If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-051-24393 | | Well ID: 37-051-24393 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.9028, -79.908736 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: CROUSHORE UNIT 12H | | Farm/Lease Name: CROUSHORE UNIT 12H | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 2010-09-28 | | Permit Date: 2010-09-28 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Horizontal Well | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: Yes | ||
|- | |- | ||
| Latitude: 39.9028 | | Latitude: 39.9028 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2010-09-28 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2010-11-05 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
== Fracking Activities == | == Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 62: | Line 83: | ||
| 2011-06-22 | | 2011-06-22 | ||
| 2011-06-22 | | 2011-06-22 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 7,975 |
− | | style="text-align: right;" | 1,929,794 | + | | style="text-align: right;" | 1,929,794 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
|- | |- | ||
Line 188: | Line 209: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-06-19 }}</ref> | | accessdate = 2019-06-19 }}</ref> | ||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 273: | Line 305: | ||
| 2018 | | 2018 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 83,729.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 365 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 282: | Line 314: | ||
| 2019 | | 2019 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 79,744.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 365 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 307: | Line 339: | ||
| 2011 | | 2011 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | | + | | Fracing Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 65.00 Bbl |
− | | | + | | LANDFILL |
− | | | + | | SWF 1032-WV0109 |
|- | |- | ||
| 2011 | | 2011 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | | + | | Fracing Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 12,757.00 Bbl |
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
Line 321: | Line 353: | ||
| 2011 | | 2011 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Fracing Fluid Waste | + | | Fracing Fluid Waste |
| style="text-align: right;" | 2,097.00 Bbl | | style="text-align: right;" | 2,097.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 328: | Line 360: | ||
| 2011 | | 2011 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 385.00 Bbl |
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
Line 335: | Line 367: | ||
| 2011 | | 2011 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,079.00 Bbl |
− | | | + | | INJECTION DISPOSAL WELL |
− | | | + | | 34-121-2-3995 |
|- | |- | ||
| 2012 | | 2012 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 1,709.00 Bbl | | style="text-align: right;" | 1,709.00 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 349: | Line 381: | ||
| 2012 | | 2012 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 240.00 Bbl | | style="text-align: right;" | 240.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 356: | Line 388: | ||
| 2013 | | 2013 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 580.00 Bbl | | style="text-align: right;" | 580.00 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 363: | Line 395: | ||
| 2014 | | 2014 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 1,430.33 Bbl | | style="text-align: right;" | 1,430.33 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 370: | Line 402: | ||
| 2014 | | 2014 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 20.00 Bbl | | style="text-align: right;" | 20.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 377: | Line 409: | ||
| 2015 | | 2015 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 1,054.33 Bbl | | style="text-align: right;" | 1,054.33 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 384: | Line 416: | ||
| 2016 | | 2016 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 513.34 Bbl | | style="text-align: right;" | 513.34 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 391: | Line 423: | ||
| 2016 | | 2016 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 530.36 Bbl | | style="text-align: right;" | 530.36 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 398: | Line 430: | ||
| 2017 | | 2017 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 279.33 Bbl | | style="text-align: right;" | 279.33 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 412: | Line 437: | ||
| 2017 | | 2017 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Drilling Fluid Waste | + | | Drilling Fluid Waste |
| style="text-align: right;" | 35.00 Bbl | | style="text-align: right;" | 35.00 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 419: | Line 444: | ||
| 2017 | | 2017 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 138.33 Bbl |
− | | | + | | REUSE (AT WELL PAD) |
− | | | + | | |
|- | |- | ||
| 2017 | | 2017 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 36.67 Bbl | | style="text-align: right;" | 36.67 Bbl | ||
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
| | | | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 3,416.67 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW001 | ||
|- | |- | ||
| 2018 | | 2018 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 23.33 Bbl |
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
− | | | + | | WMGR123SW005 |
|- | |- | ||
| 2018 | | 2018 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 294.01 Bbl |
− | | REUSE AT | + | | REUSE (AT WELL PAD) |
| | | | ||
|- | |- | ||
| 2018 | | 2018 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 493.34 Bbl |
− | | REUSE | + | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
| | | | ||
|- | |- | ||
| 2018 | | 2018 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 60.67 Bbl |
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
− | | | + | | WMGR123SW019 |
|- | |- | ||
| 2019 | | 2019 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 486.66 Bbl |
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | |
Well ID: 37-051-24393 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.9028,"lon":-79.908736,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: German Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 148144 | |
Farm/Lease Name: CROUSHORE UNIT 12H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-09-28 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.9028 | |
Longitude: -79.908736 |
Date | Event |
---|---|
2010-09-28 | New Permit Application |
2010-11-05 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-06-22 | 2011-06-22 | 7,975 | 1,929,794 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Iron Control A | Nalco | Iron Control | Ethylene glycol | 107-21-1 | 30.00 | 0.00690000 | |
7.5 Hcl Acid | Used to open perfs | Hydrochloric acid | 7647-01-0 | 7.50 | 0.38 | |||
Proppant (lbs) | Proppant | 100.00 | 8.52 | |||||
Unislik ST 50 | CESI Chemical | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | ||
GBL | Clearwater International | Gel Breaker | Ethylene glycol | 107-21-1 | 60.00 | 0.00002000 | ||
Biocide EC 6116A | Nalco | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00688000 | ||
Polyethylene glycol | 25322-68-3 | 60.00 | 0.01 | |||||
Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00115000 | |||||
CMHPG | Ashland | Water Viscosifier | Carboxymethylhydroxyporoyl guar blend | 100.00 | 0.00199000 | |||
Clean Volume (gals) | Carrier/Base Fluid | 100.00 | 91.48 | |||||
Scale Inhibitor A | Nalco | Scale Inhibitor | Ethylene glycol | 107-21-1 | 30.00 | 0.00680000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | ATLAS RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 88,699.00 | 72 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 237,923.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 156,010.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 129,253.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 113,979.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 101,973.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 90,920.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 83,729.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 79,744.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 65.00 Bbl | LANDFILL | SWF 1032-WV0109 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 12,757.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 2,097.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 385.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,079.00 Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 |
2012 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,709.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Produced Fluid | 240.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 580.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,430.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 20.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,054.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 513.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 530.36 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 279.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 35.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 138.33 Bbl | REUSE (AT WELL PAD) | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 36.67 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 3,416.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 23.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 294.01 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 493.34 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 60.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 486.66 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1938144 | Primary Facility | 2010-11-17 | Drilling/Alteration | No Violations Noted | HOIZONTAL MARCELLUS, (ROCKY MOUNTAIN DRILLING ) DRILLED AND CEMENTED 40' OF 24" CONDUTOR CASING. E&S IN GOOD CONDITION. |
1938151 | Primary Facility | 2010-11-29 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S IN GOOD CONDITION. WHIPSTOCK # 17 MOVING TO CROUSHORE # 12-H TODAY. |
1938157 | Primary Facility | 2010-12-03 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S IN GOOD CONDITION. WHIPSTOCK # 17 PREPAIRING TO RUN 11 3/4" COAL STRING CASING. |
1938170 | Primary Facility | 2010-12-09 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S IN GOOD CONDITION. WHIPSTOCK # 17,CEMENTING 8 5/8" INTERMEDIATE CASING STRING EVENING OF 12/8/2010.THE CEMENT FLASH SET LEAVING A UNKWOWN AMOUNT OF CEMENT INSIDE THE 8 5/8" AND FROM THE SHOE TO SURFACE.JOHN RICE CALLED FOR ADVICE. I REFERENCE TO MIKE ARCH FOR ADVICE. MR. RICE DECIDED TO DRILL OUT 8 5/8"CASING. RUN A BOND LOG TO DETERMINE WHERE THE BACK SIDE CEMENT IS LOCATED. PERFORATE ABOVE LOCATED CEMENT AND PERFORM A SQEEZE JOB. |
1938173 | Primary Facility | 2010-12-13 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,E&S IN GOOD CONDITION.WHIPSTOCK # 17MOVING OFF, NOMAC -235 MOVING ON LOCATION.DRILLING 8 5/8" INSIDE CASING TO 2854',RUNNING BOND LOG TO VERIFY CEMENT LOCATION. TOP OF CEMENT @ (2120') PLANNING TO PERF @ (2020') 100' ABOVE GOOD CEMENT. PERFORMED PERFERATIONS AND DO A SQUEEZE JOB WITH 10 BARRELS OF CEMENT RETURNS TO SURFACE. USED 570 CLASS (A) CEMENT,2% CAL. CHORIDE , NO FLAKE , AND 15.6 POUND WEIGHT MIXTURE. WAITED 12 HRS. TO SET UP.PITS LOOK GOOD. |
1939662 | Primary Facility | 2010-12-27 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS , NOMAC - 235 IS RIG ON LOCATION DRILLED TO 8460 ' CEMENTED BACK TO 6900 ' .E&S AND PITS ARE GOOD. KOP WILL BE @ 6900 ' ,LOADED HOLE WITH MUD AND CAPPED. |
1939755 | Primary Facility | 2010-12-29 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS |
1943663 | Primary Facility | 2010-01-07 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, NOMAC-235 FINISH DRILLING @ 8300 ' . CEMENTED PLUG BACK TO 7200 ' (KOP). MUDDED AND CAPPED WELL. PATTERSON - 227 MOVING ON STARTING 1/10/2011 (NEW- RIG). E&S AND PITS ARE IIN GOOD CONDITION. |
1948362 | Primary Facility | 2011-02-07 | Routine/Complete Inspection | No Violations Noted | |
1955535 | Primary Facility | 2011-03-08 | Routine/Complete Inspection | No Violations Noted | |
1958204 | Primary Facility | 2011-02-08 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS ARE IN GOOD CONDITION.FINISHING RUNNING PROD. STRIG,CLEANING HOLE PREPAIRING TO CEMENT IN LATE TONIGHT. |
1958211 | Primary Facility | 2011-02-07 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS ARE IN GOOD CONDITION. KOP 7000' LANDING IN LOWER MARCELLUS @ 8186' DRILLING ON TO TD. |
1958216 | Primary Facility | 2011-02-02 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS ARE IN GOOD CONDITION. (REVISE WELL PLAN) ATTACHED WITH PLUG BACK TWO.ATTEMTING NEW ANGLE AT LOWER MARCELLUS FORMATION. |
1958226 | Primary Facility | 2011-01-28 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,E&S AND PITS IN GOOD CONDITION.(REVISE WELL PLAN),CEMENT PLUG WAS SET @ 6100' TO HIGH IN MARCELLUS 1ST TIME. KOP @ 6985'WITH EXSPECTED LANDING POINT @ 8225'.SMALL O-RING LEAK FROM DISEL GENERATOR MOTOR. CLEAN UP,NO NOTICABLE RESIDUE ON PLASTIC COTAIMENT AREA. THE AMOUNT WAS LESS THAN 2 QUARTS. |
1958273 | Primary Facility | 2011-01-24 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS ARE IN GOOD CONDITION.NEW RIG WORKING OUT SMALL PROBLEMS.KOP @ 7200'.STARTING TO GET OFF IN CURVE. |
1961130 | Primary Facility | 2011-03-28 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,E&S AND PITS LOOK IN GOOD CONDITION. ALL WELLS ON PAD ARE COMPLETED.RIG MOVING OFF. |
1964317 | Primary Facility | 2011-04-06 | Routine/Complete Inspection | No Violations Noted | |
1984452 | Primary Facility | 2011-06-21 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS LOOK IN GOOD CONDITION. RECEIVED CALL FROM JIM BRAUNNS OF CHEVRON CONCERNING H/2 S GAS @ 6 -TANKS DESIGN TO STORE F/W FOR FRACING. STARTED @ 5.6 (PPM) @ 4:45 AND INCREASED TO 20(PPM) BY 6:00 PM,ONLY AT TOP HATCH. REMOVED ALL PERSONALIN AREA AND STARTED MONITORING THIS AREA. CONTINUE FRAC JOB UNTIL FINISH @ 7:00 PM.WAITED TILL 12:00 PM FOR CHEVRON H/2 S SAFETY CREWS WITH AIR- PACKS. THE READING WAS ZERO @ MID-NIGHT.THIS HAS HAPPEN WHEN EXTREME MUGGY AND HIGH TEMPS OCCURED. TALKED ABOUT CHLORINATION BETWEEN PITS AND STORAGE TANKS AS F/W IS BEING TRANSFER OVER. |
1984805 | Primary Facility | 2011-06-27 | Routine/Complete Inspection | No Violations Noted | |
1989862 | Primary Facility | 2011-07-20 | Routine/Complete Inspection | No Violations Noted | |
2029228 | Primary Facility | 2011-12-21 | Routine/Complete Inspection | No Violations Noted | Met onsite with Chevron representative Chad Eisenman. Drilling had been completed, well appeared tohave been equipped for production. Site grading work was in the process of being completed. Discussed final site restoration with Mr. Eisenmann while onsite. Site will be temporarily stabilized during the winter months and in the spring of 2012 final restoration will be completed. |
2101460 | Primary Facility | 2012-09-18 | Routine/Complete Inspection | No Violations Noted | Site ID sign in place, site fenced and gated, tanks in containment, wells labeled. |
2488218 | Primary Facility | 2016-05-20 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS, Routine Inspection all looks good. |
2488219 | Primary Facility | 2016-05-20 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS, Routine Inspection all looks good. |
For data sources see[8]