X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0385033210000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0385033210000
 
| Well ID: 0385033210000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.31353300000000672, -114.39073799999999892 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.313533, -114.390738 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/10-32-038-03W5/0
 
| Location: 00/10-32-038-03W5/0
 +
|-
 +
| Location Alias: 00/10-32-38-03 W5M
 +
|-
 +
| Location Alias 2: 00/10-32-038-03 W5/00
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Lacombe County,_Alberta|Lacombe County]]
 
|-
 
|-
 
| Well Name: BP CANADA ULC MEDRIV 10-32-38-3
 
| Well Name: BP CANADA ULC MEDRIV 10-32-38-3
 +
|-
 +
| Operator Name:
 +
|-
 +
| License Number: 0015913
 
|-
 
|-
 
| License Date: 1958-09-15
 
| License Date: 1958-09-15
 
|-
 
|-
| Final Drilling Date: 1958-10-13
+
| License Status: Abandoned
 
|-
 
|-
| Total Depth: 2231.4m
+
| Spud Date: 1958-09-21
 
|-
 
|-
| Fluid Type: Water
+
| Final Drill Date: 1958-10-13
 
|-
 
|-
| Status: Abandoned
+
| Well Total Depth: 2231.4 m
 
|-
 
|-
| Well Type: Disposal
+
| Surface Hole Latitude: 52.313533
 
|-
 
|-
| Configuration: Vertical
+
| Surface Hole Longitude: -114.390738
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
| Latitude: 52.31353300000000672
+
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
| Longitude: -114.39073799999999892
+
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1958-10-17
 +
| Bullet Perforation
 +
| style="text-align: right;" | 2191.5
 +
| style="text-align: right;" | 2197.6
 +
| style="text-align: right;" | 10
 +
|-
 +
| 1958-10-18
 +
| Acid Treatment
 +
| style="text-align: right;" | 2191.5
 +
| style="text-align: right;" | 2197.6
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1958-10-18
 +
| Acid Treatment
 +
| style="text-align: right;" | 2191.5
 +
| style="text-align: right;" | 2197.6
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1958-11-25
 +
| Bullet Perforation
 +
| style="text-align: right;" | 2220.8
 +
| style="text-align: right;" | 2223.8
 +
| style="text-align: right;" | 20
 +
|-
 +
| 1958-11-27
 +
| Acid Treatment
 +
| style="text-align: right;" | 2220.8
 +
| style="text-align: right;" | 2223.8
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-10-17
 +
| Acid Treatment
 +
| style="text-align: right;" | 2220.8
 +
| style="text-align: right;" | 2223.8
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-10-19
 +
| Acid Treatment
 +
| style="text-align: right;" | 2220.8
 +
| style="text-align: right;" | 2223.8
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1963-07-06
 +
| Acid Treatment
 +
| style="text-align: right;" | 2220.8
 +
| style="text-align: right;" | 2223.8
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1963-08-09
 +
| Acid Treatment
 +
| style="text-align: right;" | 2220.8
 +
| style="text-align: right;" | 2223.8
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 1964-05-28
 +
| Acid Treatment
 +
| style="text-align: right;" | 2220.8
 +
| style="text-align: right;" | 2223.8
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-05-29
 +
| Acid Treatment
 +
| style="text-align: right;" | 2191.5
 +
| style="text-align: right;" | 2223.8
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1967-10-02
 +
| Acid Treatment
 +
| style="text-align: right;" | 2191.5
 +
| style="text-align: right;" | 2223.8
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-12-12
 +
| Cement Plug
 +
| style="text-align: right;" | 1929.2
 +
| style="text-align: right;" | 2106
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-12-16
 +
| Cement Plug
 +
| style="text-align: right;" | 1612.1
 +
| style="text-align: right;" | 1656.5
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-12-20
 +
| Cement Plug
 +
| style="text-align: right;" | 169.4
 +
| style="text-align: right;" | 206.9
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1961
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 7362.2
 +
|-
 +
| 1962
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 3587.3
 +
|-
 +
| 1963
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 11277.6
 +
|-
 +
| 1964
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 21809.7
 +
|-
 +
| 1965
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 12451.4
 +
|-
 +
| 1966
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 10826.0
 +
|-
 +
| 1967
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 13759.0
 +
|-
 +
| 1968
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 14196.0
 +
|-
 +
| 1969
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 15304.1
 +
|-
 +
| 1970
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 19223.4
 +
|-
 +
| 1971
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 12992.1
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-04-24
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 08:45, 9 June 2019

Well Details

Well ID: 0385033210000
Loading map...
Location: 00/10-32-038-03W5/0
Location Alias: 00/10-32-38-03 W5M
Location Alias 2: 00/10-32-038-03 W5/00
Province: Alberta
County/Municipality: Lacombe County
Well Name: BP CANADA ULC MEDRIV 10-32-38-3
Operator Name:
License Number: 0015913
License Date: 1958-09-15
License Status: Abandoned
Spud Date: 1958-09-21
Final Drill Date: 1958-10-13
Well Total Depth: 2231.4 m
Surface Hole Latitude: 52.313533
Surface Hole Longitude: -114.390738

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-10-17 Bullet Perforation 2191.5 2197.6 10
1958-10-18 Acid Treatment 2191.5 2197.6 0
1958-10-18 Acid Treatment 2191.5 2197.6 0
1958-11-25 Bullet Perforation 2220.8 2223.8 20
1958-11-27 Acid Treatment 2220.8 2223.8 0
1962-10-17 Acid Treatment 2220.8 2223.8 0
1962-10-19 Acid Treatment 2220.8 2223.8 0
1963-07-06 Acid Treatment 2220.8 2223.8 0
1963-08-09 Acid Treatment 2220.8 2223.8 0
1964-05-28 Acid Treatment 2220.8 2223.8 0
1964-05-29 Acid Treatment 2191.5 2223.8 0
1967-10-02 Acid Treatment 2191.5 2223.8 0
1980-12-12 Cement Plug 1929.2 2106 0
1980-12-16 Cement Plug 1612.1 1656.5 0
1980-12-20 Cement Plug 169.4 206.9 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 7362.2
1962 0 0.0 0.0 3587.3
1963 0 0.0 0.0 11277.6
1964 0 0.0 0.0 21809.7
1965 0 0.0 0.0 12451.4
1966 0 0.0 0.0 10826.0
1967 0 0.0 0.0 13759.0
1968 0 0.0 0.0 14196.0
1969 0 0.0 0.0 15304.1
1970 0 0.0 0.0 19223.4
1971 0 0.0 0.0 12992.1

For data sources see[4]

References