If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Line 4: | Line 4: | ||
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.281436, -78.690097 | width=100% | height=100% }} | | style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.281436, -78.690097 | width=100% | height=100% }} | ||
|- | |- | ||
− | | County: [[ | + | | County: [[Cambria County, Pennsylvania|Cambria]] |
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Adams Township, Cambria County, Pennsylvania|Adams Township]] |
|- | |- | ||
− | | Operator Name: [[ | + | | Operator Name: [[CHEVRON APPALACHIA LLC|CHEVRON APPALACHIA LLC]] |
|- | |- | ||
| Farm/Lease Name: PMG RABY UNIT 3H | | Farm/Lease Name: PMG RABY UNIT 3H |
Well ID: 021-21175 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.281436,"lon":-78.690097,"icon":""}]} |
County: Cambria | |
Municipality: Adams Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Farm/Lease Name: PMG RABY UNIT 3H | |
First Permit Date: 2011-03-29 | |
Last Permit Date: 2011-03-29 | |
Spud Date: 2011-11-11 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 40.281436 | |
Longitude: -78.690097 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2016193 | 2011-11-01 | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Site sign and E&S plan present. Well marker not present. Spud called on 10/31/11. Called Chevron to request well marker placed prior to drilling activity. | |
2020140 | 2011-11-17 | No Violations Noted | At the time of inspection, well ID sign and Es plan present. Share access road stable. Rig onsite actively drilling top hole on 3h, 2h and 1H previously drilled yet not in production. Secondary containment installed beneath rig as well as tanks. Tanks located onsite appear structurally sound. Bmp's installed and functioning according to ES plan. Presviously disturbed areas appear to be seeded and muclhed with observed growth. Operator shall continue to monitor and maintain all bmp's until final/permanent restoration is achieved.
Noted that sediment trap located behind well site appears full--left Chevron Rep Curtis Small message regarding possible cleanout of sediment trap. As with last inspection, waters contained in sediment trap appear "black"- samples taken no anomalies found; therefore, discoloration believed to be result of decomposition of materials. No violations noted during this inspection. |
|
2020358 | 2011-11-17 | No Violations Noted | t the time of inspection, no E&S or IW discharge issues at the site. Site sign and E&S plan present. Spud called on 10/31/11. Chevron representative was Ron Freed (Total Energy Services) and contracted Yost drilling. Conductor pipe (20¿) was set at 40 feet and was grouted in place. First water surface stringer (20¿) was set at 75 feet. This pipe was cemented by Superior with 125 sks of Class A and 1 bbls return to surface. Chevron was at 550 feet and encountered water bearing zone at 520 feet. Chevron was drilling to 600 feet and set the second water bearing stringer (13 3/8¿ pipe). | |
2020381 | 2011-11-15 | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Site sign and E&S plan present. Spud called on 10/31/11. Chevron representative was Ron Freed (Total Energy Services) and contracted Yost drilling. Conductor pipe (20¿) was set at 40 feet and was grouted in place. First water surface stringer (20¿) was set at 75 feet. This pipe was cemented by Superior with 125 sks of Class A and 1 bbls return to surface. As per the alternate plan, Chevron was drilling to 600 feet and set the second surface stringer (13 3/8¿ pipe). | |
2049818 | 2012-03-01 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production. | |
2058700 | 2012-04-03 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production. | |
2067283 | 2012-05-01 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production. | |
2093083 | 2012-06-12 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2011-2 | DRILLING FLUID WASTE | 287.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0253723 | APPALACHIAN WATER SERVICES LLC (RONCO WTP) | MASONTOWN | PA |