If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-115-20556 | | Well ID: 37-115-20556 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.687194, -75.747314 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: TAYLOR UNIT 1H | | Farm/Lease Name: TAYLOR UNIT 1H | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 2011-05-19 | | Permit Date: 2011-05-19 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 41.687194 | | Latitude: 41.687194 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2011-05-19 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2011-07-14 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2011-08-03 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2011-11-06 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2011-11-06 | ||
+ | | Performed Stimulation | ||
+ | |- | ||
+ | | 2012-04-30 | ||
+ | | DEVIATED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
== Fracking Activities == | == Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 62: | Line 95: | ||
| 2011-11-07 | | 2011-11-07 | ||
| 2011-11-07 | | 2011-11-07 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 7,800 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 716,310 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
|- | |- | ||
Line 214: | Line 247: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-06-19 }}</ref> | | accessdate = 2019-06-19 }}</ref> | ||
+ | == Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | | 2011-11-06 | ||
+ | | style="text-align: right;" | | ||
+ | |||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Completion Reports - Stimulations | ||
+ | | publisher = Pennsylvania Department of Conservation and Natural Resources | ||
+ | | date = 2020-03-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-03-02 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 299: | Line 355: | ||
| 2019 | | 2019 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 15,687.79 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 292 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 324: | Line 380: | ||
| 2011 | | 2011 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Drill Cuttings | + | | Drill Cuttings |
| style="text-align: right;" | 816.43 Tons | | style="text-align: right;" | 816.43 Tons | ||
| LANDFILL | | LANDFILL | ||
Line 331: | Line 387: | ||
| 2013 | | 2013 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 500.00 Bbl | | style="text-align: right;" | 500.00 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 338: | Line 394: | ||
| 2014 | | 2014 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 1,083.90 Bbl | | style="text-align: right;" | 1,083.90 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 345: | Line 401: | ||
| 2015 | | 2015 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 780.02 Bbl | | style="text-align: right;" | 780.02 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 352: | Line 408: | ||
| 2016 | | 2016 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 740.36 Bbl | | style="text-align: right;" | 740.36 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 359: | Line 415: | ||
| 2017 | | 2017 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
+ | | style="text-align: right;" | 55.25 Bbl | ||
+ | | STORAGE PENDING DISPOSAL OR REUSE | ||
+ | | | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CHIEF OIL & GAS LLC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 150.66 Bbl | | style="text-align: right;" | 150.66 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
Line 366: | Line 429: | ||
| 2018 | | 2018 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 13.89 Bbl | | style="text-align: right;" | 13.89 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CHIEF OIL & GAS LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 259.00 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | |
Well ID: 37-115-20556 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.687194,"lon":-75.747314,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Lenox Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 146447 | |
Farm/Lease Name: TAYLOR UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-05-19 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.687194 | |
Longitude: -75.747314 |
Date | Event |
---|---|
2011-05-19 | New Permit Application |
2011-07-14 | Performed Spud Operation |
2011-08-03 | Drilling Completion |
2011-11-06 | Perforation |
2011-11-06 | Performed Stimulation |
2012-04-30 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-11-07 | 2011-11-07 | 7,800 | 716,310 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Superior Well Services | Propping Agent | |||||
Quartz | 14808-60-7 | 99.90 | 11.25 | |||||
Super Scale Control TSC | Superior Well Services | Scale Inhibitor | Anionic Polymer | |||||
Anionic Copolymer | ||||||||
1,2,4-Butanetricarboxylic acid, 2-phosphono- | 37971-36-1 | |||||||
1,2-Propylene glycol | 57-55-6 | 0.01 | ||||||
Fresh Water | Base Fluid | Fresh Water | 100.00 | 88.60 | ||||
KR-153SL | Superior Well Services | Biocide | ||||||
Ethylene glycol | 107-21-1 | 1.00 | ||||||
Diethylene glycol | 111-46-6 | |||||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.02 | |||||
Polyethylene glycol | 25322-68-3 | 50.00 | ||||||
WFR-3B | Superior Well Services | Friction Reducer | 1,2-Propylene glycol | 57-55-6 | 25.00 | |||
Ethoxylated C12-16 alcohols | 68551-12-2 | 4.00 | ||||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 0.11 | ||||||
Stoddard solvent | 8052-41-3 | 10.00 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-11-06 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHIEF OIL & GAS LLC | 22,978.00 | 40 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 78,386.00 | 338 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 68,797.99 | 311 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 43,086.82 | 310 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 25,624.73 | 194 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 6,185.31 | 106 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 15,687.79 | 292 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 816.43 Tons | LANDFILL | 301626 |
2013 | CHIEF OIL & GAS LLC | Produced Fluid | 500.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 1,083.90 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 780.02 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 740.36 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 55.25 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 150.66 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 13.89 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 259.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1990531 | Primary Facility | 2011-07-25 | Drilling/Alteration | No Violations Noted | UDI 207. Circulating at time of inspection. Haliburton on site waiting to cement 9 5/8". Company Man reported @73bbls cement returned to surface. Ran 45% excess on surface job. 35 % excess will be run on intermediate. 13 3/8" cemented with 510 sks/ 1.29Y/ 15.6 lb with gasblcok. Casing set at 505'. Drillers log on site and up to date. Logs showed 1/4" stream at 55'. Drilling depth 1814' and setting 9 5/8" at 1790'. |
1993552 | Primary Facility | 2011-08-03 | Routine/Complete Inspection | No Violations Noted | |
2005409 | Primary Facility | 2011-09-15 | Routine/Complete Inspection | No Violations Noted | |
2339375 | Primary Facility | 2015-01-27 | Routine/Complete Inspection | No Violations Noted | On 1/27/15, the Department was on site at the Chief Taylor Well Pad to conduct a routine inspection. One well has been drilled and is in production on this pad, the Taylor Unit 1H (115-20556). Well site stability is good. Pad is snow covered. Production equipment functioning with no leaks or spills detected. This inspection conducted in conjunction with an inspection of the Regency Taylor to Rogers Pipeline construction. No violations noted. |
2508815 | Primary Facility | 2016-04-19 | Routine/Complete Inspection | No Violations Noted | Inspection of the Taylor Pad in conjunction with the Regency Taylor 8-inch Lateral notice of termination inspection. |
2509927 | Primary Facility | 2016-08-11 | Site Restoration | No Violations Noted | 1. <70% perennial vegetation has been established. As photographs 1 and 2 show, an annual rye is present that is essentially choking out the perennial vegetation. Hence, permanent stabilization has not been achieved. The Department suggests brush hogging the annual vegetation.
2. As evidenced in photograph 3, silt sock is still present on the west side of the pad. Hence, not all E&S BMP’s have been removed. The Department suggests removing the silt sock. 3. The as-built diagram does not reflect the approved permits restoration plan. Namely, the cut slopes for the access road going onto the pad are not represented on the as-built plan, and the fill slope that still exists on the northwest section of the pad housing the pipeline tie-in is not reflected in the plan. The Department suggests that if Chief wants to change the restoration plan to reflect the as-built, Chief should apply for a minor modification to their plan. The Department’s determination is that the site is not permanently stabilized a |
2552326 | Primary Facility | 2017-01-04 | Site Restoration | No Violations Noted | On 1/4/17, the Department conducted an inspection of the Chief Taylor Well Pad located in Lenox Township, Susquehanna County to confirm Chief’s assessment that the site meets the minimum requirements as defined in Chapter 102.22(C) for permanent stabilization which would thus fulfill the physical requirements necessary for the permits termination. Since the ESCGP permit application was received by the Department after November 19, 2010 on February 28, 2011, and since the well pad is to remain in full or partial existence, the Department inspected the following requirements related to this termination application:
1. >70% perennial vegetation has been established. 2. All temporary E&S BMP’s have been removed. 3. The accompanying record drawing reflecting the as-built conditions submitted with the Notice of Termination application does not reflect the approved permits restoration plan. A discussion with Chris Vassallo, P.E., Chief Senior Construction Engineer revealed that the above mentioned Record Dr |
2562229 | Primary Facility | 2017-02-13 | Routine/Complete Inspection | No Violations Noted | |
2660432 | Primary Facility | 2017-11-08 | Routine/Complete Inspection | No Violations Noted | Refer to inspection id# 2660375. |
For data sources see[9]