X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-22440"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-22440
 
| Well ID: 37-005-22440
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.732857, -79.574612 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.732857, -79.574612 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: ELMO B & VIRGINIA L CECCHETTI 3
 
| Farm/Lease Name: ELMO B & VIRGINIA L CECCHETTI 3
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 1980-01-03
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 1979-12-28
 
| Permit Date: 1979-12-28
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.732857
 
| Latitude: 40.732857
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1979-12-28
 +
| New Permit Application
 +
|-
 +
| 1980-01-03
 +
| Performed Spud Operation
 +
|-
 +
| 1980-01-17
 +
| Drilling Completion
 +
|-
 +
| 1980-03-24
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 98:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 86: Line 124:
 
|-
 
|-
 
| 1994
 
| 1994
| [[BARON CREST ENERGY CO]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 2,989.00
 
| style="text-align: right;" | 2,989.00
 
| style="text-align: right;" | 362
 
| style="text-align: right;" | 362
Line 95: Line 133:
 
|-
 
|-
 
| 1995
 
| 1995
| [[BARON CREST ENERGY CO]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 2,802.67
 
| style="text-align: right;" | 2,802.67
 
| style="text-align: right;" | 355
 
| style="text-align: right;" | 355
Line 104: Line 142:
 
|-
 
|-
 
| 1996
 
| 1996
| [[BARON CREST ENERGY CO]]
+
| style="text-align: right;" |
| style="text-align: right;" | 2,466.00
+
| style="text-align: right;" | 2466
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 113: Line 151:
 
|-
 
|-
 
| 1997
 
| 1997
| [[BARON CREST ENERGY CO]]
+
| style="text-align: right;" |
| style="text-align: right;" | 1,976.00
+
| style="text-align: right;" | 1976
 
| style="text-align: right;" | 329
 
| style="text-align: right;" | 329
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 122: Line 160:
 
|-
 
|-
 
| 1998
 
| 1998
| [[BARON CREST ENERGY CO]]
+
| style="text-align: right;" |
| style="text-align: right;" | 1,400.00
+
| style="text-align: right;" | 1400
 
| style="text-align: right;" | 315
 
| style="text-align: right;" | 315
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 131: Line 169:
 
|-
 
|-
 
| 1999
 
| 1999
| [[BARON CREST ENERGY CO]]
+
| style="text-align: right;" |
| style="text-align: right;" | 2,291.00
+
| style="text-align: right;" | 2291
 
| style="text-align: right;" | 336
 
| style="text-align: right;" | 336
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 140: Line 178:
 
|-
 
|-
 
| 2000
 
| 2000
| [[BARON CREST ENERGY CO]]
+
| style="text-align: right;" |
| style="text-align: right;" | 1,931.00
+
| style="text-align: right;" | 1931
 
| style="text-align: right;" | 336
 
| style="text-align: right;" | 336
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 149: Line 187:
 
|-
 
|-
 
| 2001
 
| 2001
| [[BARON CREST ENERGY CO]]
+
| style="text-align: right;" |
| style="text-align: right;" | 697.00
+
| style="text-align: right;" | 697
 
| style="text-align: right;" | 336
 
| style="text-align: right;" | 336
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 158: Line 196:
 
|-
 
|-
 
| 2002
 
| 2002
| [[BARON CREST ENERGY CO]]
+
| style="text-align: right;" |
| style="text-align: right;" | 1,465.00
+
| style="text-align: right;" | 1465
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 167: Line 205:
 
|-
 
|-
 
| 2003
 
| 2003
| [[BARON CREST ENERGY CO]]
+
| style="text-align: right;" |
| style="text-align: right;" | 2,031.00
+
| style="text-align: right;" | 2031
 
| style="text-align: right;" | 321
 
| style="text-align: right;" | 321
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 176: Line 214:
 
|-
 
|-
 
| 2004
 
| 2004
| [[BARON CREST ENERGY CO]]
+
| style="text-align: right;" |
| style="text-align: right;" | 2,017.00
+
| style="text-align: right;" | 2017
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 185: Line 223:
 
|-
 
|-
 
| 2005
 
| 2005
| [[BARON CREST ENERGY CO]]
+
| style="text-align: right;" |
| style="text-align: right;" | 2,028.00
+
| style="text-align: right;" | 2028
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 194: Line 232:
 
|-
 
|-
 
| 2006
 
| 2006
| [[BARON CREST ENERGY CO]]
+
| style="text-align: right;" |
| style="text-align: right;" | 1,861.00
+
| style="text-align: right;" | 1861.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 222: Line 260:
 
| 2009
 
| 2009
 
| [[STEWART INC]]
 
| [[STEWART INC]]
| style="text-align: right;" | 1,729.33
+
| style="text-align: right;" | 1729.33
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 319: Line 357:
 
| 2017
 
| 2017
 
| [[MTN V OIL & GAS INC]]
 
| [[MTN V OIL & GAS INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 25.00 Bbl
 
| style="text-align: right;" | 25.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE

Latest revision as of 21:34, 20 May 2020

Well Details

Well ID: 37-005-22440
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Bethel Township
Operator Name: MTN V OIL & GAS INC
Well Pad ID:
Farm/Lease Name: ELMO B & VIRGINIA L CECCHETTI 3
License Status: ACTIVE
Spud Date:
Permit Date: 1979-12-28
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.732857
Longitude: -79.574612

For data sources see[1][2][3]

Well History

Date Event
1979-12-28 New Permit Application
1980-01-03 Performed Spud Operation
1980-01-17 Drilling Completion
1980-03-24 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1994 2,989.00 362 0.00 0 0.00 0
1995 2,802.67 355 0.00 0 0.00 0
1996 2466 365 0.00 0 0.00 0
1997 1976 329 0.00 0 0.00 0
1998 1400 315 0.00 0 0.00 0
1999 2291 336 0.00 0 0.00 0
2000 1931 336 0.00 0 0.00 0
2001 697 336 0.00 0 0.00 0
2002 1465 364 0.00 0 0.00 0
2003 2031 321 0.00 0 0.00 0
2004 2017 365 0.00 0 0.00 0
2005 2028 365 0.00 0 0.00 0
2006 1861.00 365 0.00 0 0.00 0
2007 STEWART INC 0.00 0 0.00 0 0.00 0
2008 STEWART INC 1,744.67 363 0.00 0 0.00 0
2009 STEWART INC 1729.33 360 0.00 0 0.00 0
2010 STEWART INC 1,713.67 365 0.00 0 0.00 0
2011 STEWART INC 1,688.67 365 0.00 0 0.00 0
2013 STEWART INC 1,636.33 365 0.00 0 0.00 0
2014 MTN V OIL & GAS INC 1,773.00 365 0.00 0 0.00 0
2015 MTN V OIL & GAS INC 1,340.00 365 0.00 0 0.00 0
2016 MTN V OIL & GAS INC 1,278.00 366 0.00 0 0.00 0
2017 MTN V OIL & GAS INC 1,473.55 365 0.00 0 0.00 0
2018 MTN V OIL & GAS INC 1,502.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 MTN V OIL & GAS INC Produced Fluid 25.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2639364 Primary Facility 2017-09-25 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. There was no observed accelerated erosion or sedimentation in relation to the site or access road.

For data sources see[7]

References