X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-133-24347"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-133-24347
 
| Well ID: 34-133-24347
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.1809707216, -81.309364686 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.18095371, -81.30974196 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Portage County, Ohio|Portage]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[GONZOIL INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2007-08-17
 
| Spud Date: 2007-08-17
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 41.1809707216
+
| Latitude: 41.18095371
 
|-
 
|-
| Longitude: -81.309364686
+
| Longitude: -81.30974196
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2008-0
 +
| style="text-align:right;" | 3763.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 729.0
 +
|
 +
|-
 +
|-
 +
| 2009-0
 +
| style="text-align:right;" | 6167.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 612.0
 +
|
 +
|-
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 3854.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 386.0
 +
|
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 2871.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 252.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 2555.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 237.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 1705.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 197.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 112:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1188434641
 +
| 2007-08-20
 +
|
 +
| Wildcat is drilling ahead. The pits are lined and in good condition. No violations at this time.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -1443994126
 
| -1443994126
 
| 2007-08-30
 
| 2007-08-30
|
+
|  
 
| The drilling pits were solidified and closed on 8/29. No violations at this time.
 
| The drilling pits were solidified and closed on 8/29. No violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1865357987
 +
| 2008-05-09
 +
|
 +
| The site needs to be finish graded and seeded before preliminary restoration is approved.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -2084964313
 
| -2084964313
 
| 2007-08-23
 
| 2007-08-23
|
+
|  
 
| Wildcat should finish drilling later today. The pits are lined and in good condition. No violations at this time.
 
| Wildcat should finish drilling later today. The pits are lined and in good condition. No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -299363327
 
| -299363327
 
| 2007-08-09
 
| 2007-08-09
|
+
|  
 
| The drilling location has been cut, cleared and graded. The drilling rig should arrive next week.
 
| The drilling location has been cut, cleared and graded. The drilling rig should arrive next week.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -736734246
 
| -736734246
 
| 2007-08-27
 
| 2007-08-27
|
+
|  
 
| On site to witness grouting the top of the hole with 9 sack grout. GonzOil did not have cement returns while cementing the surface casing. The top of the surface cement was estimated by GonzOil to be between 50 and 60 feet. The annulus space between the 8-5/8 casing and the borehole required 7 cubic yards of grout to fill. Also filled the rathole and the mousehole.
 
| On site to witness grouting the top of the hole with 9 sack grout. GonzOil did not have cement returns while cementing the surface casing. The top of the surface cement was estimated by GonzOil to be between 50 and 60 feet. The annulus space between the 8-5/8 casing and the borehole required 7 cubic yards of grout to fill. Also filled the rathole and the mousehole.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 889456478
 +
| 2008-07-29
 +
|
 +
| Preliminary restoration is approved.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -910043756
 
| -910043756
 
| 2007-08-17
 
| 2007-08-17
|
+
|  
 
| Wildcat Drilling is moving on site and should spud later today. The pits will be dug as soon as the rig is in.
 
| Wildcat Drilling is moving on site and should spud later today. The pits will be dug as soon as the rig is in.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 1188434641
 
| 2007-08-20
 
|
 
| Wildcat is drilling ahead. The pits are lined and in good condition. No violations at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| 1865357987
 
| 2008-05-09
 
|
 
| The site needs to be finish graded and seeded before preliminary restoration is approved.
 
|
 
|
 
|
 
|-
 
|-
 
| 889456478
 
| 2008-07-29
 
|
 
| Preliminary restoration is approved.
 
|
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 20:38, 14 July 2015

Well Details

Well ID: 34-133-24347
Loading map...
County: Portage
Municipality:
Operator Name: GONZOIL INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2007-08-17
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 41.18095371
Longitude: -81.30974196

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2008-0 3763.0 729.0
2009-0 6167.0 612.0
2010-0 3854.0 386.0
2011-0 2871.0 252.0
2012-0 2555.0 237.0
2014-0 1705.0 365.0 197.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1188434641 2007-08-20 Wildcat is drilling ahead. The pits are lined and in good condition. No violations at this time.
-1443994126 2007-08-30 The drilling pits were solidified and closed on 8/29. No violations at this time.
1865357987 2008-05-09 The site needs to be finish graded and seeded before preliminary restoration is approved.
-2084964313 2007-08-23 Wildcat should finish drilling later today. The pits are lined and in good condition. No violations at this time.
-299363327 2007-08-09 The drilling location has been cut, cleared and graded. The drilling rig should arrive next week.
-736734246 2007-08-27 On site to witness grouting the top of the hole with 9 sack grout. GonzOil did not have cement returns while cementing the surface casing. The top of the surface cement was estimated by GonzOil to be between 50 and 60 feet. The annulus space between the 8-5/8 casing and the borehole required 7 cubic yards of grout to fill. Also filled the rathole and the mousehole.
889456478 2008-07-29 Preliminary restoration is approved.
-910043756 2007-08-17 Wildcat Drilling is moving on site and should spud later today. The pits will be dug as soon as the rig is in.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.