Difference between revisions of "34-029-21805"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-029-21805
 
| Well ID: 34-029-21805
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.7490147346, -80.9022153376 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.74901473, -80.90221534 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Columbiana County, Ohio|Columbiana]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-09-04
 
| Spud Date: 2013-09-04
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.7490147346
+
| Latitude: 40.74901473
 
|-
 
|-
| Longitude: -80.9022153376
+
| Longitude: -80.90221534
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 21917.0
 +
| style="text-align:right;" | 6.0
 +
|
 +
|
 +
| style="text-align:right;" | 704.0
 +
| style="text-align:right;" | 6.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 256935.0
 +
| style="text-align:right;" | 92.0
 +
|
 +
|
 +
| style="text-align:right;" | 5525.0
 +
| style="text-align:right;" | 92.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 138135.0
 +
| style="text-align:right;" | 89.0
 +
|
 +
|
 +
| style="text-align:right;" | 2120.0
 +
| style="text-align:right;" | 89.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 85:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
|-
 
| -2143033912
 
| 2013-04-17
 
|
 
| I went to the site and conducted a pre-construction site inspection with Steve Ault, Chesapeake Field Representative.
 
|
 
|
 
|
 
|-
 
|-
 
| -553059832
 
| 2013-11-14
 
|
 
 
 
|
 
|
 
|
 
|-
 
|-
 
| -836266621
 
| 2013-11-08
 
|
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1316569684
 
| 1316569684
 
| 2013-09-05
 
| 2013-09-05
|
+
|  
| I witnessed the cementing of the conductor casing.  Express Energy Services drilled a 26" diameter hole to 120'.  Express installed 120' of 20" OD casing.  During drilling, the borehole got damp at an approximate depth of 80', but did not produce much water.  Allied Oil & Gas Services was the cementing contractor.  The cement slurry was mudscaled at 15.6 pounds per gallon (ppg).  Allied pumped 52.4 bbls of cement slurry at 15.6 ppg.  The cement was displaced with 39 bbls of water.  An estimated 15 bbls of cement slurry returned to surface.  Displacement was completed at 1:28pm.
+
| I witnessed the cementing of the conductor casing.  Express Energy Services drilled a 26 diameter hole to 120'.  Express installed 120' of 20 OD casing.  During drilling, the borehole got damp at an approximate depth of 80', but did not produce much water.  Allied Oil & Gas Services was the cementing contractor.  The cement slurry was mudscaled at 15.6 pounds per gallon (ppg).  Allied pumped 52.4 bbls of cement slurry at 15.6 ppg.  The cement was displaced with 39 bbls of water.  An estimated 15 bbls of cement slurry returned to surface.  Displacement was completed at 1:28pm.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1384272283
 
| 1384272283
 
| 2013-11-04
 
| 2013-11-04
|
+
|  
 
+
| I was at the site checking the drilling progress.  Nomac 43 had reached total depth of the 17.50
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1406728058
 
| 1406728058
 
| 2014-05-20
 
| 2014-05-20
|
+
|  
 
| I stopped by the site to check on the status of well completion and restoration.  The well has been hydraulically fractured. At this time a work over rig is installing 2-7/8 tubing.  Production equipment is on site but not hooked up.  I didnot walk the entire site due to the active. All erosion and sedimentation controls, and drainage controls appear to be functioning.  Ground cover is well established along the access road and around the drilling pad.  No areas of erosion are present.  Preliminary restoration approval will not be finalized pending installation of production equipment.
 
| I stopped by the site to check on the status of well completion and restoration.  The well has been hydraulically fractured. At this time a work over rig is installing 2-7/8 tubing.  Production equipment is on site but not hooked up.  I didnot walk the entire site due to the active. All erosion and sedimentation controls, and drainage controls appear to be functioning.  Ground cover is well established along the access road and around the drilling pad.  No areas of erosion are present.  Preliminary restoration approval will not be finalized pending installation of production equipment.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1813027455
 
| 1813027455
 
| 2013-09-03
 
| 2013-09-03
|
+
|  
 
| I stopped at the drilling pad to check on the conductor rig move-in progress.  I found pipe trucks from Express Energy Services on site.  Express personnel told me that the rig was expected shortly.
 
| I stopped at the drilling pad to check on the conductor rig move-in progress.  I found pipe trucks from Express Energy Services on site.  Express personnel told me that the rig was expected shortly.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -2143033912
 +
| 2013-04-17
 +
|
 +
| I went to the site and conducted a pre-construction site inspection with Steve Ault, Chesapeake Field Representative.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 225811777
 
| 225811777
 
| 2013-11-06
 
| 2013-11-06
|
+
|  
 
+
| I was at the site to witness the cementing of the intermediate casing.  The drilling contractor, Nomac 43, drilled a 12.25 diameter hole to 1515
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 276465650
 +
| 2014-10-24
 +
|
 +
| I was on site to assess the completion of preliminary restoration.  The pad is shared between #21805 (Judy Brown #3H) and #21823 (Judy Brown #6H).There is a sign board at the access road entry featuring the well name, permit number and emergency contact information. Identification is also posted at the wellhead and tank battery. The access road has a padlocked gate near Haessly Road.  The access road is in good repair, and drainage and erosion controls are in place.  Ground cover is well established along the access road.  I found the production pad to be enclosed entirely with a chain link fence with barbed wire at the top, and with a padlocked gate.  The fence is in good repair.  The pad has a crushed limestone surface, and is in good repair.  The well is constructed with a
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -553059832
 +
| 2013-11-14
 +
|
 +
| I went to the site to witness the cementing of the production casing.  The drilling contractor, Nomac 43, drilled an 8.75 diameter hole from beneath the base of the intermediate casing at 1499
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 611148086
 
| 611148086
 
| 2013-07-23
 
| 2013-07-23
|
+
|  
 
| I went to the site to review the construction process of the drilling pad.  The access road is complete.  The road has a crushed limestone surface, and erosion controls are in place.  The area of disturbance is seeded and covered with straw.  There is a gate with a padlock at the access road entrance.  The pad is complete.  There is a berm and a chain link fence surrounding the site.  There is a padlocked gate in the fence.  The area of disturbance and the soil stockpiles have been stabilized.  There are two cellars installed at the pad denoted as the Judy Brown 3H and 6H.  Each is surrounded by a bull fence to prevent falls.  Additionally, two site drains to control precipitation on the pad have been installed.
 
| I went to the site to review the construction process of the drilling pad.  The access road is complete.  The road has a crushed limestone surface, and erosion controls are in place.  The area of disturbance is seeded and covered with straw.  There is a gate with a padlock at the access road entrance.  The pad is complete.  There is a berm and a chain link fence surrounding the site.  There is a padlocked gate in the fence.  The area of disturbance and the soil stockpiles have been stabilized.  There are two cellars installed at the pad denoted as the Judy Brown 3H and 6H.  Each is surrounded by a bull fence to prevent falls.  Additionally, two site drains to control precipitation on the pad have been installed.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -836266621
 +
| 2013-11-08
 +
|
 +
| I was at the site for a drilling status check.  I met with drilling consultant Larry Williamson.  The rig was drilling the vertical section at 5822
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 905550400
 
| 905550400
 
| 2013-11-04
 
| 2013-11-04
|
+
|  
 
+
| I was at the site to witness the cementing of the surface casing.  The drilling contractor, Nomac 43, spudded the surface section of the well on 11/04/2013.  The 17.50 diameter surface hole was drilled to 704
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 04:14, 16 July 2015

Well Details

Well ID: 34-029-21805
Loading map...
County: Columbiana
Municipality:
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-09-04
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.74901473
Longitude: -80.90221534

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2014-3 21917.0 6.0 704.0 6.0
2014-4 256935.0 92.0 5525.0 92.0
2015-1 138135.0 89.0 2120.0 89.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1316569684 2013-09-05 I witnessed the cementing of the conductor casing. Express Energy Services drilled a 26 diameter hole to 120'. Express installed 120' of 20 OD casing. During drilling, the borehole got damp at an approximate depth of 80', but did not produce much water. Allied Oil & Gas Services was the cementing contractor. The cement slurry was mudscaled at 15.6 pounds per gallon (ppg). Allied pumped 52.4 bbls of cement slurry at 15.6 ppg. The cement was displaced with 39 bbls of water. An estimated 15 bbls of cement slurry returned to surface. Displacement was completed at 1:28pm.
1384272283 2013-11-04 I was at the site checking the drilling progress. Nomac 43 had reached total depth of the 17.50
1406728058 2014-05-20 I stopped by the site to check on the status of well completion and restoration. The well has been hydraulically fractured. At this time a work over rig is installing 2-7/8 tubing. Production equipment is on site but not hooked up. I didnot walk the entire site due to the active. All erosion and sedimentation controls, and drainage controls appear to be functioning. Ground cover is well established along the access road and around the drilling pad. No areas of erosion are present. Preliminary restoration approval will not be finalized pending installation of production equipment.
1813027455 2013-09-03 I stopped at the drilling pad to check on the conductor rig move-in progress. I found pipe trucks from Express Energy Services on site. Express personnel told me that the rig was expected shortly.
-2143033912 2013-04-17 I went to the site and conducted a pre-construction site inspection with Steve Ault, Chesapeake Field Representative.
225811777 2013-11-06 I was at the site to witness the cementing of the intermediate casing. The drilling contractor, Nomac 43, drilled a 12.25 diameter hole to 1515
276465650 2014-10-24 I was on site to assess the completion of preliminary restoration. The pad is shared between #21805 (Judy Brown #3H) and #21823 (Judy Brown #6H).There is a sign board at the access road entry featuring the well name, permit number and emergency contact information. Identification is also posted at the wellhead and tank battery. The access road has a padlocked gate near Haessly Road. The access road is in good repair, and drainage and erosion controls are in place. Ground cover is well established along the access road. I found the production pad to be enclosed entirely with a chain link fence with barbed wire at the top, and with a padlocked gate. The fence is in good repair. The pad has a crushed limestone surface, and is in good repair. The well is constructed with a
-553059832 2013-11-14 I went to the site to witness the cementing of the production casing. The drilling contractor, Nomac 43, drilled an 8.75 diameter hole from beneath the base of the intermediate casing at 1499
611148086 2013-07-23 I went to the site to review the construction process of the drilling pad. The access road is complete. The road has a crushed limestone surface, and erosion controls are in place. The area of disturbance is seeded and covered with straw. There is a gate with a padlock at the access road entrance. The pad is complete. There is a berm and a chain link fence surrounding the site. There is a padlocked gate in the fence. The area of disturbance and the soil stockpiles have been stabilized. There are two cellars installed at the pad denoted as the Judy Brown 3H and 6H. Each is surrounded by a bull fence to prevent falls. Additionally, two site drains to control precipitation on the pad have been installed.
-836266621 2013-11-08 I was at the site for a drilling status check. I met with drilling consultant Larry Williamson. The rig was drilling the vertical section at 5822
905550400 2013-11-04 I was at the site to witness the cementing of the surface casing. The drilling contractor, Nomac 43, spudded the surface section of the well on 11/04/2013. The 17.50 diameter surface hole was drilled to 704

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.