X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-24492"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-24492
 
| Well ID: 37-129-24492
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.445177, -79.407772 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.445177, -79.407772 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 13: Line 13:
 
| Municipality: [[Loyalhanna Township,_Westmoreland_County,_Pennsylvania|Loyalhanna Township]]
 
| Municipality: [[Loyalhanna Township,_Westmoreland_County,_Pennsylvania|Loyalhanna Township]]
 
|-
 
|-
| Operator Name: [[ALLIANCE PETROLEUM CO LLC]]
+
| Operator Name: [[ALLIANCE PETRO CO LLC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 06/06/2001
+
| Spud Date: 2001-06-06
 
|-
 
|-
| Permit Date: 5/2/2001
+
| Permit Date: 2001-05-02
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 123
 
| style="text-align: right;" | 123
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
Line 74: Line 99:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
Line 83: Line 108:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
Line 119: Line 144:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 128: Line 153:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 139: Line 164:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 148: Line 173:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 157: Line 182:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 164: Line 189:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 173: Line 198:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 184: Line 209:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 191: Line 216:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 200: Line 225:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 211: Line 236:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 259: Line 284:
 
| 1047445
 
| 1047445
 
| Primary Facility
 
| Primary Facility
| 07/19/2001
+
| 2001-07-19
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 266: Line 291:
 
| 1129518
 
| 1129518
 
| Primary Facility
 
| Primary Facility
| 06/13/2002
+
| 2002-06-13
 
| Site Restoration
 
| Site Restoration
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 273: Line 298:
 
| 1153617
 
| 1153617
 
| Primary Facility
 
| Primary Facility
| 06/24/2002
+
| 2002-06-24
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 280: Line 305:
 
| 1351698
 
| 1351698
 
| Primary Facility
 
| Primary Facility
| 07/09/2004
+
| 2004-07-09
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 312: Line 337:
 
| 306675
 
| 306675
 
| 06/13/2002
 
| 06/13/2002
| 06/24/2002
+
| 2002-06-13
 
| 401 CSL - Discharge of pollultional material to waters of Commonwealth.
 
| 401 CSL - Discharge of pollultional material to waters of Commonwealth.
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 320: Line 345:
 
| 306676
 
| 306676
 
| 06/13/2002
 
| 06/13/2002
| 06/24/2002
+
| 2002-06-13
 
| 91.33B - Failure to take measures to mitigate spill impact and/or clean up w/in 15 days
 
| 91.33B - Failure to take measures to mitigate spill impact and/or clean up w/in 15 days
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 341: Line 366:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 09/30/2002
+
| 2002-09-30
| 10/02/2002
+
| 2002-10-02
 
| style="text-align: right;" | $500.00
 
| style="text-align: right;" | $500.00
 
| style="text-align: right;" | $500.00
 
| style="text-align: right;" | $500.00
Line 351: Line 376:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 06/24/2002
+
| 2002-06-24
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 360: Line 385:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 06/24/2002
+
| 2002-06-24
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 371: Line 396:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 07:16, 1 August 2019

Well Details

Well ID: 37-129-24492
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Loyalhanna Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: NELSON H GUNDY SR 3
License Status: Active
Spud Date: 2001-06-06
Permit Date: 2001-05-02
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.445177
Longitude: -79.407772

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2001 CASTLE GAS CO INC 6,583.00 123 0.00 0 0.00 0
2002 CASTLE GAS CO INC 13,974.00 365 0.00 0 0.00 0
2003 CASTLE GAS CO INC 8,360.00 365 0.00 0 0.00 0
2004 CASTLE GAS CO INC 7,096.00 365 0.00 0 0.00 0
2005 CASTLE GAS CO INC 6,033.00 365 0.00 0 0.00 0
2006 CASTLE GAS CO INC 5,470.00 365 0.00 0 0.00 0
2007 CASTLE GAS CO INC 2,811.00 334 0.00 0 0.00 0
2009 PETRO DEV CORP 3,106.00 365 0.00 0 0.00 0
2010 PETRO DEV CORP 2,983.00 365 10.00 365 0.00 0
2011 PDC MOUNTAINEER LLC 7,570.26 365 0.01 365 0.00 0
2012 PDC MOUNTAINEER LLC 2,389.93 365 0.01 366 0.00 0
2013 PDC MOUNTAINEER LLC 1,733.00 365 0.00 0 0.00 0
2014 ALLIANCE PETROLEUM CO LLC 2,814.00 365 0.00 0 0.00 0
2015 ALLIANCE PETROLEUM CO LLC 2,808.00 365 44.00 365 0.00 0
2016 ALLIANCE PETROLEUM CO LLC 2,674.00 365 0.00 0 0.00 0
2017 ALLIANCE PETROLEUM CO LLC 2,417.00 365 0.00 0 0.00 0
2018 ALLIANCE PETROLEUM CO LLC 2,690.00 365 30.00 365 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2005-A00 Brine 20.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2014-A00 Produced Fluid (in Barrels) 45.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1047445 Primary Facility 2001-07-19 Routine/Complete Inspection No Violations Noted equipped/E&S advice - additional controls on access road&site/ID&tank ok
1129518 Primary Facility 2002-06-13 Site Restoration Violation(s) Noted equipped/restored/tag ok/tank discharge
1153617 Primary Facility 2002-06-24 Compliance Evaluation No Violations Noted equipped/E&S ok/tank&tag ok/spill remediation ok
1351698 Primary Facility 2004-07-09 Routine/Complete Inspection No Violations Noted equipped/tag&tank ok - fluids advice/E&S advice - road
2834808 Primary Facility 2019-02-04 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, equipment, containment dike and 100 bbl fiberglass fluid collection tank look ok.

NOTE: The 2" fluid blow line running from the well head to the 100 bbl fiberglass fluid collection tank has FOUR 2" Dresser line leak repair clamps bolted to it and this blow line is rotted out in other places as well and is in need of replacement in order to keep waste fluid from reaching the ground.

SEE ATTACHED PHOTOS

I am requesting a follow up phone call after this blow line has been replaced. I may be reached at 412-225-0727.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1129518 306675 06/13/2002 2002-06-13 401 CSL - Discharge of pollultional material to waters of Commonwealth. Environmental Health & Safety
1129518 306676 06/13/2002 2002-06-13 91.33B - Failure to take measures to mitigate spill impact and/or clean up w/in 15 days Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
306675 102751 CACP - Consent Assessment of Civil Penalty Comply/Closed 2002-09-30 2002-10-02 $500.00 $500.00
306675 96872 NOV - Notice of Violation Comply/Closed 2002-06-24
306676 96872 NOV - Notice of Violation Comply/Closed 2002-06-24

For data sources see[6]

References