If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-125-27175 | | Well ID: 37-125-27175 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.27768, -80.027391 | width=100% | height=100% }} |
+ | |- | ||
+ | | County: [[Washington County, Pennsylvania|Washington]] | ||
+ | |- | ||
+ | | Municipality: [[Union Township, Washington County, Pennsylvania|Union Township]] | ||
|- | |- | ||
| Operator Name: [[EQT PRODUCTION CO]] | | Operator Name: [[EQT PRODUCTION CO]] | ||
|- | |- | ||
− | | Well Pad ID: [[145422]] | + | | Well Pad ID: [[145422|145422]] |
+ | |- | ||
+ | | Farm/Lease Name: TRAX FARMS 592310 | ||
|- | |- | ||
| First Permit Date: 2013-11-12 | | First Permit Date: 2013-11-12 | ||
Line 17: | Line 23: | ||
| Unconventional: Yes | | Unconventional: Yes | ||
|- | |- | ||
− | | Horizontal: | + | | Horizontal: Yes |
|- | |- | ||
− | | Violations: | + | | Well Status: ACTIVE |
+ | |- | ||
+ | | Violations: 0 | ||
|- | |- | ||
| Latitude: 40.27768 | | Latitude: 40.27768 | ||
Line 37: | Line 45: | ||
|- | |- | ||
| 2013-2 | | 2013-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-02 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-01 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-03 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 45: | Line 98: | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 56: | Line 115: | ||
!scope="col" | FACILITY CITY | !scope="col" | FACILITY CITY | ||
!scope="col" | FACILITY STATE | !scope="col" | FACILITY STATE | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | DRILL CUTTINGS | ||
+ | | style="text-align:right;" | 172.63 | ||
+ | | Tons | ||
+ | | LANDFILL | ||
+ | | PAD059087072 | ||
+ | | MAX ENVIRONMENTAL TECHNOLOGIES INC BULGER FACILITY | ||
+ | | BULGER | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | DRILL CUTTINGS | ||
+ | | style="text-align:right;" | 234.41 | ||
+ | | Tons | ||
+ | | RESIDUAL WASTE TRANSFER FACILITY | ||
+ | | PAD004835146 | ||
+ | | MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY | ||
+ | | YUKON | ||
+ | | PA | ||
+ | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Waste Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 151: | ||
!scope="col" | COMMENT | !scope="col" | COMMENT | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
|- | |- | ||
| 2231156 | | 2231156 | ||
| 2013-12-02 | | 2013-12-02 | ||
− | |||
− | |||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 2239667 | | 2239667 | ||
| 2013-12-27 | | 2013-12-27 | ||
− | |||
− | |||
| No Violations Noted | | No Violations Noted | ||
+ | | Alpha Hunter Rig 4. | ||
+ | Well 592310 was spud on 12/20/2013 at 07:00. Drilling on top portion ended on 12/27/2013 with 9 5/8ï¾” casing being set at 2688 ft. | ||
+ | All casing strings were cemented to surface as planned except for 20ï¾” casing. It was necessary to do grout job on 20ï¾” casing (pumped 62 bbls and got cement to surface). | ||
+ | |||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2306037 | ||
+ | | 2014-09-17 | ||
+ | | No Violations Noted | ||
+ | | Site ID sign was correct. ESCGP was on-site. AST was erected on pad. No E&S issues noted. Well labels need updated. The site inspection was conducted concurrently with inspections for its associated wells. Wells on this pad target the Marcellus or Geneseo layers. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2342440 | ||
+ | | 2015-02-06 | ||
+ | | No Violations Noted | ||
+ | | Nabors Completion and Production Services Finished fracturing stage 19 of 26 stages planned for this well. Stage 19 is 120 ft. long and took approximately 1 hour and 23 min. to complete. There were 40 shots were used to perforate the stage. Currently preparing to start stage 20. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2344556 | ||
+ | | 2015-02-17 | ||
+ | | No Violations Noted | ||
+ | | Nabors Completion and Production Services Finished fracturing stage 26 on 2/8/15. Stage 26 was the last stage for this well. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2349789 | ||
+ | | 2015-03-05 | ||
+ | | No Violations Noted | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2356562 | ||
+ | | 2015-03-31 | ||
+ | | No Violations Noted | ||
+ | | C&J Energy Services Started coiled tubing frack plug drill out on 3/29/15. Currently coming out of hole after finishing drilling out last plug. A gel sweep is run every 5th plug and a short trip is run every 8th plug to clean hole. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
− | ==References== | + | For data sources see<ref>{{cite web |
− | {{ | + | | title = Oil and Gas Historical Inspection Report |
− | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-125-27175 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.27768,"lon":-80.027391,"icon":""}]} |
County: Washington | |
Municipality: Union Township | |
Operator Name: EQT PRODUCTION CO | |
Well Pad ID: 145422 | |
Farm/Lease Name: TRAX FARMS 592310 | |
First Permit Date: 2013-11-12 | |
Last Permit Date: 2014-02-13 | |
Spud Date: 2013-11-14 | |
Unconventional: Yes | |
Horizontal: Yes | |
Well Status: ACTIVE | |
Violations: 0 | |
Latitude: 40.27768 | |
Longitude: -80.027391 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-02 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-01 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-03 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2014-1 | DRILL CUTTINGS | 172.63 | Tons | LANDFILL | PAD059087072 | MAX ENVIRONMENTAL TECHNOLOGIES INC BULGER FACILITY | BULGER | PA |
2014-1 | DRILL CUTTINGS | 234.41 | Tons | RESIDUAL WASTE TRANSFER FACILITY | PAD004835146 | MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY | YUKON | PA |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
2231156 | 2013-12-02 | No Violations Noted | ||||
2239667 | 2013-12-27 | No Violations Noted | Alpha Hunter Rig 4.
Well 592310 was spud on 12/20/2013 at 07:00. Drilling on top portion ended on 12/27/2013 with 9 5/8ï¾” casing being set at 2688 ft. All casing strings were cemented to surface as planned except for 20ï¾” casing. It was necessary to do grout job on 20ï¾” casing (pumped 62 bbls and got cement to surface). |
|||
2306037 | 2014-09-17 | No Violations Noted | Site ID sign was correct. ESCGP was on-site. AST was erected on pad. No E&S issues noted. Well labels need updated. The site inspection was conducted concurrently with inspections for its associated wells. Wells on this pad target the Marcellus or Geneseo layers. | |||
2342440 | 2015-02-06 | No Violations Noted | Nabors Completion and Production Services Finished fracturing stage 19 of 26 stages planned for this well. Stage 19 is 120 ft. long and took approximately 1 hour and 23 min. to complete. There were 40 shots were used to perforate the stage. Currently preparing to start stage 20. | |||
2344556 | 2015-02-17 | No Violations Noted | Nabors Completion and Production Services Finished fracturing stage 26 on 2/8/15. Stage 26 was the last stage for this well. | |||
2349789 | 2015-03-05 | No Violations Noted | ||||
2356562 | 2015-03-31 | No Violations Noted | C&J Energy Services Started coiled tubing frack plug drill out on 3/29/15. Currently coming out of hole after finishing drilling out last plug. A gel sweep is run every 5th plug and a short trip is run every 8th plug to clean hole. |
For data sources see[3]