X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22134"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-22134
 
| Well ID: 37-003-22134
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.552350, -79.833636 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.552350, -79.833636 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 11/23/2010
+
| Spud Date: 2010-11-23
 
|-
 
|-
| Permit Date: 8/10/2010
+
| Permit Date: 2010-08-10
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 86:
 
|-
 
|-
 
| 2010
 
| 2010
| style="text-align: right;" |
+
| [[MARCO DRILLING INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 74: Line 99:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 83: Line 108:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 119: Line 144:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 128: Line 153:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 137: Line 162:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 151: Line 176:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 156: Line 182:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-0
+
| 2010
 +
| [[MARCO DRILLING INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 920.00 Bbl
 
| style="text-align: right;" | 920.00 Bbl
Line 162: Line 189:
 
|  
 
|  
 
|-
 
|-
| 2011-0
+
| 2011
 +
| [[MARCO DRILLING INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 950.00 Bbl
 
| style="text-align: right;" | 950.00 Bbl
Line 187: Line 215:
 
| 1913081
 
| 1913081
 
| Primary Facility
 
| Primary Facility
| 08/02/2010
+
| 2010-08-02
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 194: Line 222:
 
| 1931311
 
| 1931311
 
| Primary Facility
 
| Primary Facility
| 11/24/2010
+
| 2010-11-24
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 201: Line 229:
 
| 1933534
 
| 1933534
 
| Primary Facility
 
| Primary Facility
| 12/01/2010
+
| 2010-12-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 208: Line 236:
 
| 1933553
 
| 1933553
 
| Primary Facility
 
| Primary Facility
| 12/07/2010
+
| 2010-12-07
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 215: Line 243:
 
| 1934236
 
| 1934236
 
| Primary Facility
 
| Primary Facility
| 11/24/2010
+
| 2010-11-24
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 222: Line 250:
 
| 1934245
 
| 1934245
 
| Primary Facility
 
| Primary Facility
| 11/29/2010
+
| 2010-11-29
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 229: Line 257:
 
| 1934250
 
| 1934250
 
| Primary Facility
 
| Primary Facility
| 12/01/2010
+
| 2010-12-01
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 236: Line 264:
 
| 1934254
 
| 1934254
 
| Primary Facility
 
| Primary Facility
| 12/06/2010
+
| 2010-12-06
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 243: Line 271:
 
| 1937867
 
| 1937867
 
| Primary Facility
 
| Primary Facility
| 12/14/2010
+
| 2010-12-14
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 250: Line 278:
 
| 1937886
 
| 1937886
 
| Primary Facility
 
| Primary Facility
| 12/07/2010
+
| 2010-12-07
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 257: Line 285:
 
| 1940448
 
| 1940448
 
| Primary Facility
 
| Primary Facility
| 12/28/2010
+
| 2010-12-28
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 264: Line 292:
 
| 1953935
 
| 1953935
 
| Primary Facility
 
| Primary Facility
| 01/18/2011
+
| 2011-01-18
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 271: Line 299:
 
| 1958578
 
| 1958578
 
| Primary Facility
 
| Primary Facility
| 02/10/2011
+
| 2011-02-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 306: Line 334:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 08:01, 19 August 2019

Well Details

Well ID: 37-003-22134
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Harmar Township
Operator Name: MARCO DRILLING INC
Well Pad ID:
Farm/Lease Name: RICHARD C DEITZ ETAL 2-7
License Status: Active
Spud Date: 2010-11-23
Permit Date: 2010-08-10
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.552350
Longitude: -79.833636

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 MARCO DRILLING INC 0.00 0 0.00 0 0.00 0
2011 MARCO DRILLING INC 3,481.80 365 0.00 0 0.00 0
2012 MARCO DRILLING INC 3,227.00 365 0.00 0 0.00 0
2013 MARCO DRILLING INC 5,222.00 365 0.00 0 0.00 0
2014 MARCO DRILLING INC 5,694.00 365 0.00 0 0.00 0
2015 MARCO DRILLING INC 5,372.00 365 0.00 0 0.00 0
2016 MARCO DRILLING INC 5,136.00 365 0.00 0 0.00 0
2017 MARCO DRILLING INC 4,887.00 365 0.00 0 0.00 0
2018 MARCO DRILLING INC 4,461.00 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 MARCO DRILLING INC Produced Fluid (in Barrels) 920.00 Bbl ROAD SPREADING
2011 MARCO DRILLING INC Produced Fluid (in Barrels) 950.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026255

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1913081 Primary Facility 2010-08-02 Compliance Evaluation No Violations Noted INSPECTION FOR WELL TO BE DRILLED WITHIN 200' OF A BUILDING. WELL IS STAKED AND IT IS NOT WITHIN 200' OF ANY BUILDING.
1931311 Primary Facility 2010-11-24 Routine/Complete Inspection No Violations Noted On November 17th, 2010 I conducted a routine inspecion of the above site. Drilling was taking place. The access road was in good condition. A site ID sign and E&S plan were present. The pit appeared to be in good condition. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is achieved.
1933534 Primary Facility 2010-12-01 Routine/Complete Inspection No Violations Noted On December 1st, 2010 I conducted a routine inspecion of the above site. Drilling was taking place. The access road was in good condition. A site ID sign and E&S plan were present. The pit appeared to be in good condition and had adequate freeboard. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is achieved.
1933553 Primary Facility 2010-12-07 Routine/Complete Inspection No Violations Noted On December 7th, 2010 I conducted a routine inspecion of the above site. Drilling was completed. The access road was in good condition. All equipment was moved offsite. A site ID sign and E&S plan were present. The pit appeared to be in good condition and had adequate freeboard. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is achieved. A representative fron the Allegheny County Conservation District was on site to observe other E&S issues on the property not related to the drill pad.
1934236 Primary Facility 2010-11-24 Drilling/Alteration No Violations Noted USE RIG #7 DRILLED TO 318'. WILL RUN APPROX. 294' OF 95/8".
1934245 Primary Facility 2010-11-29 Drilling/Alteration No Violations Noted USE RIG # 7 HAS NOT RESUMED DRILLING SINCE 9 5/8" CASING WAS CEMENTED ON 11/24/10. THE PIT HAS BEEN DRAINED.
1934250 Primary Facility 2010-12-01 Drilling/Alteration No Violations Noted USE RIG # 7 DRILLED TO 1692' THEN RAN 1667' OF 7".
1934254 Primary Facility 2010-12-06 Drilling/Alteration No Violations Noted DRILLING COMPLETE. EQUIPTMENT MOVING OUT. SITE IS CLEAN. E&S IS OK. PIT LEVEL IS LOW.
1937867 Primary Facility 2010-12-14 Drilling/Alteration No Violations Noted 7" CASING IS SWEDGED TO 2". THERE IS NO 5". 9 5/8" CASING IS CUT OFF AND OPEN.
1937886 Primary Facility 2010-12-07 Compliance Evaluation No Violations Noted HAD MEETING WITH WQS BRIAN RANKIN, AND KELLY SOFALY FROM ALLEGHENY CONSERVATION, TO DISCUSS RUNOFF FROM THE PROPERTY. E&S PROBLEMS ON THIS PROPERTY ARE NOT RELATED TO THE DRILLING ACTIVITIES.
1940448 Primary Facility 2010-12-28 Routine/Complete Inspection No Violations Noted On December 24th, 2010 I conducted a routine inspecion of the above site. Drilling was completed. The access road was in good condition. A service rig was onsite installing tubing. A site ID sign and E&S plan were present. The pit was still open and appeared to be in good condition and had adequate freeboard. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is achieved.
1953935 Primary Facility 2011-01-18 Drilling/Alteration No Violations Noted DRILLING COMPLETE. 4.5" CASING IS IN. ANNULUS IS OPEN. SITE CLEAN. PIT DRAINED.
1958578 Primary Facility 2011-02-10 Routine/Complete Inspection No Violations Noted On February 10th, 2011 I conducted a routine inspecion of the above site. Drilling was completed but the well was not yet in production. The access road was in good condition. A site ID sign and E&S plan were present. The pit was still open and appeared to be in good condition and had adequate freeboard. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is achieved.

For data sources see[6]

References