X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0354242114022"

m
m
 
Line 156: Line 156:
 
| style="text-align: right;" | 844.50
 
| style="text-align: right;" | 844.50
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
|-
 
| 2005-05-11
 
| Fracture
 
| style="text-align: right;" | 842.50
 
| style="text-align: right;" | 844.50
 
| style="text-align: right;" | 0
 
|-
 
| 2008-09-03
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 831.00
 
| style="text-align: right;" | 839.00
 
| style="text-align: right;" | 0
 
|-
 
| 2008-09-03
 
| Perforation
 
| style="text-align: right;" | 572.50
 
| style="text-align: right;" | 573.50
 
| style="text-align: right;" | 13
 
|-
 
| 2008-09-03
 
| Perforation
 
| style="text-align: right;" | 562.70
 
| style="text-align: right;" | 563.70
 
| style="text-align: right;" | 13
 
|-
 
| 2008-09-03
 
| Perforation
 
| style="text-align: right;" | 556.80
 
| style="text-align: right;" | 557.80
 
| style="text-align: right;" | 13
 
|-
 
| 2008-09-03
 
| Perforation
 
| style="text-align: right;" | 549.20
 
| style="text-align: right;" | 550.20
 
| style="text-align: right;" | 13
 
|-
 
| 2008-09-03
 
| Perforation
 
| style="text-align: right;" | 547.00
 
| style="text-align: right;" | 548.00
 
| style="text-align: right;" | 13
 
|-
 
| 2008-09-03
 
| Perforation
 
| style="text-align: right;" | 538.90
 
| style="text-align: right;" | 539.90
 
| style="text-align: right;" | 13
 
 
|-
 
|-
 
| 2008-09-03
 
| 2008-09-03
Line 263: Line 215:
 
| style="text-align: right;" | 556.80
 
| style="text-align: right;" | 556.80
 
| style="text-align: right;" | 573.50
 
| style="text-align: right;" | 573.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-05-11
 +
| Fracture
 +
| style="text-align: right;" | 842.50
 +
| style="text-align: right;" | 844.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 270: Line 228:
 
| style="text-align: right;" | 539.90
 
| style="text-align: right;" | 539.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 2008-09-03
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 831.00
 +
| style="text-align: right;" | 839.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2008-09-03
 +
| Perforation
 +
| style="text-align: right;" | 572.50
 +
| style="text-align: right;" | 573.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-09-03
 +
| Perforation
 +
| style="text-align: right;" | 562.70
 +
| style="text-align: right;" | 563.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-09-03
 +
| Perforation
 +
| style="text-align: right;" | 556.80
 +
| style="text-align: right;" | 557.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-09-03
 +
| Perforation
 +
| style="text-align: right;" | 549.20
 +
| style="text-align: right;" | 550.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-09-03
 +
| Perforation
 +
| style="text-align: right;" | 547.00
 +
| style="text-align: right;" | 548.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-09-03
 +
| Perforation
 +
| style="text-align: right;" | 538.90
 +
| style="text-align: right;" | 539.90
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
|}
 
|}
Line 427: Line 427:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 13:38, 31 January 2021

Well Details

Well ID: 0354242114022
Loading map...
Location: 02/14-21-035-24W4/2
Location Alias: 02/14-21-35-24 W4M
Location Alias 2: 02/14-21-035-24 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 24
Section: 21
County/Municipality: Red Deer County
Well Name: EMBER 102 HUXLEY 14-21-35-24
Operator Name: Ember Resources Inc.
License Number: 0326820
License Date: 2005-02-23
License Status: Amended
Spud Date: 2005-03-16
Final Drill Date: 2005-03-20
Well Total Depth: 944.00 m
Surface Hole Latitude: 52.024699
Surface Hole Longitude: -113.376859

For data sources see[1][2]

Well History

Date Event
2005-02-23 Obtained License
2005-03-18 Lost Circulation Occurred
2005-03-18 Surface Casing Operation Performed
2005-03-19 Well Log Performed
2005-03-20 Finished Drilling
2005-03-20 Well Mode changed to Drilled and Cased
2005-03-21 Production Casing Operation Performed
2005-03-21 Rig Released
2005-04-13 Perforation Treatment Performed - Jet Perforation
2005-05-11 Perforation Treatment Performed - Fractured
2008-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-03 Perforation Treatment Performed - Jet Perforation
2008-09-03 Plug Back Performed
2008-09-15 Perforation Treatment Performed - Fractured
2008-09-19 Well Fluid changed to Coalbed Methane-Coals Only
2008-09-19 Well Mode changed to Testing
2008-09-23 Well Began Production
2008-09-23 Well Fluid changed to Coalbed Methane-Coals Only
2008-09-23 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-04-13 Perforation 842.50 844.50 14
2008-09-03 Perforation 513.60 514.60 13
2008-09-03 Perforation 494.40 495.40 13
2008-09-03 Perforation 490.80 492.80 13
2008-09-03 Perforation 482.80 483.80 13
2008-09-03 Perforation 474.20 475.70 13
2008-09-03 Perforation 432.90 433.90 13
2008-09-03 Perforation 426.90 433.90 13
2008-09-03 Perforation 426.10 427.10 13
2008-09-03 Perforation 416.30 417.30 13
2008-09-15 Fracture 556.80 573.50 0
2005-05-11 Fracture 842.50 844.50 0
2008-09-15 Fracture 416.30 539.90 0
2008-09-03 Packing Device Capped w/Cement 831.00 839.00 0
2008-09-03 Perforation 572.50 573.50 13
2008-09-03 Perforation 562.70 563.70 13
2008-09-03 Perforation 556.80 557.80 13
2008-09-03 Perforation 549.20 550.20 13
2008-09-03 Perforation 547.00 548.00 13
2008-09-03 Perforation 538.90 539.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 2052 0.0 0.0 0.0
2009 8265 0.0 0.0 0.0
2010 8638 0.0 0.0 0.0
2011 8429 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8574 0.0 0.0 0.0
2014 8495 0.0 0.0 0.0
2015 8564 0.0 0.0 0.0
2016 8540 0.0 0.0 0.0
2017 8444 0.0 0.0 0.0
2018 8546 0.0 0.0 0.0
2019 8598 0.0 0.0 0.0
2020 2172 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2005-03-18 Lost Circulation 190.00 190.00

For data sources see[6]

References