X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0374243606000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0374243606000
 
| Well ID: 0374243606000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.222639, -113.304955 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.222639, -113.304955 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/06-36-037-24W4/0
 
| Location: 00/06-36-037-24W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/06-36-037-24 W4/00
 
| Location Alias 2: 00/06-36-037-24 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 037
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 24
 +
|-
 +
| Section: 36
 
|-
 
|-
 
| County/Municipality: [[Red Deer County,_Alberta|Red Deer County]]
 
| County/Municipality: [[Red Deer County,_Alberta|Red Deer County]]
Line 17: Line 27:
 
| Well Name: LONG RUN MIKWAN 6-36-37-24
 
| Well Name: LONG RUN MIKWAN 6-36-37-24
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Long Run Exploration Ltd.]]
 
|-
 
|-
 
| License Number: 0113453
 
| License Number: 0113453
Line 29: Line 39:
 
| Final Drill Date: 1985-03-18
 
| Final Drill Date: 1985-03-18
 
|-
 
|-
| Well Total Depth: 1885 m
+
| Well Total Depth: 1885.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 52.222639
 
| Surface Hole Latitude: 52.222639
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1985-02-19
 +
| Obtained License
 +
|-
 +
| 1985-03-02
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1985-03-07
 +
| Drill Stem Test Performed
 +
|-
 +
| 1985-03-08
 +
| Drill Stem Test Performed
 +
|-
 +
| 1985-03-18
 +
| Finished Drilling
 +
|-
 +
| 1985-03-19
 +
| Well Log Performed
 +
|-
 +
| 1985-03-20
 +
| Drill Stem Test Performed
 +
|-
 +
| 1985-03-20
 +
| Well Log Performed
 +
|-
 +
| 1985-03-21
 +
| Drill Stem Test Performed
 +
|-
 +
| 1985-03-22
 +
| Drill Stem Test Performed
 +
|-
 +
| 1985-03-23
 +
| Drill Stem Test Performed
 +
|-
 +
| 1985-03-25
 +
| Production Casing Operation Performed
 +
|-
 +
| 1985-03-25
 +
| Rig Released
 +
|-
 +
| 1985-03-25
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1985-05-08
 +
| Well Log Performed
 +
|-
 +
| 1985-05-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1985-05-09
 +
| Well Log Performed
 +
|-
 +
| 1985-05-10
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1985-05-12
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1985-05-12
 +
| Well Log Performed
 +
|-
 +
| 1985-05-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1985-05-15
 +
| Well Log Performed
 +
|-
 +
| 1985-05-16
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1985-05-26
 +
| Well Began Production
 +
|-
 +
| 1985-05-26
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1985-05-26
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1988-10-13
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1988-10-13
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1989-06-29
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1990-11-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1990-11-30
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1992-10-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1992-10-07
 +
| Perforation Treatment Performed - Chemical Squeeze
 +
|-
 +
| 1992-10-08
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2000-11-10
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2000-11-10
 +
| Plug Back Performed
 +
|-
 +
| 2000-11-10
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2000-11-10
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2000-11-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-05-01
 +
| Perforation Treatment Performed - Bridge Plug No Cement Required
 +
|-
 +
| 2001-05-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 219:
 
| 1985-05-09
 
| 1985-05-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1809
+
| style="text-align: right;" | 1809.00
| style="text-align: right;" | 1811
+
| style="text-align: right;" | 1811.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1985-05-10
 
| 1985-05-10
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1809
+
| style="text-align: right;" | 1809.00
| style="text-align: right;" | 1811
+
| style="text-align: right;" | 1811.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1985-05-12
 
| 1985-05-12
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1809
+
| style="text-align: right;" | 1809.00
| style="text-align: right;" | 1811
+
| style="text-align: right;" | 1811.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1985-05-15
 
| 1985-05-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1809
+
| style="text-align: right;" | 1809.00
| style="text-align: right;" | 1811
+
| style="text-align: right;" | 1811.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1985-05-16
 
| 1985-05-16
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1809
+
| style="text-align: right;" | 1809.00
| style="text-align: right;" | 1811
+
| style="text-align: right;" | 1811.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1989-06-29
 
| 1989-06-29
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1809
+
| style="text-align: right;" | 1809.00
| style="text-align: right;" | 1811
+
| style="text-align: right;" | 1811.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1990-11-29
 
| 1990-11-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1809
+
| style="text-align: right;" | 1809.00
| style="text-align: right;" | 1812
+
| style="text-align: right;" | 1812.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1990-11-30
 
| 1990-11-30
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1809
+
| style="text-align: right;" | 1809.00
| style="text-align: right;" | 1812
+
| style="text-align: right;" | 1812.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1992-10-06
 
| 1992-10-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1808
+
| style="text-align: right;" | 1808.00
| style="text-align: right;" | 1811
+
| style="text-align: right;" | 1811.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 1992-10-07
 
| 1992-10-07
| Chemical Squeeze  
+
| Chemical Squeeze
| style="text-align: right;" | 1808
+
| style="text-align: right;" | 1808.00
| style="text-align: right;" | 1812
+
| style="text-align: right;" | 1812.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1992-10-08
 
| 1992-10-08
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1808
+
| style="text-align: right;" | 1808.00
| style="text-align: right;" | 1812
+
| style="text-align: right;" | 1812.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-11-10
 
| 2000-11-10
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1792
+
| style="text-align: right;" | 1792.00
| style="text-align: right;" | 1800
+
| style="text-align: right;" | 1800.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-11-12
 
| 2000-11-12
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1558
+
| style="text-align: right;" | 1558.00
| style="text-align: right;" | 1561
+
| style="text-align: right;" | 1561.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2001-05-01
 
| 2001-05-01
 
| Bridge Plug, No Cement
 
| Bridge Plug, No Cement
| style="text-align: right;" | 1555
+
| style="text-align: right;" | 1555.00
| style="text-align: right;" | 1555.3
+
| style="text-align: right;" | 1555.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-05-02
 
| 2001-05-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1544
+
| style="text-align: right;" | 1544.00
| style="text-align: right;" | 1547
+
| style="text-align: right;" | 1547.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
Line 166: Line 311:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 199: Line 358:
 
| 1985
 
| 1985
 
| style="text-align: right;" | 4755
 
| style="text-align: right;" | 4755
| style="text-align: right;" | 203.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 10.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1986
 
| 1986
 
| style="text-align: right;" | 6184
 
| style="text-align: right;" | 6184
| style="text-align: right;" | 202.0
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 211: Line 370:
 
| 1987
 
| 1987
 
| style="text-align: right;" | 7129
 
| style="text-align: right;" | 7129
| style="text-align: right;" | 244.4
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 217: Line 376:
 
| 1988
 
| 1988
 
| style="text-align: right;" | 7017
 
| style="text-align: right;" | 7017
| style="text-align: right;" | 219.9
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 223: Line 382:
 
| 1989
 
| 1989
 
| style="text-align: right;" | 8036
 
| style="text-align: right;" | 8036
| style="text-align: right;" | 62.3
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 229: Line 388:
 
| 1990
 
| 1990
 
| style="text-align: right;" | 7117
 
| style="text-align: right;" | 7117
| style="text-align: right;" | 8.6
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 6.5
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1991
 
| 1991
 
| style="text-align: right;" | 831
 
| style="text-align: right;" | 831
| style="text-align: right;" | 2.4
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 241: Line 400:
 
| 1992
 
| 1992
 
| style="text-align: right;" | 1330
 
| style="text-align: right;" | 1330
| style="text-align: right;" | 5.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 479.5
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 249: Line 408:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 21:17, 8 July 2020

Well Details

Well ID: 0374243606000
Loading map...
Location: 00/06-36-037-24W4/0
Location Alias: 00/06-36-37-24 W4M
Location Alias 2: 00/06-36-037-24 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 24
Section: 36
County/Municipality: Red Deer County
Well Name: LONG RUN MIKWAN 6-36-37-24
Operator Name: Long Run Exploration Ltd.
License Number: 0113453
License Date: 1985-02-19
License Status: Suspension
Spud Date: 1985-03-01
Final Drill Date: 1985-03-18
Well Total Depth: 1885.00 m
Surface Hole Latitude: 52.222639
Surface Hole Longitude: -113.304955

For data sources see[1][2]

Well History

Date Event
1985-02-19 Obtained License
1985-03-02 Surface Casing Operation Performed
1985-03-07 Drill Stem Test Performed
1985-03-08 Drill Stem Test Performed
1985-03-18 Finished Drilling
1985-03-19 Well Log Performed
1985-03-20 Drill Stem Test Performed
1985-03-20 Well Log Performed
1985-03-21 Drill Stem Test Performed
1985-03-22 Drill Stem Test Performed
1985-03-23 Drill Stem Test Performed
1985-03-25 Production Casing Operation Performed
1985-03-25 Rig Released
1985-03-25 Well Mode changed to Drilled and Cased
1985-05-08 Well Log Performed
1985-05-09 Perforation Treatment Performed - Jet Perforation
1985-05-09 Well Log Performed
1985-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-12 Perforation Treatment Performed - Cement Squeeze
1985-05-12 Well Log Performed
1985-05-15 Perforation Treatment Performed - Jet Perforation
1985-05-15 Well Log Performed
1985-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-26 Well Began Production
1985-05-26 Well Fluid changed to Crude Oil
1985-05-26 Well Mode changed to Flowing
1988-10-13 Well Fluid changed to Crude Oil
1988-10-13 Well Mode changed to Pumping
1989-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-29 Perforation Treatment Performed - Jet Perforation
1990-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-06 Perforation Treatment Performed - Jet Perforation
1992-10-07 Perforation Treatment Performed - Chemical Squeeze
1992-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-10 Plug Back Performed
2000-11-10 Well Fluid changed to Crude Oil
2000-11-10 Well Mode changed to Abandoned Zone
2000-11-12 Perforation Treatment Performed - Jet Perforation
2001-05-01 Perforation Treatment Performed - Bridge Plug No Cement Required
2001-05-02 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-05-09 Perforation 1809.00 1811.00 13
1985-05-10 Acid Treatment 1809.00 1811.00 0
1985-05-12 Cement Squeeze 1809.00 1811.00 0
1985-05-15 Perforation 1809.00 1811.00 13
1985-05-16 Acid Treatment 1809.00 1811.00 0
1989-06-29 Acid Treatment 1809.00 1811.00 0
1990-11-29 Perforation 1809.00 1812.00 13
1990-11-30 Acid Treatment 1809.00 1812.00 0
1992-10-06 Perforation 1808.00 1811.00 14
1992-10-07 Chemical Squeeze 1808.00 1812.00 0
1992-10-08 Acid Treatment 1808.00 1812.00 0
2000-11-10 Packing Device Capped w/Cement 1792.00 1800.00 0
2000-11-12 Perforation 1558.00 1561.00 14
2001-05-01 Bridge Plug, No Cement 1555.00 1555.30 0
2001-05-02 Perforation 1544.00 1547.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 4755 0.0 0.0 0.0
1986 6184 0.0 0.0 0.0
1987 7129 0.0 0.0 0.0
1988 7017 0.0 0.0 0.0
1989 8036 0.0 0.0 0.0
1990 7117 0.0 0.0 0.0
1991 831 0.0 0.0 0.0
1992 1330 0.0 0.0 0.0

For data sources see[5]

References