
| Configuration: Vertical Well
 
|-
 
|-
| Well Status: ACTIVE
+
| Latitude: 40.535906
|-
 
| Violations: 0
 
|-
 
| Latitude: 40.535905
 
 
|-
 
|-
 
| Longitude: -80.115725
 
| Longitude: -80.115725
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2011-0
+
| 2011
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2012
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2012-0
+
| 2013
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2014
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2013-0
+
|}
| style="text-align:right;" | 0.0
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 0.0
+
| title =Oil and Gas Production Reports
| style="text-align:right;" | 0.0
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| style="text-align:right;" | 0.0
+
| date = 2019-03-31
| style="text-align:right;" | 0.0
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
| style="text-align:right;" | 0.0
+
| accessdate = 2019-05-21 }}</ref>
|-
+
== Waste Data ==
|-
+
{| class="wikitable sortable" width="95%"
| 2014-0
+
!scope="col" | Period
| style="text-align:right;" | 0.0
+
!scope="col" | Waste Type
| style="text-align:right;" | 0.0
+
!scope="col" | Quantity
| style="text-align:right;" | 0.0
+
!scope="col" | Disposal Method
| style="text-align:right;" | 0.0
+
!scope="col" | Waste Facility ID
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2013-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2011-0
 
| 2011-0
| style="text-align:right;" | 0.0
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 80.00 Bbl
| style="text-align:right;" | 0.0
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| style="text-align:right;" | 0.0
+
| PA0095273
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2012-0
 
| 2012-0
| style="text-align:right;" | 0.0
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 110.00 Bbl
| style="text-align:right;" | 0.0
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| style="text-align:right;" | 0.0
+
| PA0095273
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2014-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION COMMENT
 
 
|-
 
|-
 
| 1974603
 
| 1974603
| 2011-04-27
+
| Primary Facility
 +
| 04/27/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| 6 BBL ON 95/8" CEMENT.  
+
| 6 BBL ON 95/8" CEMENT.
SITE PIT, E&S, AND ACCESS, OK.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1976504
 
| 1976504
| 2011-04-25
+
| Primary Facility
 +
| 04/25/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLING JUST STARTING. NO CASING IN THE GROUND.
 
| DRILLING JUST STARTING. NO CASING IN THE GROUND.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1983162
 
| 1983162
| 2011-05-12
+
| Primary Facility
 +
| 05/12/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLING COMPLETE. EQUIPTMENT GONE.
 
| DRILLING COMPLETE. EQUIPTMENT GONE.
SITE, PIT, E&S, AND ACCESS, OK.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1983734
 
| 1983734
| 2011-04-20
+
| Primary Facility
 +
| 04/20/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On April 20th, 2011 I conducted a routine inspection of the above site.  Drilling has not yet started.  A site ID sign and E&S plan were posted at the site.  The access road could use some additional rock.  Access was through Unit #2 and #4.  All E&S controls were in place and constructed according to the plan at site.  Pit was constructed.  No accelerated erosion was observed at the time of inspection.  The slopes were mulched.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
 
| On April 20th, 2011 I conducted a routine inspection of the above site.  Drilling has not yet started.  A site ID sign and E&S plan were posted at the site.  The access road could use some additional rock.  Access was through Unit #2 and #4.  All E&S controls were in place and constructed according to the plan at site.  Pit was constructed.  No accelerated erosion was observed at the time of inspection.  The slopes were mulched.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1983831
 
| 1983831
| 2011-05-12
+
| Primary Facility
 +
| 05/12/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On May 12th, 2011 I conducted a routine inspection of the above site.  Drilling was completed.  A site ID sign and E&S plan were posted at the site.  The access road was in fair condition.  Access was through Unit #2 and #4.  Pit was appeared to be in good condition and still contained fluids.  No accelerated erosion was observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
 
| On May 12th, 2011 I conducted a routine inspection of the above site.  Drilling was completed.  A site ID sign and E&S plan were posted at the site.  The access road was in fair condition.  Access was through Unit #2 and #4.  Pit was appeared to be in good condition and still contained fluids.  No accelerated erosion was observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2018480
 
| 2018480
| 2011-10-05
+
| Primary Facility
 +
| 10/05/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| THE PIT IS OPEN. WELL WAS NEVER COMPLETED. NO ACTIVITY SINCE MAY 2011.
 
| THE PIT IS OPEN. WELL WAS NEVER COMPLETED. NO ACTIVITY SINCE MAY 2011.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2051751
 
| 2051751
| 2012-03-20
+
| Primary Facility
 +
| 03/20/2012
 +
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
| On December 5, 2012, the Department received a request for a six-month extension for the reclamation of American Natural Resourcesï¾’ (ANR) Charles Lenzer Unit #3.  The well reached total depth on4/29/11 and restoration should have been done by1/29/12.
+
| On December 5, 2012, the Department received a request for a six-month extension for the reclamation of American Natural Resources’ (ANR) Charles Lenzer Unit #3.  The well reached total depth on4/29/11 and restoration should have been done by1/29/12.
 
 
However, ANR was unable to complete the restoration on time because of the extremely wet summer and fall (they included documentation).  I granted the extension and the new restoration date will be 7/29/12.
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2065243
 
| 2065243
| 2012-04-03
+
| Primary Facility
 +
| 04/03/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| JACK IS HOOKED UP. SITE IS RESTORED.
 
| JACK IS HOOKED UP. SITE IS RESTORED.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2086085
 
| 2086085
| 2012-07-24
+
| Primary Facility
 +
| 07/24/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| On March 15, 2012, the Department granted American Natural Resources (ANR) a six-month extension on the reclamation of their Charles Lenzner #3 site.  The new reclamation date is July 29, 2012.  
+
| On March 15, 2012, the Department granted American Natural Resources (ANR) a six-month extension on the reclamation of their Charles Lenzner #3 site.  The new reclamation date is July 29, 2012.
 
 
On July 24, 2012, WQS John Ley and I stopped at ANRï¾’sï¾’, Charles Lenzner #3 site to check the restoration progress.  The site is in fair shape.  Overall the it is vegetated but the silt fence is still up.  We also did not see signs on the well itself.
 
 
 
Iï¾’m recording no violations at this time, but the site could use tending.
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2100553
 
| 2100553
| 2012-09-06
+
| Primary Facility
 +
| 09/06/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| On September 6, 2012, WQS John Ley and I stopped at ANRï¾’sï¾’, Charles Lenzner #3 site to check the restoration progress.  The site is in fair shape.  Overall the it is vegetated but the silt fence is still up.  We also did not see signs on the well itself.
+
| On September 6, 2012, WQS John Ley and I stopped at ANR’s’, Charles Lenzner #3 site to check the restoration progress.  The site is in fair shape.  Overall the it is vegetated but the silt fence is still up.  We also did not see signs on the well itself.
 
 
The site can't be considered restored until the fence is removed and the area is 70% re-vegetated.
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2247383
 
| 2247383
| 2014-01-22
+
| Primary Facility
 +
| 01/22/2014
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| WELL WAS DRILLED BUT NOT PRODUCED.
 
| WELL WAS DRILLED BUT NOT PRODUCED.
|
 
|
 
|
 
 
|-
 
|-
 +
| 2296851
 +
| Primary Facility
 +
| 08/04/2014
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| THIS OIL AND GAS WELL WAS NOT PRODUCTIVE. THE JACK HAS BEEN REMOVED. THE RODS AND TUBING ARE STILL IN THE WELL. THE WELL WILL BE PLUGGED.
 +
|-
 +
| 2303927
 +
| Primary Facility
 +
| 08/25/2014
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| RIG IS SETTING UP TO PULL RODS AND TUBING. TUBING WILL BE RUN BACK IN TO SET PLUGS.
 +
|-
 +
| 2303928
 +
| Primary Facility
 +
| 08/28/2014
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| APPALACHIAN WELL SERVICES IS SETTING UP TO CEMENT THE FINAL PLUG IN THIS WELL.
 +
|-
 +
| 2303930
 +
| Primary Facility
 +
| 09/02/2014
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| THIS WELL IS PLUGGED. THE MARKER IS NOT YET WELDED TO THE CASING.
 
|-
 
|-
 
| 2307463
 
| 2307463
| 2014-09-15
+
| Primary Facility
 +
| 09/15/2014
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
 
| A PERMENENT MARKER HAS BEEN WELDED TO THIS PLUGGED WELL.
 
| A PERMENENT MARKER HAS BEEN WELDED TO THIS PLUGGED WELL.
|  
+
|-
|  
+
| 2728004
|  
+
| Primary Facility
 +
| 2018-05-04
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well plugged monument installed
 
|-
 
|-
 
|}
 
|}
For data sources see<ref>{{cite web
+
<!--==== Violations Commited ====
| title = Oil and Gas Historical Inspection Report
 
| publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2015-05-26
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Inspection ID
!scope="col" | TYPE
+
!scope="col" | Violation ID
!scope="col" | QUANTITY
+
!scope="col" | Violation Date
!scope="col" | UNITS
+
!scope="col" | Date Resolved
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Violation Code
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Violation Type
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Violation Comments
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-0
+
|}-->
| Drilling Fluid Waste (in Barrels)
+
<!--==== Penalties Applied ====
| style="text-align:right;" | 110.0
+
{| class="wikitable sortable" width="95%"
| Bbl
+
!scope="col" | Violation ID
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
!scope="col" | Penalty ID
| PA0095273
+
!scope="col" | Penalty Code
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
+
!scope="col" | Penalty Status
| JOSEPHINE
+
!scope="col" | Penalty Date
| PA
+
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| 2011-0
+
|}-->
| Drilling Fluid Waste (in Barrels)
+
<!--==== Fluid Composition Data ====
| style="text-align:right;" | 80.0
+
{| class="wikitable sortable" width="95%"
| Bbl
+
!scope="col" | Job Number
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
!scope="col" | Trade Name
| PA0095273
+
!scope="col" | Supplier
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
+
!scope="col" | Purpose
| JOSEPHINE
+
!scope="col" | Ingredient Name
| PA
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
|}
+
|}-->
For data sources see<ref>{{cite web
+
 
| title = Oil and Gas Historical Waste Report
+
==References==
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
<references/>
| date = 2015-05-26
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 
| accessdate = 2015-05-26 }}</ref>
 
== References ==
 
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Revision as of 18:54, 12 July 2019

Well Details

Well ID: 37-003-22169
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Ohio Township
Operator Name: AMER NATURAL RESOURCES LLC
Well Pad ID:
Farm/Lease Name: CHARLES LENZNER UNIT 3
License Status: Plugged OG Well
Spud Date: 04/22/2011
Permit Date: 3/14/2011
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.535906
Longitude: -80.115725

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 0.00 0.00 0.00
2012 0.00 0.00 0.00
2013 0.00 0.00 0.00
2014 0.00 0.00 0.00

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-0 Drilling Fluid Waste (in Barrels) 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012-0 Drilling Fluid Waste (in Barrels) 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1974603 Primary Facility 04/27/2011 Drilling/Alteration No Violations Noted 6 BBL ON 95/8" CEMENT.
1976504 Primary Facility 04/25/2011 Drilling/Alteration No Violations Noted DRILLING JUST STARTING. NO CASING IN THE GROUND.
1983162 Primary Facility 05/12/2011 Drilling/Alteration No Violations Noted DRILLING COMPLETE. EQUIPTMENT GONE.
1983734 Primary Facility 04/20/2011 Routine/Complete Inspection No Violations Noted On April 20th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. A site ID sign and E&S plan were posted at the site. The access road could use some additional rock. Access was through Unit #2 and #4. All E&S controls were in place and constructed according to the plan at site. Pit was constructed. No accelerated erosion was observed at the time of inspection. The slopes were mulched. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
1983831 Primary Facility 05/12/2011 Routine/Complete Inspection No Violations Noted On May 12th, 2011 I conducted a routine inspection of the above site. Drilling was completed. A site ID sign and E&S plan were posted at the site. The access road was in fair condition. Access was through Unit #2 and #4. Pit was appeared to be in good condition and still contained fluids. No accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
2018480 Primary Facility 10/05/2011 Drilling/Alteration No Violations Noted THE PIT IS OPEN. WELL WAS NEVER COMPLETED. NO ACTIVITY SINCE MAY 2011.
2051751 Primary Facility 03/20/2012 Administrative/File Review No Violations Noted On December 5, 2012, the Department received a request for a six-month extension for the reclamation of American Natural Resources’ (ANR) Charles Lenzer Unit #3. The well reached total depth on4/29/11 and restoration should have been done by1/29/12.
2065243 Primary Facility 04/03/2012 Routine/Complete Inspection No Violations Noted JACK IS HOOKED UP. SITE IS RESTORED.
2086085 Primary Facility 07/24/2012 Routine/Complete Inspection No Violations Noted On March 15, 2012, the Department granted American Natural Resources (ANR) a six-month extension on the reclamation of their Charles Lenzner #3 site. The new reclamation date is July 29, 2012.
2100553 Primary Facility 09/06/2012 Routine/Complete Inspection No Violations Noted On September 6, 2012, WQS John Ley and I stopped at ANR’s’, Charles Lenzner #3 site to check the restoration progress. The site is in fair shape. Overall the it is vegetated but the silt fence is still up. We also did not see signs on the well itself.
2247383 Primary Facility 01/22/2014 Routine/Complete Inspection No Violations Noted WELL WAS DRILLED BUT NOT PRODUCED.
2296851 Primary Facility 08/04/2014 Plugging(Includes Plugged/Mined Through) No Violations Noted THIS OIL AND GAS WELL WAS NOT PRODUCTIVE. THE JACK HAS BEEN REMOVED. THE RODS AND TUBING ARE STILL IN THE WELL. THE WELL WILL BE PLUGGED.
2303927 Primary Facility 08/25/2014 Plugging(Includes Plugged/Mined Through) No Violations Noted RIG IS SETTING UP TO PULL RODS AND TUBING. TUBING WILL BE RUN BACK IN TO SET PLUGS.
2303928 Primary Facility 08/28/2014 Plugging(Includes Plugged/Mined Through) No Violations Noted APPALACHIAN WELL SERVICES IS SETTING UP TO CEMENT THE FINAL PLUG IN THIS WELL.
2303930 Primary Facility 09/02/2014 Plugging(Includes Plugged/Mined Through) No Violations Noted THIS WELL IS PLUGGED. THE MARKER IS NOT YET WELDED TO THE CASING.
2307463 Primary Facility 09/15/2014 Plugging(Includes Plugged/Mined Through) No Violations Noted A PERMENENT MARKER HAS BEEN WELDED TO THIS PLUGGED WELL.
2728004 Primary Facility 2018-05-04 Routine/Complete Inspection No Violations Noted Well plugged monument installed

For data sources see[6]

References