X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-065-26301"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-065-26301
 
| Well ID: 37-065-26301
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.983068, -79.112043 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.983068, -79.112043 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: SCHURR MOWER 3
 
| Farm/Lease Name: SCHURR MOWER 3
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
 
| Spud Date: 2008-06-24
 
| Spud Date: 2008-06-24
 
|-
 
|-
 
| Permit Date: 2008-05-23
 
| Permit Date: 2008-05-23
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.983068
 
| Latitude: 40.983068
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2008-05-23
 +
| New Permit Application
 +
|-
 +
| 2008-06-24
 +
| Performed Spud Operation
 +
|-
 +
| 2008-06-26
 +
| Drilling Completion
 +
|-
 +
| 2008-07-09
 +
| Perforation
 +
|-
 +
| 2008-10-24
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 128:
 
| 2008
 
| 2008
 
| [[JR RESOURCES LP]]
 
| [[JR RESOURCES LP]]
| style="text-align: right;" | 2,219.00
+
| style="text-align: right;" | 2219.00
 
| style="text-align: right;" | 66
 
| style="text-align: right;" | 66
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 96: Line 137:
 
| 2009
 
| 2009
 
| [[JR RESOURCES LP]]
 
| [[JR RESOURCES LP]]
| style="text-align: right;" | 8,444.00
+
| style="text-align: right;" | 8444.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 179: Line 220:
 
| style="text-align: right;" | 2,325.17
 
| style="text-align: right;" | 2,325.17
 
| style="text-align: right;" | 351
 
| style="text-align: right;" | 351
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[JR RESOURCES LP]]
 +
| style="text-align: right;" | 2,416.34
 +
| style="text-align: right;" | 354
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 202: Line 252:
 
| 2010
 
| 2010
 
| [[JR RESOURCES LP]]
 
| [[JR RESOURCES LP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 79.00 Bbl
 
| style="text-align: right;" | 79.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 209: Line 259:
 
| 2012
 
| 2012
 
| [[JR RESOURCES LP]]
 
| [[JR RESOURCES LP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 216: Line 266:
 
| 2016
 
| 2016
 
| [[JR RESOURCES LP]]
 
| [[JR RESOURCES LP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT

Latest revision as of 20:57, 16 May 2020

Well Details

Well ID: 37-065-26301
Loading map...
Country: United States
State: Pennsylvania
County: Jefferson
Municipality: Oliver Township
Operator Name: JR RESOURCES LP
Well Pad ID:
Farm/Lease Name: SCHURR MOWER 3
License Status: ACTIVE
Spud Date: 2008-06-24
Permit Date: 2008-05-23
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.983068
Longitude: -79.112043

For data sources see[1][2][3]

Well History

Date Event
2008-05-23 New Permit Application
2008-06-24 Performed Spud Operation
2008-06-26 Drilling Completion
2008-07-09 Perforation
2008-10-24 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 JR RESOURCES LP 2219.00 66 0.00 0 0.00 0
2009 JR RESOURCES LP 8444.00 365 0.00 0 0.00 0
2010 JR RESOURCES LP 6,975.32 354 0.00 0 0.00 0
2011 JR RESOURCES LP 6,332.01 356 0.00 0 0.00 0
2012 JR RESOURCES LP 4,999.76 352 0.00 0 0.00 0
2013 JR RESOURCES LP 3,890.05 355 0.00 0 0.00 0
2014 JR RESOURCES LP 3,342.29 357 0.00 0 0.00 0
2015 JR RESOURCES LP 2,792.09 353 0.00 0 0.00 0
2016 JR RESOURCES LP 2,927.53 355 0.00 0 0.00 0
2017 JR RESOURCES LP 2,623.26 365 0.00 0 0.00 0
2018 JR RESOURCES LP 2,325.17 351 0.00 0 0.00 0
2019 JR RESOURCES LP 2,416.34 354 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 JR RESOURCES LP Produced Fluid 79.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2012 JR RESOURCES LP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2016 JR RESOURCES LP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2075323 Primary Facility 2012-06-06 Routine/Complete Inspection No Violations Noted
2552631 Primary Facility 2017-01-12 Routine/Complete Inspection No Violations Noted

For data sources see[7]

References