If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 101: | Line 101: | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Wells]] |
Well ID: 37-005-29208 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.66685,"lon":-79.620788,"icon":""}]} |
Operator Name: US ENERGY EXPLORATION CORP | |
First Permit Date: 2007-03-20 | |
Last Permit Date: 2007-03-20 | |
Spud Date: 2008-03-11 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.66685 | |
Longitude: -79.620788 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2011-0 | 3490.0 | 360.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 4639.0 | 360.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 8553.0 | 360.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2008-0 | 1328.0 | 90.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1965014 | 2011-04-12 | No Violations Noted | Drilling was completed on 03/20/08. Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. No accelerated erosion or sedimentation was observed in conjunction with the access road or well-site. |