X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0474083606000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0474083606000
 
| Well ID: 0474083606000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.093349, -111.045783 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.093349, -111.045783 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/06-36-047-08W4/0
 
| Location: 00/06-36-047-08W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/06-36-047-08 W4/00
 
| Location Alias 2: 00/06-36-047-08 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 047
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 08
 +
|-
 +
| Section: 36
 
|-
 
|-
 
| County/Municipality: [[County of Minburn No. 27,_Alberta|County of Minburn No. 27]]
 
| County/Municipality: [[County of Minburn No. 27,_Alberta|County of Minburn No. 27]]
Line 17: Line 27:
 
| Well Name: MERLAND ET AL KINSELLA 6-36-47-8
 
| Well Name: MERLAND ET AL KINSELLA 6-36-47-8
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Cenovus Energy Inc.]]
 
|-
 
|-
 
| License Number: 0078188
 
| License Number: 0078188
Line 29: Line 39:
 
| Final Drill Date: 1979-10-01
 
| Final Drill Date: 1979-10-01
 
|-
 
|-
| Well Total Depth: 737 m
+
| Well Total Depth: 737.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.093349
 
| Surface Hole Latitude: 53.093349
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1979-09-21
 +
| Obtained License
 +
|-
 +
| 1979-09-30
 +
| Drill Stem Test Performed
 +
|-
 +
| 1979-10-01
 +
| Finished Drilling
 +
|-
 +
| 1979-10-01
 +
| Lost Circulation Occurred
 +
|-
 +
| 1979-10-03
 +
| Production Casing Operation Performed
 +
|-
 +
| 1979-10-03
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1979-10-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-10-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1991-12-21
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1991-12-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1991-12-21
 +
| Plug Back Performed
 +
|-
 +
| 1991-12-21
 +
| Well Abandoned
 +
|-
 +
| 1991-12-21
 +
| Well Log Performed
 +
|-
 +
| 1991-12-21
 +
| Well Mode changed to Abandoned
 +
|-
 +
| 1991-12-22
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1992-10-29
 +
| Well Log Performed
 +
|-
 +
| 1992-10-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1992-10-30
 +
| Well Log Performed
 +
|-
 +
| 1992-10-31
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2016-05-19
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2016-05-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2016-06-02
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2016-06-02
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2016-06-02
 +
| Plug Back Performed
 +
|-
 +
| 2016-06-03
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2016-06-03
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2016-06-03
 +
| Plug Back Performed
 +
|-
 +
| 2017-06-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2017-07-04
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2017-07-06
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2017-07-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2017-07-07
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2017-07-08
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2017-07-08
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2017-07-08
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 204:
 
| 1979-10-28
 
| 1979-10-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 682
+
| style="text-align: right;" | 682.00
| style="text-align: right;" | 683.5
+
| style="text-align: right;" | 683.50
 
| style="text-align: right;" | 12
 
| style="text-align: right;" | 12
 
|-
 
|-
 
| 1979-10-30
 
| 1979-10-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 681
+
| style="text-align: right;" | 681.00
| style="text-align: right;" | 682
+
| style="text-align: right;" | 682.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1991-12-21
 
| 1991-12-21
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 666
+
| style="text-align: right;" | 666.00
| style="text-align: right;" | 674
+
| style="text-align: right;" | 674.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1991-12-21
 
| 1991-12-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 235
+
| style="text-align: right;" | 235.00
| style="text-align: right;" | 235.5
+
| style="text-align: right;" | 235.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1991-12-22
 
| 1991-12-22
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 235
+
| style="text-align: right;" | 235.00
| style="text-align: right;" | 235.5
+
| style="text-align: right;" | 235.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1992-10-30
 
| 1992-10-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 235.3
+
| style="text-align: right;" | 235.30
| style="text-align: right;" | 235.8
+
| style="text-align: right;" | 235.80
 
| style="text-align: right;" | 48
 
| style="text-align: right;" | 48
 
|-
 
|-
 
| 1992-10-31
 
| 1992-10-31
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 235.3
+
| style="text-align: right;" | 235.30
| style="text-align: right;" | 235.8
+
| style="text-align: right;" | 235.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016-05-19
 
| 2016-05-19
 
| Hydra Jet Perforation
 
| Hydra Jet Perforation
| style="text-align: right;" | 330.4
+
| style="text-align: right;" | 330.40
| style="text-align: right;" | 332.5
+
| style="text-align: right;" | 332.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016-05-20
 
| 2016-05-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 238.7
+
| style="text-align: right;" | 238.70
| style="text-align: right;" | 240
+
| style="text-align: right;" | 240.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2016-06-02
 
| 2016-06-02
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 330.4
+
| style="text-align: right;" | 330.40
| style="text-align: right;" | 332.5
+
| style="text-align: right;" | 332.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016-06-02
 
| 2016-06-02
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 319.5
+
| style="text-align: right;" | 319.50
| style="text-align: right;" | 328.7
+
| style="text-align: right;" | 328.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016-06-03
 
| 2016-06-03
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 238.7
+
| style="text-align: right;" | 238.70
| style="text-align: right;" | 240
+
| style="text-align: right;" | 240.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016-06-03
 
| 2016-06-03
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 222.5
+
| style="text-align: right;" | 222.50
| style="text-align: right;" | 236.3
+
| style="text-align: right;" | 236.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017-06-27
 
| 2017-06-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 208.7
+
| style="text-align: right;" | 208.70
| style="text-align: right;" | 210
+
| style="text-align: right;" | 210.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2017-07-04
 
| 2017-07-04
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 208.7
+
| style="text-align: right;" | 208.70
| style="text-align: right;" | 210
+
| style="text-align: right;" | 210.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017-07-06
 
| 2017-07-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 204
+
| style="text-align: right;" | 204.00
| style="text-align: right;" | 205.3
+
| style="text-align: right;" | 205.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2017-07-06
 
| 2017-07-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 204.7
+
| style="text-align: right;" | 204.70
| style="text-align: right;" | 206
+
| style="text-align: right;" | 206.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2017-07-06
 
| 2017-07-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 208.5
+
| style="text-align: right;" | 208.50
| style="text-align: right;" | 209.8
+
| style="text-align: right;" | 209.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2017-07-06
 
| 2017-07-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 208.9
+
| style="text-align: right;" | 208.90
| style="text-align: right;" | 210.2
+
| style="text-align: right;" | 210.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2017-07-06
 
| 2017-07-06
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 204
+
| style="text-align: right;" | 204.00
| style="text-align: right;" | 206
+
| style="text-align: right;" | 206.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017-07-07
 
| 2017-07-07
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 204
+
| style="text-align: right;" | 204.00
| style="text-align: right;" | 210.2
+
| style="text-align: right;" | 210.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017-07-08
 
| 2017-07-08
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 204
+
| style="text-align: right;" | 204.00
| style="text-align: right;" | 210.2
+
| style="text-align: right;" | 210.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017-07-08
 
| 2017-07-08
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 192
+
| style="text-align: right;" | 192.00
| style="text-align: right;" | 200.4
+
| style="text-align: right;" | 200.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017-07-08
 
| 2017-07-08
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 200.4
+
| style="text-align: right;" | 200.40
| style="text-align: right;" | 210.2
+
| style="text-align: right;" | 210.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 220: Line 350:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 266: Line 410:
 
|-
 
|-
 
| 2016-06-03
 
| 2016-06-03
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
| 2017-08-11
 
| 2017-08-11
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
|}
 
|}
Line 279: Line 423:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Alberta]][[Category:Wells]]
 
[[Category:Alberta]][[Category:Wells]]

Revision as of 14:18, 9 July 2020

Well Details

Well ID: 0474083606000
Loading map...
Location: 00/06-36-047-08W4/0
Location Alias: 00/06-36-47-08 W4M
Location Alias 2: 00/06-36-047-08 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 08
Section: 36
County/Municipality: County of Minburn No. 27
Well Name: MERLAND ET AL KINSELLA 6-36-47-8
Operator Name: Cenovus Energy Inc.
License Number: 0078188
License Date: 1979-09-21
License Status: RecCertified
Spud Date: 1979-09-28
Final Drill Date: 1979-10-01
Well Total Depth: 737.00 m
Surface Hole Latitude: 53.093349
Surface Hole Longitude: -111.045783

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-09-21 Obtained License
1979-09-30 Drill Stem Test Performed
1979-10-01 Finished Drilling
1979-10-01 Lost Circulation Occurred
1979-10-03 Production Casing Operation Performed
1979-10-03 Well Mode changed to Drilled and Cased
1979-10-28 Perforation Treatment Performed - Jet Perforation
1979-10-30 Perforation Treatment Performed - Jet Perforation
1991-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-12-21 Perforation Treatment Performed - Jet Perforation
1991-12-21 Plug Back Performed
1991-12-21 Well Abandoned
1991-12-21 Well Log Performed
1991-12-21 Well Mode changed to Abandoned
1991-12-22 Perforation Treatment Performed - Remedial Casing
1992-10-29 Well Log Performed
1992-10-30 Perforation Treatment Performed - Jet Perforation
1992-10-30 Well Log Performed
1992-10-31 Perforation Treatment Performed - Remedial Casing
2016-05-19 Perforation Treatment Performed - Abrasa-Jet Perforation
2016-05-20 Perforation Treatment Performed - Jet Perforation
2016-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-06-02 Perforation Treatment Performed - Cement Squeeze
2016-06-02 Plug Back Performed
2016-06-03 Perforation Treatment Performed - Cement Plug
2016-06-03 Perforation Treatment Performed - Cement Squeeze
2016-06-03 Plug Back Performed
2017-06-27 Perforation Treatment Performed - Jet Perforation
2017-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-07-06 Perforation Treatment Performed - Jet Perforation
2017-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-07-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-07-08 Perforation Treatment Performed - Cement Plug
2017-07-08 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-10-28 Perforation 682.00 683.50 12
1979-10-30 Perforation 681.00 682.00 13
1991-12-21 Packing Device Capped w/Cement 666.00 674.00 0
1991-12-21 Perforation 235.00 235.50 13
1991-12-22 Remedial Casing Cementing 235.00 235.50 0
1992-10-30 Perforation 235.30 235.80 48
1992-10-31 Remedial Casing Cementing 235.30 235.80 0
2016-05-19 Hydra Jet Perforation 330.40 332.50 0
2016-05-20 Perforation 238.70 240.00 13
2016-06-02 Cement Squeeze 330.40 332.50 0
2016-06-02 Packing Device Capped w/Cement 319.50 328.70 0
2016-06-03 Cement Squeeze 238.70 240.00 0
2016-06-03 Cement Plug 222.50 236.30 0
2017-06-27 Perforation 208.70 210.00 13
2017-07-04 Acid Treatment 208.70 210.00 0
2017-07-06 Perforation 204.00 205.30 13
2017-07-06 Perforation 204.70 206.00 13
2017-07-06 Perforation 208.50 209.80 13
2017-07-06 Perforation 208.90 210.20 13
2017-07-06 Acid Treatment 204.00 206.00 0
2017-07-07 Acid Treatment 204.00 210.20 0
2017-07-08 Remedial Casing Cementing 204.00 210.20 0
2017-07-08 Packing Device Capped w/Cement 192.00 200.40 0
2017-07-08 Cement Plug 200.40 210.20 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-10-01 Lost Circulation 737.00 737.00
2016-06-03 No Incident Encountered 0.00 0.00
2017-08-11 No Incident Encountered 0.00 0.00

For data sources see[5]

References