X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-035-21196"

m
m
Line 149: Line 149:
 
|-
 
|-
 
| 2017
 
| 2017
| [[ANADARKO E&P ONSHORE LLC]]
+
| [[ARD OPR LLC]]
 
| style="text-align: right;" | 187,494.37
 
| style="text-align: right;" | 187,494.37
 
| style="text-align: right;" | 349
 
| style="text-align: right;" | 349
Line 185: Line 185:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 190: Line 191:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2012-S02
+
| 2012
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 2,828.13 Bbl
 
| style="text-align: right;" | 2,828.13 Bbl
Line 196: Line 198:
 
|  
 
|  
 
|-
 
|-
| 2013-S01
+
| 2013
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 3,316.16 Bbl
+
| style="text-align: right;" | 5,317.95 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2013-S02
+
| 2014
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 2,001.79 Bbl
+
| style="text-align: right;" | 6,754.76 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2014-S01
+
| 2015
| Produced Fluid (in Barrels)
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 3,730.93 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2014-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 3,023.83 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2015-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 2,806.67 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2015-S02
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 92.00 Bbl
 
| style="text-align: right;" | 92.00 Bbl
Line 232: Line 219:
 
| WMGR119
 
| WMGR119
 
|-
 
|-
| 2015-S02
+
| 2015
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 836.00 Bbl
 
| style="text-align: right;" | 836.00 Bbl
Line 238: Line 226:
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2016-M09
+
| 2015
| Produced Fluid (in Barrels) RWC 802
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 896.71 Bbl
+
| Produced Fluid (in Barrels)
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| style="text-align: right;" | 2,806.67 Bbl
| WMGR119
+
| REUSE OTHER THAN ROAD SPREADING
 +
|  
 
|-
 
|-
| 2016-M10
+
| 2016
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 460.00 Bbl
+
| style="text-align: right;" | 444.00 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR119
 
| WMGR119
 
|-
 
|-
| 2016-M10
+
| 2016
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 120.00 Bbl
+
| style="text-align: right;" | 1,816.71 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC010
 
|-
 
| 2016-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 460.00 Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR119
 
| WMGR119
 
|-
 
|-
| 2016-M11
+
| 2016
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 120.00 Bbl
+
| style="text-align: right;" | 240.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2016-M12
+
| 2017
 +
| [[ARD OPR LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 444.00 Bbl
+
| style="text-align: right;" | 373.24 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| REUSE (AT WELL PAD)
| WMGR119
+
|  
 
|-
 
|-
| 2017-M01
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[ARD OPR LLC]]
| style="text-align: right;" | 444.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR119
 
|-
 
| 2017-M02
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 187.00 Bbl
+
| style="text-align: right;" | 508.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2017-M02
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[ARD OPR LLC]]
| style="text-align: right;" | 202.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 377.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 380.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 95.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
|-
 
| 2017-M05
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 292.00 Bbl
+
| style="text-align: right;" | 1,091.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 71.00 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
| WMGR123NW005
 
|-
 
|-
| 2017-M06
+
| 2017
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 482.00 Bbl
+
| style="text-align: right;" | 444.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NC010
+
| WMGR119
 
|-
 
|-
| 2017-M07
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[ARD OPR LLC]]
| style="text-align: right;" | 226.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
|-
 
| 2017-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 224.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M08
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
Line 346: Line 289:
 
| 34-031-27177
 
| 34-031-27177
 
|-
 
|-
| 2017-M08
+
| 2017
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 69.00 Bbl
+
| style="text-align: right;" | 2,085.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2017-M08
+
| 2018
 +
| [[ARD OPR LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 296.00 Bbl
+
| style="text-align: right;" | 2,345.81 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
|-
 
| 2017-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 417.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
|-
 
| 2017-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 239.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
|-
 
| 2017-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 59.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 68.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
|-
 
| 2017-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 373.24 Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M01
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[ARD OPR LLC]]
| style="text-align: right;" | 95.81 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M02
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 120.00 Bbl
+
| style="text-align: right;" | 1,200.25 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 269.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 357.70 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 71.12 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 141.76 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 377.30 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 444.74 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 472.65 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2018-M10
+
| 2018
 +
| [[ARD OPR LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 198.67 Bbl
 
| style="text-align: right;" | 198.67 Bbl
Line 448: Line 317:
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2018-M10
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[ARD OPR LLC]]
| style="text-align: right;" | 329.97 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2018-M11
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 89.01 Bbl
 
| style="text-align: right;" | 89.01 Bbl
Line 460: Line 324:
 
| WMGR119
 
| WMGR119
 
|-
 
|-
| 2018-M11
+
| 2019
 +
| [[ARD OPR LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 397.63 Bbl
+
| style="text-align: right;" | 746.56 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2018-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 468.38 Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2019-M01
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[ARD OPR LLC]]
| style="text-align: right;" | 266.93 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2019-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 209.29 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 157.12 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2019-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 308.56 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M02
 
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| style="text-align: right;" | 9.23 Tons
 
| style="text-align: right;" | 9.23 Tons
Line 502: Line 338:
 
| 100955
 
| 100955
 
|-
 
|-
| 2019-M03
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[ARD OPR LLC]]
| style="text-align: right;" | 139.79 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2019-M03
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 184.67 Bbl
 
| style="text-align: right;" | 184.67 Bbl
Line 514: Line 345:
 
| WMGR123NC018
 
| WMGR123NC018
 
|-
 
|-
| 2019-M03
+
| 2019
 +
| [[ARD OPR LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 228.71 Bbl
+
| style="text-align: right;" | 563.84 Bbl
| REUSE (AT WELL PAD)
+
| RESIDUAL WASTE PROCESSING FACILITY
|  
+
| WMGR123NC010
 
|-
 
|-
 
|}
 
|}

Revision as of 08:55, 19 August 2019

Well Details

Well ID: 37-035-21196
Loading map...
Country: United States
State: Pennsylvania
County: Clinton
Municipality: Noyes Township
Operator Name: ARD OPR LLC
Well Pad ID: 148086
Farm/Lease Name: COP TRACT 678 B1001H
License Status: Active
Spud Date: 2010-05-07
Permit Date: 2010-04-09
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.284158
Longitude: -77.712414

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ANADARKO E&P ONSHORE LLC 95,928.00 44 0.00 0 0.00 0
2011 ANADARKO E&P ONSHORE LLC 531,108.00 346 0.00 0 0.00 0
2012 ANADARKO E&P ONSHORE LLC 351,292.00 365 0.00 0 0.00 0
2013 ANADARKO E&P ONSHORE LLC 264,443.00 363 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 227,664.00 351 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 134,670.00 240 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 138,380.00 156 0.00 0 0.00 0
2017 ARD OPR LLC 187,494.37 349 0.00 0 0.00 0
2018 ARD OPR LLC 154,748.13 353 0.00 0 0.00 0
2019 ARD OPR LLC 37,962.72 88 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 2,828.13 Bbl REUSE OTHER THAN ROAD SPREADING
2013 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 5,317.95 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 6,754.76 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 92.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2015 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 836.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 2,806.67 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 444.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 1,816.71 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 240.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2017 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 373.24 Bbl REUSE (AT WELL PAD)
2017 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 508.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 1,091.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 444.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2017 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 20.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2017 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 2,085.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 2,345.81 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 1,200.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 198.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 89.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 746.56 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 9.23 Tons LANDFILL 100955
2019 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 184.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 563.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1897845 Primary Facility 2010-07-07 Drilling/Alteration No Violations Noted Plugging back to KOP
1907640 Primary Facility 2010-08-20 Drilling/Alteration No Violations Noted Drilling Complete 13910' TD
1919990 Primary Facility 2010-10-14 Drilling/Alteration No Violations Noted Well has been fraced, and plugs will be drilled out when Bobcat coil tubing is finished on the 1006H well.
1967209 Primary Facility 2011-04-19 Routine/Partial Inspection Violation(s) Noted Missing well tag
1971888 Primary Facility 2011-05-06 Routine/Partial Inspection No Violations Noted
2049965 Primary Facility 2012-02-22 Routine/Complete Inspection No Violations Noted
2093106 Primary Facility 2012-07-11 Routine/Complete Inspection No Violations Noted
2702673 Primary Facility 2018-03-07 Routine/Complete Inspection No Violations Noted Routine site inspection at ARD Operating LLC COP TRACT 678 Pad B on March 7, 2018. No one was onsite during the inspection.

The site sign, drilling permits, weekly E & S reports, monthly tank maintenance log, and emergency response plan were onsite for review. The last weekly E&S inspection occurred on 3/5/18. The site was snow covered. The pad remains at full built-out. PSCM infiltration berms have been installed. No erosion issues were observed.

There are 3 producing Marcellus wells and 1 plugged well located on this well pad. All wells were properly tagged with the API/well permit number. Well cellars were snow covered, no bubbling was observed in the cellars. There are 3 GPU's and a dehydration unit located onsite. In addition, there are (3) 400 bbl produced fluids tanks located in secondary containment. Containment was approximately half full of frozen water. I recommend properly disposing of this water once conditions permit.

No violations noted.

2761263 Primary Facility 2018-08-03 Routine/Complete Inspection No Violations Noted Routine site inspection at ARD Operating LLC COP TRACT 678 Pad B on August 3, 2018. No one was onsite during the inspection.

The site sign, drilling permits, weekly E & S reports, monthly tank maintenance log, and emergency response plan were onsite for review. The well pad remains at full built-out. PSCM infiltration berms have been installed. No erosion issues were observed.

There are 3 producing Marcellus wells and 1 plugged well located on this well pad. All wells were properly tagged with the API/well permit number. Well cellars were full of water, no bubbling was observed in the cellars. There are 3 GPU's and a dehydration unit located onsite. In addition, there are (3) 400 bbl produced fluids tanks located in secondary containment. The secondary containment had 12"+ of water in it with a conductivity reading of 100.2 uS/cm. The fabric liner is lifting up throughout the containment. The Department recommends monitoring the linear and removing it if needed.

No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1967209 609233 04/19/2011 2011-04-19 201TAG - Failure to install, in a permanent manner, the permit number on a completed well Administrative

For data sources see[6]

References