X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0826021104002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0826021104002
 
| Well ID: 0826021104002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 56.08966100000003507, -118.20493499999997766 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 56.089661, -118.204935 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/04-11-082-02W6/2
 
| Location: 00/04-11-082-02W6/2
 
|-
 
|-
| Well Name: ADAMANT WHLAW 4-11-82-2
+
| Location Alias: 00/04-11-82-02 W6M
 +
|-
 +
| Location Alias 2: 00/04-11-082-02 W6/02
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Municipal District of Fairview No. 136,_Alberta|Municipal District of Fairview No. 136]]
 +
|-
 +
| Well Name: LONG RUN WHITELAW 4-11-82-2
 +
|-
 +
| Operator Name: [[Rising Star Resources Ltd.]]
 +
|-
 +
| License Number: 0172535
 
|-
 
|-
 
| License Date: 1994-11-15
 
| License Date: 1994-11-15
 
|-
 
|-
| Final Drilling Date: 1994-11-24
+
| License Status: Suspension
 +
|-
 +
| Spud Date: 1994-11-20
 +
|-
 +
| Final Drill Date: 1994-11-24
 +
|-
 +
| Well Total Depth: 1193 m
 +
|-
 +
| Surface Hole Latitude: 56.089661
 +
|-
 +
| Surface Hole Longitude: -118.204935
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1994-12-02
 +
| Perforation
 +
| style="text-align: right;" | 1165
 +
| style="text-align: right;" | 1166
 +
| style="text-align: right;" | 14
 +
|-
 +
| 1994-12-04
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 1165
 +
| style="text-align: right;" | 1166
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1994-12-06
 +
| Perforation
 +
| style="text-align: right;" | 923
 +
| style="text-align: right;" | 924
 +
| style="text-align: right;" | 14
 +
|-
 +
| 1994-12-07
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 923
 +
| style="text-align: right;" | 924
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995-01-16
 +
| Perforation
 +
| style="text-align: right;" | 1009
 +
| style="text-align: right;" | 1010
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1995-01-16
 +
| Perforation
 +
| style="text-align: right;" | 1111
 +
| style="text-align: right;" | 1112
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1995-01-16
 +
| Perforation
 +
| style="text-align: right;" | 1113
 +
| style="text-align: right;" | 1114
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Total Depth: 1193.0m
+
| 1995-01-16
 +
| Perforation
 +
| style="text-align: right;" | 1115
 +
| style="text-align: right;" | 1116
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Fluid Type: Gas
+
| 1995-01-18
 +
| Acid Treatment
 +
| style="text-align: right;" | 1009
 +
| style="text-align: right;" | 1116
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Status: Suspended
+
| 1995-01-19
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 994
 +
| style="text-align: right;" | 1002
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 1995-01-20
 +
| Perforation
 +
| style="text-align: right;" | 901
 +
| style="text-align: right;" | 902
 +
| style="text-align: right;" | 14
 
|-
 
|-
| Configuration: Vertical
+
| 1995-01-24
 +
| Perforation
 +
| style="text-align: right;" | 902
 +
| style="text-align: right;" | 904
 +
| style="text-align: right;" | 14
 
|-
 
|-
| Latitude: 56.08966100000003507
+
| 1995-01-25
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 890
 +
| style="text-align: right;" | 898
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -118.20493499999997766
+
| 1995-01-25
 +
| Perforation
 +
| style="text-align: right;" | 861
 +
| style="text-align: right;" | 862
 +
| style="text-align: right;" | 14
 
|-
 
|-
 +
| 2003-01-07
 +
| Perforation
 +
| style="text-align: right;" | 883
 +
| style="text-align: right;" | 885
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2015-02-22
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 861.5
 +
| style="text-align: right;" | 872.5
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-02-24
 +
| Cement Plug
 +
| style="text-align: right;" | 595.7
 +
| style="text-align: right;" | 600
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-02-24
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 843.8
 +
| style="text-align: right;" | 854.8
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-02-25
 +
| Cement Plug
 +
| style="text-align: right;" | 492.6
 +
| style="text-align: right;" | 594
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2003
 +
| style="text-align: right;" | 1054
 +
| style="text-align: right;" | 171.8
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 26.8
 +
|-
 +
| 2004
 +
| style="text-align: right;" | 24
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.2
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-04-24
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 1994-11-24
 +
| Lost Circulation
 +
| style="text-align: right;" | 1193.00
 +
| style="text-align: right;" | 1193.00
 +
|-
 +
| 2015-02-24
 +
| No Incident
 +
| style="text-align: right;" | N/A
 +
| style="text-align: right;" | N/A
 +
|-
 +
| 2015-02-26
 +
| No Incident
 +
| style="text-align: right;" | N/A
 +
| style="text-align: right;" | N/A
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-05-09
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 03:15, 10 June 2019

Well Details

Well ID: 0826021104002
Loading map...
Location: 00/04-11-082-02W6/2
Location Alias: 00/04-11-82-02 W6M
Location Alias 2: 00/04-11-082-02 W6/02
Province: Alberta
County/Municipality: Municipal District of Fairview No. 136
Well Name: LONG RUN WHITELAW 4-11-82-2
Operator Name: Rising Star Resources Ltd.
License Number: 0172535
License Date: 1994-11-15
License Status: Suspension
Spud Date: 1994-11-20
Final Drill Date: 1994-11-24
Well Total Depth: 1193 m
Surface Hole Latitude: 56.089661
Surface Hole Longitude: -118.204935

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-12-02 Perforation 1165 1166 14
1994-12-04 Remedial Casing Cementing 1165 1166 0
1994-12-06 Perforation 923 924 14
1994-12-07 Remedial Casing Cementing 923 924 0
1995-01-16 Perforation 1009 1010 13
1995-01-16 Perforation 1111 1112 13
1995-01-16 Perforation 1113 1114 13
1995-01-16 Perforation 1115 1116 13
1995-01-18 Acid Treatment 1009 1116 0
1995-01-19 Packing Device Capped w/Cement 994 1002 0
1995-01-20 Perforation 901 902 14
1995-01-24 Perforation 902 904 14
1995-01-25 Packing Device Capped w/Cement 890 898 0
1995-01-25 Perforation 861 862 14
2003-01-07 Perforation 883 885 17
2015-02-22 Packing Device Capped w/Cement 861.5 872.5 0
2015-02-24 Cement Plug 595.7 600 0
2015-02-24 Packing Device Capped w/Cement 843.8 854.8 0
2015-02-25 Cement Plug 492.6 594 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1054 171.8 0.0 26.8
2004 24 0.0 0.0 0.2

For data sources see[4]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-11-24 Lost Circulation 1193.00 1193.00
2015-02-24 No Incident N/A N/A
2015-02-26 No Incident N/A N/A

For data sources see[5]

References