X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-051-24328"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-051-24328
 
| Well ID: 37-051-24328
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.010133, -79.672622 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.010133, -79.672622 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: HELEN K BUKOVAC 4H
 
| Farm/Lease Name: HELEN K BUKOVAC 4H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2010-05-26
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2010-03-12
 
| Permit Date: 2010-03-12
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.010133
 
| Latitude: 40.010133
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2010-03-12
 +
| New Permit Application
 +
|-
 +
| 2010-05-26
 +
| Performed Spud Operation
 +
|-
 +
| 2010-08-29
 +
| Drilling Completion
 +
|-
 +
| 2010-10-21
 +
| Perforation
 +
|-
 +
| 2010-10-21
 +
| Performed Stimulation 
 +
|-
 +
| 2011-02-17
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 74: Line 107:
 
|}-->
 
|}-->
  
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2010-10-21
 +
| style="text-align: right;" |
 +
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 168: Line 224:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| style="text-align: right;" | 32,647.00
+
| style="text-align: right;" | 154,410.00
| style="text-align: right;" | 78
+
| style="text-align: right;" | 352
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 193: Line 249:
 
| 2010
 
| 2010
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 1,815.00 Bbl
 
| style="text-align: right;" | 1,815.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 200: Line 256:
 
| 2011
 
| 2011
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 45.00 Bbl
+
| style="text-align: right;" | 219.00 Bbl
| REUSE OTHER THAN ROAD SPREADING
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
|  
+
| PBR
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 214: Line 270:
 
| 2011
 
| 2011
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 810.00 Bbl
+
| style="text-align: right;" | 45.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| REUSE OTHER THAN ROAD SPREADING
| PA0254185
+
|  
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 3,029.00 Bbl
 
| style="text-align: right;" | 3,029.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 228: Line 284:
 
| 2011
 
| 2011
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 219.00 Bbl
+
| style="text-align: right;" | 810.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PBR
 
|-
 
| 2012
 
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,294.00 Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| PA0254185
Line 242: Line 291:
 
| 2012
 
| 2012
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 92.00 Bbl
 
| style="text-align: right;" | 92.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 249: Line 298:
 
| 2012
 
| 2012
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 1,294.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 +
|-
 +
| 2012
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 92.00 Bbl
 
| style="text-align: right;" | 92.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 256: Line 312:
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 294.00 Bbl
 
| style="text-align: right;" | 294.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 263: Line 319:
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 294.00 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0254185
 +
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 398.00 Bbl
 
| style="text-align: right;" | 398.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 270: Line 333:
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 663.00 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0254185
 +
|-
 +
| 2014
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 177.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2014
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 210.00 Bbl
 
| style="text-align: right;" | 210.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 277: Line 354:
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 663.00 Bbl
 
| style="text-align: right;" | 663.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0254185
 
| PA0254185
|-
 
| 2014
 
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 177.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 102.00 Bbl
 
| style="text-align: right;" | 102.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 298: Line 368:
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 392.00 Bbl
 
| style="text-align: right;" | 392.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 305: Line 375:
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 290.00 Bbl
 
| style="text-align: right;" | 290.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 312: Line 382:
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 248.00 Bbl
 
| style="text-align: right;" | 248.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 319: Line 389:
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Produced Fluid
| style="text-align: right;" | 140.00 Bbl
+
| style="text-align: right;" | 255.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NW009
+
| WMGR123SW005
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Other Oil & Gas Wastes
 
| style="text-align: right;" | 110.00 Bbl
 
| style="text-align: right;" | 110.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 333: Line 403:
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 255.00 Bbl
+
| style="text-align: right;" | 165.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123SW005
+
| WMGR123NW009
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes
| style="text-align: right;" | 165.00 Bbl
+
| style="text-align: right;" | 140.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
| WMGR123NW009
Line 347: Line 417:
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 300.00 Bbl
 
| style="text-align: right;" | 300.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 135.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 200.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
| WMGR123NW009
Line 426: Line 510:
 
|-
 
|-
 
|}
 
|}
<!--==== Violations Commited ====
+
==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Inspection ID
Line 436: Line 520:
 
!scope="col" | Violation Comments
 
!scope="col" | Violation Comments
 
|-
 
|-
|}-->
+
| 2239093
<!--==== Penalties Applied ====
+
| 687336
 +
| 01/13/2014
 +
| 2014-01-13
 +
| 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution
 +
| Environmental Health & Safety
 +
|
 +
|-
 +
|}
 +
==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Violation ID
 
!scope="col" | Violation ID
Line 448: Line 540:
 
!scope="col" | Amount Collected
 
!scope="col" | Amount Collected
 
|-
 
|-
|}-->
+
| 687336
 +
| 306821
 +
| NOV - Notice of Violation
 +
| Comply/Closed
 +
|
 +
| 2014-06-06
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title =Oil and Gas Compliance Report
 
  | title =Oil and Gas Compliance Report

Latest revision as of 12:33, 16 May 2020

Well Details

Well ID: 37-051-24328
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Dunbar Township
Operator Name: XTO ENERGY INC
Well Pad ID: 148509
Farm/Lease Name: HELEN K BUKOVAC 4H
License Status:
Spud Date:
Permit Date: 2010-03-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.010133
Longitude: -79.672622

For data sources see[1][2][3]

Well History

Date Event
2010-03-12 New Permit Application
2010-05-26 Performed Spud Operation
2010-08-29 Drilling Completion
2010-10-21 Perforation
2010-10-21 Performed Stimulation
2011-02-17 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2010-10-21 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PHILLIPS EXPLORATION INC 143,357.00 52 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 772,032.00 365 0.00 0 0.00 0
2012 XTO ENERGY INC 427,808.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 322,987.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 222,476.00 363 0.00 0 0.00 0
2015 XTO ENERGY INC 229,671.00 332 0.00 0 0.00 0
2016 XTO ENERGY INC 179,489.00 352 0.00 0 0.00 0
2017 XTO ENERGY INC 170,972.82 352 0.00 0 0.00 0
2018 XTO ENERGY INC 148,205.00 344 0.00 0 0.00 0
2019 XTO ENERGY INC 154,410.00 352 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PHILLIPS EXPLORATION INC Produced Fluid 1,815.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 219.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PBR
2011 PHILLIPS EXPLORATION INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2011 PHILLIPS EXPLORATION INC Produced Fluid 45.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 PHILLIPS EXPLORATION INC Produced Fluid 3,029.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 810.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 92.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 XTO ENERGY INC Produced Fluid 1,294.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 92.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 294.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2013 XTO ENERGY INC Produced Fluid 294.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Produced Fluid 398.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2014 XTO ENERGY INC Produced Fluid 663.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 XTO ENERGY INC Produced Fluid 177.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Produced Fluid 210.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 663.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2015 XTO ENERGY INC Produced Fluid 102.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 392.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 290.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 248.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 255.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Other Oil & Gas Wastes 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 165.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Other Oil & Gas Wastes 140.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 300.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 135.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 200.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1889802 Primary Facility 2010-06-03 Drilling/Alteration No Violations Noted
1893303 Primary Facility 2010-06-16 Routine/Complete Inspection No Violations Noted
1910105 Primary Facility 2010-08-20 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, SAXON RIG -124 LANDING CURVE, TD ESTIMATED AT 11350', PITS AND E&S ARE GOOD.
2131364 Primary Facility 2013-01-15 Routine/Complete Inspection No Violations Noted Notice of termination inspection. All areas reclaimed and had at least 70% growth. Well labeled, tanks in containment, ID sign up.Site stable.
2239093 Primary Facility 2014-01-13 Incident- Response to Accident or Event Violation(s) Noted On Monday, January 13, 2014, the Department received a report about a spill that had occurred the previous day on XTO’s Helen Bukovac #4H site; I investigated on January 14, 2014.
2242810 Primary Facility 2014-01-23 Follow-up Inspection Outstanding Violations - No Viols Req'd On 1/24/2014, the Department conducted a follow -up inspection at the XTO Energy Inc’s Helen Bukovac 4H OG WELL in Dunbar Twp., Fayette County.
2278343 Primary Facility 2014-05-27 Compliance Evaluation No Violations Noted On 5/27/2014, the Department conducted a compliance evaluation inspection at the XTO Energy Inc’s Helen Bukovac 4H OG WELL in Dunbar Twp., Fayette County.
2684762 Primary Facility 2018-01-22 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well head surrounded by security fence.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2239093 687336 01/13/2014 2014-01-13 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
687336 306821 NOV - Notice of Violation Comply/Closed 2014-06-06

For data sources see[8]

References