X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-27175"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-27175
 
| Well ID: 37-125-27175
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.27768, -80.027391 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.27768, -80.027391 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Washington County, Pennsylvania|Washington]]
 +
|-
 +
| Municipality: [[Union Township, Washington County, Pennsylvania|Union Township]]
 
|-
 
|-
 
| Operator Name: [[EQT PRODUCTION CO]]
 
| Operator Name: [[EQT PRODUCTION CO]]
 
|-
 
|-
| Well Pad ID: [[145422]]
+
| Well Pad ID: [[145422|145422]]
 +
|-
 +
| Farm/Lease Name: TRAX FARMS 592310
 
|-
 
|-
 
| First Permit Date: 2013-11-12
 
| First Permit Date: 2013-11-12
Line 17: Line 23:
 
| Unconventional: Yes
 
| Unconventional: Yes
 
|-
 
|-
| Horizontal: No
+
| Horizontal: Yes
 
|-
 
|-
| Violations: None
+
| Well Status: ACTIVE
 +
|-
 +
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.27768
 
| Latitude: 40.27768
Line 37: Line 45:
 
|-
 
|-
 
| 2013-2
 
| 2013-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-02
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-01
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-03
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 45: Line 98:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 56: Line 115:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
 +
|-
 +
| 2014-1
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 172.63
 +
| Tons
 +
| LANDFILL
 +
| PAD059087072
 +
| MAX ENVIRONMENTAL TECHNOLOGIES INC BULGER FACILITY
 +
| BULGER
 +
| PA
 +
|-
 +
|-
 +
| 2014-1
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 234.41
 +
| Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| PAD004835146
 +
| MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY
 +
| YUKON
 +
| PA
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 151:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 2231156
 
| 2231156
 
| 2013-12-02
 
| 2013-12-02
| Washington
 
| Union Twp
 
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 
|-
 
|-
 
|-
 
|-
 
| 2239667
 
| 2239667
 
| 2013-12-27
 
| 2013-12-27
| Washington
 
| Union Twp
 
 
| No Violations Noted
 
| No Violations Noted
 +
| Alpha Hunter Rig 4.
 +
Well 592310 was spud on 12/20/2013 at 07:00.  Drilling on top portion ended on 12/27/2013 with 9 5/8ï¾” casing being set at 2688 ft. 
 +
All casing strings were cemented to surface as planned except for 20ï¾” casing.  It was necessary to do grout job on 20ï¾” casing (pumped 62 bbls and got cement to surface). 
 +
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2306037
 +
| 2014-09-17
 +
| No Violations Noted
 +
| Site ID sign was correct. ESCGP was on-site. AST was erected on pad. No E&S issues noted. Well labels need updated. The site inspection was conducted concurrently with inspections for its associated wells. Wells on this pad target the Marcellus or Geneseo layers.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2342440
 +
| 2015-02-06
 +
| No Violations Noted
 +
| Nabors Completion and Production Services Finished fracturing stage 19 of 26 stages planned for this well. Stage 19 is 120 ft. long and took approximately 1 hour and 23 min. to complete. There were 40 shots were used to perforate the stage. Currently preparing to start stage 20.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2344556
 +
| 2015-02-17
 +
| No Violations Noted
 +
| Nabors Completion and Production Services Finished fracturing stage 26 on 2/8/15. Stage 26 was the last stage for this well.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2349789
 +
| 2015-03-05
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2356562
 +
| 2015-03-31
 +
| No Violations Noted
 +
| C&J Energy Services Started coiled tubing frack plug drill out on 3/29/15. Currently coming out of hole after finishing drilling out last plug. A gel sweep is run every 5th plug and a short trip is run every 8th plug to clean hole.
 +
|
 +
|
 +
|
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 12:00, 26 June 2015

Well Details

Well ID: 37-125-27175
Loading map...
County: Washington
Municipality: Union Township
Operator Name: EQT PRODUCTION CO
Well Pad ID: 145422
Farm/Lease Name: TRAX FARMS 592310
First Permit Date: 2013-11-12
Last Permit Date: 2014-02-13
Spud Date: 2013-11-14
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 40.27768
Longitude: -80.027391

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-2 0.0 0.0 0.0 0.0 0.0 0.0
2014-1 0.0 0.0 0.0 0.0 0.0 0.0
2014-2 0.0 0.0 0.0 0.0 0.0 0.0
2015-02 0.0 0.0 0.0 0.0 0.0 0.0
2015-01 0.0 0.0 0.0 0.0 0.0 0.0
2015-03 0.0 0.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2014-1 DRILL CUTTINGS 172.63 Tons LANDFILL PAD059087072 MAX ENVIRONMENTAL TECHNOLOGIES INC BULGER FACILITY BULGER PA
2014-1 DRILL CUTTINGS 234.41 Tons RESIDUAL WASTE TRANSFER FACILITY PAD004835146 MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY YUKON PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2231156 2013-12-02 No Violations Noted
2239667 2013-12-27 No Violations Noted Alpha Hunter Rig 4.

Well 592310 was spud on 12/20/2013 at 07:00. Drilling on top portion ended on 12/27/2013 with 9 5/8ï¾” casing being set at 2688 ft. All casing strings were cemented to surface as planned except for 20ï¾” casing. It was necessary to do grout job on 20ï¾” casing (pumped 62 bbls and got cement to surface).

2306037 2014-09-17 No Violations Noted Site ID sign was correct. ESCGP was on-site. AST was erected on pad. No E&S issues noted. Well labels need updated. The site inspection was conducted concurrently with inspections for its associated wells. Wells on this pad target the Marcellus or Geneseo layers.
2342440 2015-02-06 No Violations Noted Nabors Completion and Production Services Finished fracturing stage 19 of 26 stages planned for this well. Stage 19 is 120 ft. long and took approximately 1 hour and 23 min. to complete. There were 40 shots were used to perforate the stage. Currently preparing to start stage 20.
2344556 2015-02-17 No Violations Noted Nabors Completion and Production Services Finished fracturing stage 26 on 2/8/15. Stage 26 was the last stage for this well.
2349789 2015-03-05 No Violations Noted
2356562 2015-03-31 No Violations Noted C&J Energy Services Started coiled tubing frack plug drill out on 3/29/15. Currently coming out of hole after finishing drilling out last plug. A gel sweep is run every 5th plug and a short trip is run every 8th plug to clean hole.

For data sources see[3]

References