If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 174: | Line 174: | ||
| style="text-align: right;" | 2174.00 | | style="text-align: right;" | 2174.00 | ||
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 1999-03-22 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1930.00 | ||
+ | | style="text-align: right;" | 1935.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 1999-03-23 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 1930.00 | ||
+ | | style="text-align: right;" | 1935.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1996-02-11 | | 1996-02-11 | ||
Line 221: | Line 233: | ||
| style="text-align: right;" | 2582.00 | | style="text-align: right;" | 2582.00 | ||
| style="text-align: right;" | 2590.00 | | style="text-align: right;" | 2590.00 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 298: | Line 298: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0595160610002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.073877,"lon":-116.386511,"icon":""}]} |
Location: 00/10-06-059-16W5/2 | |
Location Alias: 00/10-06-59-16 W5M | |
Location Alias 2: 00/10-06-059-16 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 16 | |
Section: 06 | |
County/Municipality: Woodlands County | |
Well Name: OUTLIER KAYBOBS 10-6-59-16 | |
Operator Name: Outlier Resources Ltd. | |
License Number: 0147669 | |
License Date: 1991-01-28 | |
License Status: Suspension | |
Spud Date: 1991-02-10 | |
Final Drill Date: 1991-03-12 | |
Well Total Depth: 3000.00 m | |
Surface Hole Latitude: 54.073877 | |
Surface Hole Longitude: -116.386511 |
Date | Event |
---|---|
1991-01-28 | Obtained License |
1991-02-12 | Surface Casing Operation Performed |
1991-03-01 | Well Log Performed |
1991-03-03 | Well Log Performed |
1991-03-04 | Intermediate Casing Operation Performed |
1991-03-12 | Finished Drilling |
1991-03-12 | Well Log Performed |
1991-03-12 | Well Mode changed to Drilled and Cased |
1991-03-15 | Liner Casing Operation Performed |
1991-03-16 | Rig Released |
1996-02-08 | Well Log Performed |
1996-02-11 | Perforation Treatment Performed - Jet Perforation |
1996-02-11 | Well Log Performed |
1996-02-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-02-16 | Perforation Treatment Performed - Fractured |
1999-01-26 | Perforation Treatment Performed - Cement Squeeze |
1999-02-08 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1999-02-10 | Well Log Performed |
1999-02-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-03-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-03-21 | Plug Back Performed |
1999-03-21 | Well Log Performed |
1999-03-22 | Perforation Treatment Performed - Jet Perforation |
1999-03-22 | Well Log Performed |
1999-03-23 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-02-11 | Perforation | 2173.00 | 2174.00 | 17 |
1999-03-22 | Perforation | 1930.00 | 1935.00 | 17 |
1999-03-23 | Fracture | 1930.00 | 1935.00 | 0 |
1996-02-11 | Perforation | 2175.50 | 2180.00 | 17 |
1996-02-14 | Acid Treatment | 2173.00 | 2180.00 | 0 |
1996-02-16 | Fracture | 2173.00 | 2180.00 | 0 |
1999-01-26 | Cement Squeeze | 2173.00 | 2180.00 | 0 |
1999-02-08 | Hydra Jet Perforation | 2652.00 | 2656.40 | 1 |
1999-02-14 | Acid Treatment | 2652.00 | 2656.40 | 0 |
1999-03-21 | Packing Device Capped w/Cement | 2156.00 | 2164.00 | 0 |
1999-03-21 | Packing Device Capped w/Cement | 2582.00 | 2590.00 | 0 |
For data sources see[4]